1 RFP 2 X 75 MW Gipcl Gsecl at Charanka - PDFCOFFEE.COM (2025)

RFP Document No. GIPCL/ Solar/EPC/2017/2x75 MW (AC) Solar PV/ Rev. 1.0

18th December, 2017

BID FOR DESIGN, ENGINEERING, SUPPLY & PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 2X 75MW (AC) SOLAR PHOTOVOLTAIC GRID-CONNECTED POWER PLANT AT GUJARAT SOLAR PARK, VILLAGE CHARANKA, TALUKA SANTALPUR, GUJARAT

Issued by Gujarat Industries Power Company Limited (GIPCL) GIPCL CORPORATE OFFICE, PO: PETROCHEMICALS-391 346 DIST.: VADODARA, GUJARAT Ph. No: +91-265 – 2230182 /+91-2629-261075 FAX No: +91-265-2231207 / +91-2629-261080 Website: www. gipcl.com Email: [emailprotected]; [emailprotected];

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Gujarat Industries Power Company Limited (GIPCL) (Regd. Office: PO: Petrochemicals-391346, Dist: Vadodara, Gujarat) Website: - www.gipcl.com

BID FOR DESIGN, ENGINEERING, SUPPLY & PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 2X 75MW (AC) SOLAR PHOTOVOLTAIC GRID-CONNECTED POWER PLANT AT GUJARAT SOLAR PARK, VILLAGE CHARANKA, TALUKA SANTALPUR, GUJARAT ISSUED BY: ADDL. GENERAL MANAGER (SLPP) GUJARAT INDUSTRIES POWER COMPANY LIMITED (GIPCL)

ON 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 2 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

SECTION-1: NOTICE INVITING TENDER (NIT)

GUJARAT INDUSTRIES POWER COMPANY LIMITED P.O Petrochemicals, Dist.: Vadodara-391346, Gujarat, India. Tel.:+91-265-2230182 / +91-2629-261275 Fax: +91-265-2231207 /+91-2629-261080 Cell: +91-9909925313 E-mail: [emailprotected], [emailprotected]

SECTION-1

NOTICE INVITING TENDER (NIT) “Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat”. Gujarat Industries Power Company Limited (GIPCL) invites interested parties to participate in this Request for Proposal (this “RFP or the “Tender Documents” or the “Tender”) for bidding and selection process for the appointment of Contractor for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2x75MW (AC) Solar Photovoltaic Grid Connected Power Plant using PV technology at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, in the State of Gujarat (the “Project”). Gujarat Industries Power Company Limited (GIPCL) also inviting 75 MW (AC) bid on behalf of Gujarat State Electricity Corporation Limited (GSECL) for Gujarat Solar Park, Charanka and

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 3 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

shall carry out technical scrutiny/price bid opening /reverse auction till discovery of successful L1 bidder and intimation/ submission of documents to GSECL. If submitted documents are found/verified to be fake after awarding of LoI, GSECL reserves the right to cancel the same. Gujarat Industries Power Company Limited has decided to appoint an EPC Contractor for development of 2x75 MW (AC capacity) Solar Plant competitive bidding process. Considering the large volume and quantum of work involved, GIPCL/GSECL may award the work to more than one Bidder to facilitate timely supply and completion of the Project. Further, GIPCL/GSECL reserves the right to award the work to single bidder or multiple bidders, without assigning any reason. Tender Documents may be downloaded from Web site https://www.nprocure.com or https://gipcl.nprocure.com (For view, down load and on-line submission) and GIPCL website htpp://www.gipcl.com (For view & download only.) Tender fee & EMD shall be paid along with submission of Tender Documents. All the relevant documents of Tender shall be submitted physically by Registered Post A.D. or Speed Post or by Hand Delivery addressed to: Shri N.K.Singh, Addl. General Manager (SLPP),Gujarat Industries Power Company Limited, PO:Petrochemicals-391346, Dist.: Vadodara, Gujarat, superscribing the envelope with Tender No. and Description. “NO COURIER SERVICE” shall be considered for submission of Tender.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 4 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

TABLE A: IMPORTANT DATES

Sr. i.

Event

Date (and Time)

Date of upload of orignal tender

: 18th December, 2017

(Document No. GIPCL/Solar/EPC/2017/2x75 MW (AC) Solar PV/Rev.1.0)

ii.

Last date and time for receipt of

: Not Applicable

questions/ queries/ clarifications iii.

Date and Time of Pre-bid Meeting

: 2nd January, 2018 at 11:30 Hrs at GIPCL, PO:Petrochemicals-391346,

/Briefing Meeting iv.

Dist: Vadodara

Online (e-tendering) Tender/Offer

: Date: 15.01.2018 Time: 17:00 hours (IST)

submission last date

On N-Procure portal for Bid

{This is mandatory} v.

Submission

Physical receipt of Bid with all the

: Date: 16.01.2018 Time: 15:00 hours (IST)

relevant documents last date (By RPAD

Venue: GIPCL Corporate Office,

or Speed Post or By Personal

PO: Petrochemicals - 391 346,

Messenger)

Dist. Vadodara.

{This is mandatory} vi.

: Offers shall be valid for a period of

Bid Validity

One Hundred and Twenty (120) days from bid submission due date.

vii.

Date of opening of Tender Fee, EMD

: 17th January, 2018 (Internal opening by GIPCL)

Cover, Vendor Registration and Technical Bid Physical as well as Online opening viii.

a) Opening of Financial Bid

:

a) Will be decided by GIPCL and

b) e-Reverse Auction starts from

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

will be intimated to Qualified Bidders.

Page 5 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

b) Will be informed by GIPCL to all qualified Bidders. ix.

Target date for Commissioning of Project

x.

Tentative Date for completion of Operational Acceptance Test

xi.

Performance Guarantee (PG) Test Period

: 365 days from date of Letter of Intent (LoI) : 395 days from date of Letter of Intent (LoI) : Performance Guarantee (PG) Test Period shall start as under: A) If the Contractor successfully completes

Operational

Acceptance

Test (OAT) in first attempt within 30 days from date of commissioning then PG Test Period and O&M Period will start from the date when the OAT was started. (OR) B) In case the Contractor fails the OAT in the first attempt, the Contractor shall be allowed maximum 30 days for corrective actions and further next OAT shall start on completion of 30 days period or earlier as desired by the Contractor. The PG Test and the O&M period shall start from the date when of second OAT period is started. In case the Contractor fails in the second attempt as well, a penalty will be imposed at 1% of EPC Contract Price. In this case, irrespective of the result (whether pass or fail) of the OAT, the PG Test and O&M Period shall start at the beginning of the second OAT. The start of O&M and first year operation

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 6 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

shall be considered after successful completion of operational acceptance test

or

60 days

from date

of

commissioning of 75 MW (AC) whichever is earlier. Further all the guarantees

related

to

NEEGG

/

Incentive shall also be applicable. (OR) C) However, in case of failure of the second OAT, if the Contractor needs more time to further take corrective action at its own discretion, then the same

may

be

allowed

by

GIPCL/GSECL without imposing any further penalty on the Contractor towards

such

However,

if

subsequent the

OATs.

Contractor

is

successful in third attempt then the penalty deducted at the time of unsuccessful 2nd attempt of OAT shall be returned but if the Contractor fails in third attempt of OAT then penalty charged

at

the

time

of second

unsuccessful attempt of OAT shall not be returned to the Contractor. xii.

Operation and Maintenance (O&M) Period

: Upon start of PG Test Period as per Clause No. xi above for a period of ten (10) years.

xiii.

EMD Validity

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

: One Hundred and Twenty (120) days from bid submission due date

(Sign and Seal of Bidder)

Page 7 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xiv.

Bank Guarantee Against PV Module Waranty (if applicable) as per Clause

xv.

xvi.

90 days beyond the 25 Years from the date of Commissioning of the entire

no. 6.39.10.

Project.

Bank Guarantee for shortfall at the time

9 Years from the completion of PG

of PG test (if applicable)

Test.

Queries regarding Pre- Bid meeting

Any queries regarding pre-bid meeting may be forwarded to Contact Person of GIPCL at least three days prior to the Pre-Bid meeting.

Note: The abovementioned dates are subject to amendment, in which case the amendments shall be publically intimated.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 8 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

TABLE B: IMPORTANT AMOUNTS

Sr. i.

Head

Amount (and Validity)

Tender Fees (non-refundable)

:

the form of Bank Guarantee

Only Rs. 3,00,00,000/- (Rupees Three Crore Only)

Earnest Money Deposit (EMD) in ii.

Rs. 25,000/- (Rupees Twenty Five Thousand

:

(Refundable/adjustable)

with a validity as per Clause No. xiii of Table A (Important Dates) above.

The Contractor shall furnish Security Deposit (SD) cum Performance Bank Guarantee (PBG) equivalent to 10% (ten percent) of the EPC Cost within two weeks after issuance of LOI. The

Security Deposit cum iii.

Performance Bank Guarantee

:

(PBG)

validity period of PBG should be for a total period up to 27 months from the date of LoI or till the date of successful completion of PG test whichever is later; if required, the PBG shall have to be extended for further 3 months beyond the due date of successful completion of PG test. 5% of EPC Contract Price, to be submitted upon completion and acceptance of Performance Guarantee Test as per Clause No. xi of Table A (Important Dates) above for a period of five (5) years, and 2.5% of the EPC Contract Price from

iv.

O&M Bank Guarantee (O&M BG)

:

the start of the sixth (6th) year of O&M Period to the 90 days beyond completion of the O&M Period mentioned in Clause No. xii of Table A (Important Dates) above. This O&M BG shall cover the risk against extended warrantee for equipment up to O&M Period and recovery towards shortfall in NEEGG during O&M

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 9 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Period. The O&M Bank Guarantee shall be valid 90 days beyond the O&M Period. Insurance or Performance Bank v.

Guarantee (PBG) Against PV Module Waranty Bank Guarantee for shortfall at

vi.

Rs. 25 Lacs per MW of PV Module (DC Capacity) valid for 25 years required to be submitted prior to submission of SD/PBG. Rs. 26.88 per kWh

the time of PG test (To whomsoever it is applicable)

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 10 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

IMPORTANT NOTE TO BIDDERS:

Timely submission of offer to GIPCL: In addition to bid submitted online, all the relevant documents as per requirement of the Tender shall also be submitted physically along with the proof of Tender Fee and EMD in sealed cover so that the same is received in this office on or before the due date and time. All such documents should be strictly submitted by RPAD / speed post/ in person in sealed cover only. Otherwise the offer will not be considered and no any further communication in the matter will be entertained. Please note that Price Bid is not to be submitted in physical form. No Tender shall be accepted in any case after due date and time of receipt of the Tender, irrespective of delay due to postal services or any other reasons and GIPCL does not assume any responsibility for late receipt of the Tender. 1.

All interested parties are requested to understand this Tender in detail in order to comply with GIPCL’s requirements including but not limited to the fees and deadlines, selection criteria, selection methodology, scope of work, and minimum technical standards. They shall strictly abide by ALL terms prescribed in this Tender and provide accurate information to the best of their knowledge without misleading the Owner to be considered for participation in this Project.

2.

It is mandatory for all the Bidders to submit their Financial Bid ONLINE only via e-tendering portal.

3.

Technical Bid (Techno-commercial Bid) to be submitted both in physical as well as soft copy (online). It is mandatory for all the bidders to submit their Technical Bid (Technocommercial Bid) documents in both forms i.e. online (e-tendering) as well as in hard copy in scheduled time. Technical bid in any one form i.e. either in soft copy (online) or in hard copy (physical form), shall not be considered. Technical Bid (Techno-commercial Bid) in THREE (3) copies (1 Original+ 2 Copies) shall be sent in Sealed Envelopes containing copies of Technical bid (Techno-commercial bid).

4.

Technical Bid (Techno-commercial Bid)

envelope shall be superscribed as:

“GIPCL/Solar/EPC/2017/2x75 MW (150 MW) (AC) Solar PV/Rev.1.0; Technical Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2x75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat”. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 11 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.

All the envelopes shall be addressed to: Shri N.K.Singh, Addl. General Manager (SLPP),

Gujarat Industries Power Company Limited, PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat. Complete postal address of the Bidder shall appear on all the envelopes so that it is possible to find out whose Bid it is without opening the envelope. 6.

Tender Fee and EMD shall be submitted in two separate envelopes.

7.

Tender fee (non-refundable) will be accepted by DD drawn in favour of the Gujarat Industries Power Company Limited payable at Vadodara. Tenders submitted without Tender Fee shall not be accepted. The envelope for Tender Fee should be superscribed as “Tender Fee”. Cheques are not acceptable.

8.

Bidder(s) have to pay total EMD of as per Clause No. ii of Table B (Important Amounts) above. EMD shall be in the form of Bank Guarantee in favour of “Gujarat Industries Power Company Limited” payable at Vadodara. The envelope for EMD should be superscribed as “EMD”. Cheques are not acceptable.

9.

It is mandatory for all Bidders to submit their Price Bid (Appendix 15) only through online (e-tendering) mode. Price Bids submitted in physical form shall not be considered for its opening and only on-line submitted price bid will be considered for evaluation. Bidders to note that Price Bid (Appendix 15) of only those Bidders shall be opened (On-linetendering) who are found technically qualified and are found reasonably responsive to GIPCL’s Tender terms and conditions and Scope of Work.

10.

Any technical/commercial query pertaining to this Tender should be referred to: Shri N.K.Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO:Petrochemicals-391346, Dist: Vadodara, Gujarat, India Tel.:+91-265-2230182 / +91-2629-261075 Fax:+91-265-2231207 /+91-2629-261080 Email: [emailprotected], [emailprotected]

11.

Bidders who wish to participate in this tender will have to procure or should have legally valid Digital Certificate (Class III) as per Information Technology Act-2000, using which they can sign their electronic bids. Bidders can procure the same from any of the license certifying Authority of India or can contact (n)code solutions-a division of GNFC Limited, who are licensed Certifying Authority by Government of India at address mentioned below. Bidder may go through the e-tendering instruction for online Bid participation through n-procure platform for further details and guidance for participation in the tendering process through etendering.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 12 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

In case of any further information regarding online bidding or if a Bidder needs any assistance in accessing/ submission of online bid/ clarification or if training is required for participating in online e-reverse bidding, then the Bidder can contact the following office for assistance or training: (n) Procure Cell, (n) code solutions-A division of GNFC Ltd., 403, GNFC Info tower, S.G. Road, Bodakdev Ahmedabad – 380054 (Gujarat) Toll Free: 1-800-419-4632 / 1-800-233-1010, Phone No. 079-26857315 / 316 / 317, Fax: 079-26857321 / 40007533, Email: [emailprotected] Bidder may visit https://www.nprocure.com/html/faq.asp for information regarding etendering registration process. To participate in e-Reverse Auction, bidders have to create e-Auction USER ID on www.auction.nprocure.com and it is mandatory to submit the same alongwith physical Technical bid (In EMD cover); so that the bidder shall be allowed to participate the e-Reverse Auction. 12.

Tender Documents (PDF Format) can be downloaded from Web site https://www.nprocure.com, https://gipcl.nprocure.com or htpp://www.gipcl.com.

13.

GIPCLreserve the rights to accept/reject any or all Tenders without assigning any reasons thereof. Bidders are requested to be in touch with above-mentioned websites till opening of the Price Bid to know the latest status.

Yours faithfully,

For and behalf of Gujarat Industries Power Company Limited. (N.K.Singh) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India --- End of Section ---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 13 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Document Checklist

[Note: Document Checklist shall be attached with Appendix 1 of the Technical Bid]

Sr.

Document

Attached? (Yes/ No)

1.

Complete sets of Bids (original and copies)

2.

Signed Tender Documents in Cover-I

3.

Demand Draft of Tender Fees

4.

Document as per Clause No. 3.2

5. 6.

Enclosures of the Bid including the Covering Letter as per the format prescribed in Appendix 1: Format for Covering Letter Cover-II. Details of Bidder as specified in Appendix 2

7.

Details of Similar Technical Experience as per Appendix 3

8.

Format of Disclosure of PV Technology Proposed as per Appendix 4

9.

Project Plan as mentioned in Appendix 5: Format for Project Execution Plan.

For Official Use

10. Submission of Technical Document as per Appendix 7 11. Details of qualified technical staff as per the format in Appendix 8 12. EMD in the form of Demand Draft or/and Bank Guarantee as per format prescribed in Appendix18 (a): Format of Bank Guarantee for EMD. 13. Attested copy of Service Tax Registration Certificate of Bidder. 14. Attested copy of Provident Fund Code of Bidder. 15. Attested copy of PAN Card for Bidder. 16. Certificate of Commencement of Business issued by the Registrar of Companies for Bidder.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 14 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

17. Power of Attorney by the Bidder in favour of Bidder as per format prescribed in Appendix 12

18. Bill of Quantities with Specifications / Make etc. as per Tender /RFP 19. Copy of this RFP with sign and official seal on every page 20. A comprehensive project management schedule in the form of Gantt Chart for execution plan 21. Format for Undertaking as per Appendix 21

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 15 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Disclaimer A. The information contained in this Request for Proposal (“RFP”) or subsequently provided to Bidder(s), in documentary or in any other form, by or on behalf of GIPCL, any of their employees or advisors, is provided to Bidder(s) on the terms and conditions set out in this RFP and such other terms and conditions subject to which such information is provided. B. This RFP is not an agreement and is neither an offer nor invitation by GIPCL to the prospective Bidders or any other person. The purpose of this RFP is to provide interested parties with information that may be useful to them in the formulation of their Bid for qualification pursuant to this RFP. This RFP includes statements, which reflect various assumptions and assessments arrived at by GIPCL or their advisors or employees or agents, in relation to the Project. Such assumptions, assessments and statements do not purport to contain all the information that each Bidder may require. This RFP may not be appropriate for all persons, and it is not possible for GIPCL, their employees or advisors to consider the investment objectives, financial situation and particular needs of each party who reads or uses this RFP. C. The assumptions, assessments, statements and information contained in this RFP may not be complete, accurate, adequate or correct. Each Bidder should therefore, conduct its own investigations and analysis and should check the accuracy, adequacy, correctness, reliability and completeness of the assumptions, assessments, statements and information contained in this RFP and obtain independent advice from appropriate sources. D. Information provided in this RFP to the Bidder(s) is on a wide range of matters, some of which depends upon interpretation of law. The information given is not an exhaustive account of statutory requirements and should not be regarded as a complete or authoritative statement of law. GIPCL would not have any responsibility for the accuracy or otherwise for any interpretation or opinion on law expressed herein. E. GIPCL, their employees and advisors make no representation or warranty and shall have no liability to any person, including any Bidder or Bidder(s), under any law, statute, rules or regulations or tort, principles of restitution or unjust enrichment or otherwise for any loss, damages, cost or expense which may arise from or be incurred or suffered on account of anything contained in this Bid or otherwise, including the accuracy, adequacy, correctness, completeness or reliability of the RFP and any assessment, assumption, statement or information contained therein or deemed to form part of this RFP or arising in any way with prequalification of Bidders for participation in the Bidding process.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 16 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

F. GIPCL also accept no liability of any nature whether resulting from negligence or otherwise howsoever caused arising from reliance of any Bidder upon the statements contained in this RFP. GIPCL may, in their respective absolute discretion but without being under any obligation to do so, update, amend or supplement the information, assessment or assumptions contained in this RFP. G. The issuance of this RFP does not imply that GIPCL is bound to select and short-list prequalified Bids for Bid Stage (the “Bid Stage”) or to appoint the selected Bidder, as the case may be, for the Project[s] and GIPCL reserves the right to reject all or any of the Bid or Bids without assigning any reasons whatsoever. H. The Bidder shall bear all its costs associated with or relating to the preparation and submission of its Bid including but not limited to preparation, copying, postage, delivery fees, expenses associated with any demonstrations or presentations which may be required by the GIPCL or any other costs incurred in connection with or relating to its Bid proposal. All such costs and expenses will remain with the Bidder and the GIPCL shall not be liable in any manner whatsoever for the same or for any other costs or other expenses incurred by a Bidder in preparation or submission of the Bid proposal regardless of the conduct or outcome of the Bidding process.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 17 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Table of Contents

SECTION-1: NOTICE INVITING TENDER (NIT) ......................................................................... 3 DOCUMENT CHECKLIST ...................................................................................................... 14 DISCLAIMER ........................................................................................................................ 16 1 1.1 1.2

2 2.1 2.2

3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14

4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17

DEFINITION& INTERPRETATION ............................................................................... 22 DEFINITIONS ..................................................................................................................................... 22 INTERPRETATIONS ............................................................................................................................... 27

INTRODUCTION........................................................................................................ 29 ABOUT THE COMPANY ......................................................................................................................... 29 ABOUT THE PROJECT ........................................................................................................................... 31

INSTRUCTION TO BIDDERS....................................................................................... 32 GENERAL INSTRUCTIONS ...................................................................................................................... 32 PRE-QUALIFYING REQUIREMENTS (PQRS)/ ELIGIBILITY CONDITIONS ............................................................... 34 LOCAL CONDITIONS............................................................................................................................. 37 LOCAL REGULATORY FRAME WORK......................................................................................................... 39 CLARIFICATIONS TO TENDER DOCUMENT .................................................................................................. 39 AMENDMENTS TO TENDER DOCUMENT ................................................................................................... 40 ACCEPTANCE OF BIDS .......................................................................................................................... 40 WITHDRAWAL OF INVITATION TO BID ...................................................................................................... 40 REPRESENTATIVE/ AGENT OF BIDDER ...................................................................................................... 40 FINANCIAL PROPOSAL AND CURRENCIES ................................................................................................... 40 BANK GUARANTEES & EMD ................................................................................................................. 40 PROJECT MANAGEMENT CONSULTANT AND THIRD PARTY INSPECTION AGENCY ................................................. 44 RIGHT TO ACCEPT OR REJECT ANY OR ALL BIDS ........................................................................................... 44 NET ELECTRICAL ENERGY GENERATION GUARANTEE (NEEGG) ...................................................................... 45

SUBMISSION OF BID ................................................................................................ 47 GENERAL TERMS ................................................................................................................................ 47 FORMAT AND SIGNING OF BID ............................................................................................................... 48 SEALING AND MARKING OF BID ............................................................................................................. 48 ENCLOSURES OF THE BID ...................................................................................................................... 49 BID DUE DATE ................................................................................................................................... 53 LATE BIDS......................................................................................................................................... 53 CONFIDENTIALITY ............................................................................................................................... 53 CORRESPONDENCE WITH THE BIDDER ...................................................................................................... 53 BID OPENING AND EVALUATION ............................................................................................................. 54 TESTS OF RESPONSIVENESS ................................................................................................................... 54 MODIFICATION AND WITHDRAWAL OF BIDS .............................................................................................. 55 EVALUATION OF BID AND SELECTION OF BIDDER ......................................................................................... 55 CONTACTS DURING BID EVALUATION ....................................................................................................... 57 EMPLOYMENT OF OFFICIALS/ EX-OFFICIAL OF THE OWNER ........................................................................... 57 DECLARATION ON BIDDER'S RELATION TO DIRECTORS .................................................................................. 57 LETTER OF INTENT (“LOI”) AND NOTIFICATION TO PROCEED ......................................................................... 57 PERFORMANCE GUARANTEE.................................................................................................................. 58

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 18 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017. 4.18 FRAUDULENT PRACTICES ...................................................................................................................... 59

5 5.1 5.2 5.3

6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 6.24 6.25 6.26 6.27 6.28 6.29 6.30 6.31 6.32 6.33 6.34 6.35 6.36 6.37 6.38 6.39 6.40 6.41 6.42

SCOPE OF WORK ...................................................................................................... 60 GENERAL SCOPE OF WORK ............................................................................................................. 60 CIVIL WORK ................................................................................................................................... 73 DETAILED ELECTRICAL WORK (FOR 2X75 MW (AC) PROJECT) ............................................................... 96

GENERAL TERMS AND CONDITIONS ...................................................................... 169 USE OF CONTRACT DOCUMENTS & INFORMATION .................................................................................... 169 PATENT RIGHTS ............................................................................................................................... 169 MATERIALS AND WORKMANSHIP ......................................................................................................... 169 INTER-CHANGEABILITY ....................................................................................................................... 170 PACKING AND MARKING .................................................................................................................... 170 NEGLIGENCE ................................................................................................................................... 170 STATUTORY RESPONSIBILITY ................................................................................................................ 171 INSOLVENCY AND BREACH OF CONTRACT ................................................................................................ 171 TIMELINE (BEST EFFORT SCHEDULE) ...................................................................................................... 172 DELAY IN EXECUTION OR FAILURE TO SUPPLY........................................................................................... 174 LIQUIDATED DAMAGES FOR DELAY AND UNDERPERFORMANCE .................................................................... 175 PENALTY / INCENTIVE FOR GENERATION DURING OPERATION & MAINTENANCE (O&M) ................................... 177 DEFECT LIABILITY .............................................................................................................................. 179 TERMINATION FOR DEFAULT ............................................................................................................... 181 BREACH AND CANCELLATION OF THE CONTRACT ....................................................................................... 182 FORCE MAJEURE .............................................................................................................................. 182 PROGRESS REPORT OF WORK .............................................................................................................. 183 INSURANCE ..................................................................................................................................... 183 STATUTORY ACTS, RULES AND STANDARDS ............................................................................................. 184 TOOLS AND TACKLES ......................................................................................................................... 184 SAFETY MEASURES ........................................................................................................................... 185 HAZARDOUS MATERIAL ..................................................................................................................... 185 STOPPAGE OF WORK ......................................................................................................................... 185 HINDRANCE REGISTER ....................................................................................................................... 185 RESPONSIBILITY OF THE CONTRACTOR .................................................................................................... 185 RIGHT OF THE OWNER TO MAKE CHANGE(S) IN DESIGN ............................................................................. 185 MANUALS ...................................................................................................................................... 186 GOVERNING LANGUAGE ..................................................................................................................... 186 ORDER AMENDMENTS ....................................................................................................................... 186 ASSIGNMENTS OR SUBLETTING OF CONTRACT .......................................................................................... 186 SUBCONTRACTS ............................................................................................................................... 186 INSPECTION AND TESTING ................................................................................................................... 186 AUTHORIZED TEST CENTRES ................................................................................................................ 189 DELIVERY OF EQUIPMENT ................................................................................................................... 189 LIABILITIES DURING TRANSIT ................................................................................................................ 190 DEDUCTION FROM CONTRACT PRICE ..................................................................................................... 190 TERMS OF PAYMENT (FOR EACH 75 MW PROJECT) ................................................................................. 190 PAYMENTS PROCEDURE ..................................................................................................................... 193 WARRANTY/ GUARANTEE................................................................................................................... 195 ARBITRATION .................................................................................................................................. 197 COURT OF COMPETENT JURISDICTION .................................................................................................... 198 LAW AND PROCEDURE ....................................................................................................................... 198

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 19 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017. 6.43 CONSTRUCTION OF CONTRACT ............................................................................................................. 198 6.44 NOTICES ........................................................................................................................................ 198 6.45 FINAL BILL ...................................................................................................................................... 199 6.46 DEGRADATION OF SOLAR MODULES ...................................................................................................... 199 6.47 RISK PURCHASE ............................................................................................................................... 199 6.48 CONFIDENTIAL INFORMATION .............................................................................................................. 200 6.49 LIMITATION OF LIABILITY (LLP) ............................................................................................................ 201

7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 7.20 7.21 7.22 7.23 7.24

SPECIAL TERMS AND CONDITION .......................................................................... 202 DEFINITION ..................................................................................................................................... 202 OBJECTIVE OF THE PROJECT................................................................................................................. 202 COMPLIANCE WITH GUVNL/GETCO/GEDA GUIDELINES ......................................................................... 202 PROJECT SITE .................................................................................................................................. 202 SCOPE OF SERVICE ............................................................................................................................ 202 TRAINING OF GIPCL’S /GSECL’S PERSONNEL ......................................................................................... 203 MODE OF EXECUTION ........................................................................................................................ 203 PROGRAMME OF WORK ..................................................................................................................... 203 STARTING OF WORK.......................................................................................................................... 203 COMPLETION SCHEDULE..................................................................................................................... 204 SITE INSPECTION & BASIS OF BID.......................................................................................................... 204 PRICE ESCALATION ............................................................................................................................ 204 TAXES AND DUTIES ........................................................................................................................... 204 PROCUREMENT OF MATERIALS ............................................................................................................ 205 SAMPLES ........................................................................................................................................ 206 NOTICE OF OPERATION ...................................................................................................................... 206 REJECTION OF MATERIALS .................................................................................................................. 206 POWER AND WATER SUPPLY DURING CONSTRUCTION ............................................................................... 206 LABOUR ENGAGEMENT ...................................................................................................................... 207 HANDING OVER –TAKING OVER ........................................................................................................... 207 TERMINATION ON THE DEATH OF CONTRACTOR ........................................................................................ 208 RETIRED GOVERNMENT SERVANTS TAKING TO CONTRACT ........................................................................... 208 EPF .............................................................................................................................................. 208 MISCELLANEOUS .............................................................................................................................. 209

APPENDIX 1: FORMAT FOR COVERING LETTER ................................................................. 211 APPENDIX 2: DETAILS OF BIDDER ..................................................................................... 215 APPENDIX 3: FORMAT OF DETAILS OF SIMILAR TECHNICAL EXPERIENCE ......................... 217 APPENDIX 4: FORMAT OF DISCLOSURE OF PV TECHNOLOGY PROPOSED ........................ 219 APPENDIX5: FORMAT FOR PROJECT EXECUTION PLAN .................................................... 221 APPENDIX 6: BID EVALUATION CRITERIA (BEC) FOR 2 X 75 MW (AC) ............................... 222 APPENDIX 7: SUBMISSION OF TECHNICAL DOCUMENT .................................................... 226 APPENDIX 8: DETAILS OF QUALIFIED TECHNICAL STAFF ................................................... 231 APPENDIX 9: DECLARATION OF COMPLIANCE .................................................................. 232 APPENDIX 10: NO DEVIATION CERTIFICATE...................................................................... 234

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 20 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

APPENDIX 11: DECLARATION ON BIDDER'S RELATION TO DIRECTORS ............................. 235 APPENDIX 12: FORMAT OF POWER OF ATTORNEY AS AUTHORIZED SIGNATORY ............ 236 APPENDIX 13: FORMAT OF SUMMARY OF AUDITED FINANCIAL STATEMENTS ................ 238 APPENDIX 14: FORMAT OF AUTHORIZATION BY PARENT COMPANY .............................. 240 APPENDIX 15: FORMAT OF FINANCIAL PROPOSAL ........................................................... 242 APPENDIX 16: PROCEDURE FOR PERFORMANCE TESTING ............................................... 249 APPENDIX 17: LIST OF BANKS (FOR BANK GUARANTEE) .................................................. 254 APPENDIX18 (A): FORMAT OF BANK GUARANTEE FOR EMD............................................ 256 APPENDIX 18 (B): FORMAT OF BANK GUARANTEE FOR SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE ........................................................................................................... 258 APPENDIX18 (C): FORMAT OF BANK GUARANTEE FOR PERFORMANCE FOR O&M .......... 260 APPENDIX 19: CONTRACT AGREEMENT (TO BE ENTERED SEPARATELY WITH GIPCL /GSECL FOR THEIR RESPECTIVE PROJECTS) ................................................................................... 263 APPENDIX 20: FORMAT FOR PRE-BID QUERIES ................................................................ 266 APPENDIX 21: FORMAT FOR UNDERTAKING .................................................................... 267 ANNEXURE-A1: DETAILS OF SITE ...................................................................................... 268 ANNEXURE-A2: ADVANCE PAYMENT GUARANTEE........................................................... 273 ANNEXURE-A3: PLOT DETAILS AT CHARANKA SOLAR PARK, GUJARAT ............................ 277 ANNEXURE-A4: PRECAST BOUNDARY WALL (FENCING) .................................................. 278 ANNEXURE-A5: SOIL INVESTIGATION REPORT ................................................................. 279 ANNEXURE-A6: WATER TEST REPORT .............................................................................. 287 ANNEXURE A7: OPERATION AND MAINTENANCE ............................................................ 293 ANNEXURE A8: GUVNL TENDER & PPA............................................................................. 297

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 21 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

1 Definition& Interpretation 1.1

Definitions

The following words and expressions shall have the meanings hereby assigned to them: 1.1.1 “Actual Energy Delivered” means the net energy in kilo-watt hour (kWh) from 2 x 75MW (AC) solar PV plant as measured at the Metering Point. 1.1.2 “Adjudicator” means the person, who shall be an engineer or a firm of engineers who is appointed by the Company to act as the adjudicator to make a decision on or to settle any dispute or difference between the Company and the Contractor referred to it or her by the parties pursuant to RFP (Adjudicator) hereof. 1.1.3 “Applicable Law” means any statute, law, regulation, ordinance, notification, rule, regulation, judgment, order, decree, bye-law, approval, directive, guideline, policy, requirement or other governmental restriction or any similar form of decision of, or determination by, or any interpretation or administration having the force of law in the Republic of India and the State Government, by any Government Authority or instrumentality thereof, whether in effect as of the date of this Contract or thereafter. 1.1.4 “Base NEEGG” for a year is calculated by using the Net Electrical Energy Generation Guarantee (NEEGG) quoted in the Bid offer by the Contractor adjusted with a correction factor to take into account the actual average global solar radiation measured by the calibrated pyranometer for that year. 1.1.5 “Bid” shall mean the bid submitted by the Bidder in response to the RFP/Tender Document No. “GIPCL/Solar/EPC/2017/2x75 MW (150 MW) (AC) Solar PV/Rev.1.0” issued by the Company. 1.1.6 “Bidder” shall mean Bidding Company or a Bidding Individual submitting the Bid. Any reference to the Bidder includes Bidding Company / Bidding Individual including its successors, executors and permitted assigns severally, as the context may require; 1.1.7 “Commissioning” means the satisfactory, continuous and uninterrupted operation of the equipment/system as specified after all necessary statutory approvals, initial tests, checks and adjustments for a period of at least 3 days to the satisfaction of the Company

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 22 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

and necessary certificates are issued by the all concerned/ nodal agencies appointed by appropriate authority/Government.

1.1.8 “Completion” means that the Facilities (or a specific part thereof where specific parts are specified in the Scope of Work) have been completed operationally and structurally and put in a tight and clean condition and that all work in respect of Commissioning of the Facilities or such specific part thereof has been completed as per the Scope of Work. 1.1.9 “Company” means Gujarat Industries Power Company Limited (GIPCL) and Gujarat State Electricity Corporation Limited (GSECL) (Individually Company and jointly Companies) and includes the legal successors or permitted assigns of the Company. 1.1.10 “Contract” or “Contract Agreement” means the Contract signed between the Company (GIPCL and GSECL) and the Contractor to execute the entire Scope of Work as given in Appendix 19: Contract Agreement. 1.1.11 “Contract Documents” means the documents listed in Appendix 19: Contract Agreement. 1.1.12 “Contractor” means the person(s) whose bid to perform the Contract has been accepted by the Company and is named as such the Contract Agreement, and includes the legal successors or permitted assigns of the Contractor. 1.1.13 “Contractor’s Equipment” means all plant, facilities, equipment, machinery, tools, apparatus, appliances or things of every kind required in or for installation, completion and maintenance of Facilities that are to be provided by the Contractor, but does not include Plant and Equipment, or other things intended to form or forming part of the Facilities. 1.1.14 “Capacity Utilization Factor (CUF)” shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time. 1.1.15 “Chartered Accountant” shall mean a person practicing in India or a firm whereof all the partners practicing in India as a Chartered Accountant(s) within the meaning of the Chartered Accountants Act, 1949.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 23 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

1.1.16 “Completion Certificate” shall mean the certificate to be issued by the owner or his representative when the works have been completed to his satisfaction. 1.1.17 “Commercial Operation Date” (COD): with respect to the Project/Unit shall mean the date on which the project / unit is commissioned (certified by GEDA) and available for commercial operation and such date as specified in a written notice given at least 10 days in advance by the EPC Contractor to Owner /GUVNL. 1.1.18 “Day” means calendar day of the Gregorian calendar. 1.1.19 “Delivery Point” shall be the interconnection point at which solar power developer (SPD), GIPCL and GSECL, shall deliver the power to the Gujarat State Transmission Unit substation. The metering shall be done at this point of interconnection. 1.1.20 “Defect Liability Period” means the period of validity of the warranties given by the Contractor, during which the Contractor is responsible for defects with respect to the Facilities (or the relevant part thereof) as provided in Clause No. 6.13 (Defect Liability) hereof. 1.1.21 “Effective Date” for this Contract shall mean the date of issuance of Letter of Intent by the Company. 1.1.22 “Facilities” means the Plant and Equipment to be supplied and installed, as well as all the Installation Services to be carried out by the Contractor under the Contract for enabling the installation, construction, testing and commissioning of the Solar Power System(s). 1.1.23 “GEDA” means the Gujarat Energy Development Agency 1.1.24 “GCC” means the General Conditions of Contract hereof. 1.1.25 “Government Authority” means Government of India, any state government or any governmental department, commission, board, body, bureau, agency, authority, undertaking, court or other judicial or administrative body or any sub-division or instrumentality thereof, central, state, or local, having jurisdiction over the Contractor, the Facility, or the performance of all or any of the services, obligations or covenants of Contractor under or pursuant to this Contract or any portion thereof.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 24 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

1.1.26 “Guarantee Test(s)” means the Performance & Guarantee test(s) specified in the (Guarantee Test) to be carried out to ascertain whether the Facilities or a specified part thereof is able to attain the Functional Guarantees. 1.1.27 “GUVNL” means Gujarat Urja Vikas Nigam Limited 1.1.28 “GIPCL” means Gujarat Industries Power Company Limited 1.1.29 “GSECL” means Gujarat State Electricity Corporation Limited 1.1.30 “Installation Services” means all those services ancillary to the supply of the Plant and Equipment for the Facilities, to be provided by the Contractor under the Contract; e.g., transportation and provision of marine or other similar insurance, inspection, expediting, Site preparation works (including the provision and use of Contractor’s Equipment and the supply of all civil, structural and construction materials required), installation, Commissioning, carrying out guarantee tests, operations, maintenance, the provision of operations and maintenance manuals, training of Company's personnel etc. 1.1.31 “Month” means calendar month of the Gregorian calendar. 1.1.32 “MNRE” means Ministry of New and Renewable Energy, Government of India.

1.1.33 “O&M” means Operations and Maintenance. 1.1.34 “Owner” means Gujarat Industries Power Company Limited (GIPCL) and Gujarat State Electricity Corporation Limited (GSECL) (Individually as Owner) for their respective 1 x 75 MW (AC) project. 1.1.35 “Plant Capacity” is defined as 2x75MW (AC) Grid-Connected Solar Photovoltaic Power Plant proposed at Gujarat Solar Park, Charanka, Gujarat as per the provisions in this Tender including but not limited to its design, engineering, procurement & supply, construction, commissioning (COD with GEDA/ GUVNL), compressive operation and maintenance. 1.1.36 “Project Manager” means the person appointed by the Company in the manner provided in the RFP (Project Manager) hereof and named to perform the duties delegated by the Company.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 25 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

1.1.37 “Prudent Utility Practices” means those practices, methods, techniques and standards, that are generally accepted for use in electric utility industries taking into account conditions in India, and commonly used in prudent electric utility engineering and operations to design, engineer, construct, test, operate and maintain equipment lawfully, safely, efficiently and economically as applicable to power stations of the size, service and type of the Project, and that generally conform to the manufacturer’s operation and maintenance guidelines. 1.1.38 “RFP document” shall mean the bidding document issued by the Company including all attachments vide RFP No. GIPCL/Solar/EPC/2017/2x75 MW (AC) Solar PV/Rev.1.0 1.1.39 “Site” means the land and other places upon which the Facilities are to be installed, and such other land or places as may be specified in the Contract as forming part of the Site. 1.1.40 “Solar Power System(s)” means the solar photovoltaic grid interactive power system(s) to be established at the site specified in the RFP. 1.1.41 “Subcontractor”, including vendors, means any person to whom execution of any part of the Facilities, including preparation of any design or supply of any Plant and Equipment, is sub-contracted directly or indirectly by the Contractor, and includes its legal successors or permitted assigns. 1.1.42 “Successful Bidder” means the bidder who has been awarded the Contract and described as Contractor for the “Project”. 1.1.43 “Time for Completion” shall be the date on or before which Commissioning of the Facility has to be achieved to the satisfaction of the Company and such date is specified in NIT. 1.1.44 “Inter Connection Point/ Delivery/Metering Point” means Metering Point for each plot shall be at 66/220/400 kV GETCO substation at Charanka Gujarat Solar Park including the dedicated transmission cables connecting the solar power project with GETCO substation. Metering shall be done at this interconnection point at the substation where the power is injected into the substation i.e.the delivery point. For interconnection with grid and metering, the EPC Contractor shall abide by the relevant CERC regulation, GERC regulations, Grid code and Central Electricity Authority (Installation and Operation Meters) Regulation, 2006 as amended and revised from time to time

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 26 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

1.2

Interpretations

1.2.1 Language: Unless otherwise agreed by the parties in writing, the parties shall use the English language and the Contract and the other Bid documents, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be written in English, and the Contract shall be construed and interpreted in accordance with that language. If any of the Contract Documents, correspondence or communications are prepared in any language other than English, the English translation of such documents, correspondence or communications shall prevail in matters of interpretation. 1.2.2 Singular and Plural: The singular shall include the plural and the plural the singular, except where the context otherwise requires. 1.2.3 Headings: The headings and marginal notes in the General Conditions of Contract are included for ease of reference, and shall neither constitute a part of the Contract nor affect its interpretation. 1.2.4 Persons: Words importing persons or parties shall include firms, corporations and government entities. 1.2.5 Men: The word ‘Men’ in this RFP shall mean all genders i.e. male, female and others. 1.2.6 Entire Agreement: The Contract constitutes the entire agreement between the Company and Contractor with respect to the subject matter of Contract and supersedes all communications, negotiations and agreements (whether written or oral) of parties with respect thereto made prior to the date of Contract. The various documents forming the Contract are to be taken as mutually explanatory. Should there be any discrepancy, inconsistency, error or omission in the Contract documents, the matter may be referred to the Adjudicator and the Contractor shall carry out work in accordance with the decision of the Adjudicator. 1.2.7 Amendment: No amendment or other variation of the Contract shall be effective unless it is in writing, is dated, expressly refers to the Contract, and is signed by a duly authorized representative of each party hereto. 1.2.8 Independent Contractor: Subject to the provisions of the Contract, the Contractor shall be solely responsible for the manner in which the Contract is performed. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 27 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

i.

All employees, representatives or Subcontractors engaged by the Contractor in connection with the performance of the Contract shall be under the complete control of the Contractor and shall not be deemed to be employees of the Company and nothing contained in the Contract or in any subcontract awarded by the Contractor shall be construed to create any contractual relationship between any such employees, representatives or Subcontractors and the Company.

ii.

Not in any case the sub-contractor shall claim or shall put any binding to the Company and the sub-contractor must be handled by the Contractor and the Company shall not be responsible for any claims at any time by the Contractor in relation to the subcontractor.

1.2.9 Non-Waiver i.

Subject to Clause 1.2.9(ii) below, no relaxation, forbearance, delay or indulgence by either party in enforcing any of the terms and conditions of the Contract or the granting of time by either party to the other shall prejudice, affect or restrict the rights of that party under the Contract, nor shall any waiver by either party of any breach of Contract operate as waiver of any subsequent or continuing breach of Contract.

ii.

Any waiver of a party’s rights, powers or remedies under the Contract must be in writing, must be dated and signed by an authorized representative of the party granting such waiver, and must specify the right and the extent to which it is being waived.

1.2.10 Severability: If any provision or condition of the Contract is prohibited or rendered invalid or unenforceable, such prohibition, invalidity or unenforceability shall not affect the validity or enforceability of any other provisions and conditions of the Contract. 1.2.11 Country of Origin: “Origin” means the place where the materials, equipment and other supplies for the Facilities are mined, grown, produced or manufactured, as the case may be, and from which the services are provided. This shall be according to MNRE guidelines.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 28 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

2 Introduction 2.1

About the Company

2.1.1 About GIPCL GIPCL (the “Company”) was incorporated in 1985 as Public Limited Company and engaged in business of Electrical Power Generation. The total present capacity of Vadodara (310 MW Gas based + 1 MW Solar+112.4 MW Wind), Mangrol (500 MW Lignite based + 5 MW Solar + 1 MW Solar) and Gujarat Solar Park (80 MW Solar) plants is 1009.4 MW. The company is having its registered office at P.O. Petrochemical, Vadodara, Gujarat. The Company commissioned first power project; a 145 MW gas based Combined Cycle Power Plant in February, 1992 at Vadodara. The Company expanded its capacity and commissioned 165 MW Naphtha & Gas based Combined Cycle Power Plant at Vadodara in November, 1997 as Independent Power Producer (IPP) with Power Purchase Agreement (PPA) with GUVNL. GIPCL commissioned 250 MW (SLPP Phase-I : 2x125 MW) Lignite based Power Plant at NaniNaroli, District Surat in November, 1999 as Independent Power Producer (IPP) with Power Purchase Agreement (PPA) with GUVNL. The Company also has its own Captive Lignite Mines at Vastan, Mangrol&Valia for Surat Lignite Power Plant. Further, SLPP Phase-II: 2 x 125 MW has been commissioned in April 2010. GIPCL commissioned 112.4 MW Wind Power Project in the State of Gujarat. GIPCL is in the business of solar power since 2012 and 5 MW photovoltaic Grid connected Solar Power Plant commissioned at Vastan Mines of Surat Lignite Power Station in January 2012.GIPCL has also commissioned 1 MW Distributed Solar Pilot Project at two locations, (i) Village: Amrol, Anand and (ii) Village: Vastan, Taluka: Mangrol in month of April-2016. Recently, GIPCL has commissioned 2x40 MW (AC) Solar PV Power Project at Gujarat Solar Park, Charanka in month of August-2017. For detailed profile of company and past financial results, bidders may visit our website: www.gipcl.com.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 29 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

2.1.2 About GSECL

Gujarat State Electricity Corporation Limited (GSECL) was incorporated in August 1993 and is registered under the Companies Act, 1956 with the objectives to initiate a process of restructuring of Power Sector and to mobilize resources from the market for adding to the generating capacity of the State and improving the quality and cost of existing generation. The Company was promoted by erstwhile Gujarat Electricity Board (GEB) as it’s wholly owned subsidiary in the context of liberalization and as a part of efforts towards restructuring of the Power Sector. The Memorandum and Articles of Association of GSECL envisage a wide spectrum of activities to improve the electricity infrastructure of Gujarat. GSECL has initiated its activities in the field of Generation of Power. The Government of Gujarat (GoG) has also given to the GSECL the status of Independent Power Producer (IPP) with approval to undertake new power projects. The Company commenced it is commercial operation in the year 1998. However, the operations of GSECL were limited to Power Stations units Gandhinagar #5, Wanakbori #7, Utran GBPS & Dhuvaran CCPP till the complete unbundling of erstwhile GEB was undertaken, i.e. up to 31st March 2005. As a part of the reform process, the Government of Gujarat has unbundled the various functions of GEB. As a result of this unbundling, Gujarat State Electricity Corporation Limited (GSECL) has taken up the responsibility of electricity generation. Electricity Transmission has been entrusted to the already existing company - GETCO. Distribution network in the state has been split up among four distribution companies, which cater to the northern, central, southern, and western parts of the state respectively. All these companies have been structured as subsidiaries of a holding company, Gujarat Urja Vikas Nigam Limited (GUVNL). GUVNL is also the single bulk buyer in the state as well as the bulk supplier to distribution companies. It will also carry out the trading function in the state. As part of Clean-Green Energy programmed, GSECL has also initiated process for installing solar panels on roof-top at identified locations within GSECL / GUVNL premises. Solar energy based power plant of 1 MW on Narmada branch canal near village Chandrasan near Sanand has commissioned in 2012. The innovative idea of merging Jal Shakti with Urja Shakti by installating Solar panels on Canal-top has made this project one of its kind in the world. Solar panels with different cell technology are integrated at single site at Gandhinagar with 1 MW Capacity. GSECL has also installed 10 MW Solar PV Power Plant under Jawaharlal Nehru National Solar Mission Phase II Batch I at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, in the GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 30 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

State of Gujarat and it was successfully commissioned in January 2015.GSECL has also commissioned 1 MW Distributed Solar Pilot Project at two locations, (i) Sikka Thermal Power Plant,Village: Sikka, Taluka & Distict: Jamnagar and (ii) Kutch Lignite Thermal Power Plant, Village: Panandhro; Taluka- Lakhpat; District-Bhuj in month of May-2016. 2.2

About the Project

2.2.1 The Gujarat Industries Power Company Limited (GIPCL) and Gujarat State Electricity Corporation Limited (GSECL) based at Vadodara in association with Gujarat Energy Research and Management Institute proposes to implement a 2x75 MW (AC) project of Crystalline silicon solar photovoltaic grid interactive power station to harness green energy. It is under Government of India (GoI) initiative to promote renewable energy. GIPCL and GSECL has been allotted 75 MW (AC) each by GUVNL and hence proposes to establish (2x75 MW) 150 MW (AC) capacity (Solar Power System(s) including development of land, buildings, plant, machinery, ancillary equipment, material, switch-gear, transformers, protection equipment and the development, design, construction, operation and maintenance for ten (10) year (i.e. 5 years after date of Commissioning & Completion of Facility and extendable for further period of 5 years as per discretion of GIPCL and GSECL) of the Power Plant is hereinafter referred to as the (the “Project”) at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, in the State of Gujarat. The Company has now decided to undertake a competitive Bidding process for selection of the EPC Contractor to implement the Project (the “Contractor”). 2.2.2 The details of the facilities which the Company requires to be set up in the present instance and for which Bids are hereby invited are described in this Request for Proposal (RFP). The overall responsibility of complete Scope of Work rests with the Bidder.

--- End of Section---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 31 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

3 Instruction to Bidders 3.1

General Instructions

3.1.1 The current document is the request for proposal, which is issued to all the potential Bidders, requesting a proposal for implementation of the Project on a fixed price basis. A Contractor would be selected through competitive bidding process for execution of the Project. 3.1.2 The Owner expects Bidders to confirm compliance to RFP terms, conditions and specifications at the time of submission of Bids, failing which the Bids are liable to be rejected. Hence, the Bidders in their own interest are advised to submit their Bids complete in all respects conforming to all terms and conditions of this RFP. 3.1.3 Before submitting the Tender, the instructions may be read carefully regarding submission of Tender. If any bidder finds discrepancies or omissions in the Tender documents or is in doubt as to the true meaning of any part, he shall clarify same from the Tender issuing office in writing before the due date of submission of the queries. 3.1.4 Bids shall be evaluated based on the information/documents available in the Bid. Hence, Bidders are advised to ensure that they submit appropriate and relevant supporting documentation along with their proposal in the first instance itself. Bids not complying with the requirements of this RFP are liable to be rejected without any further opportunity. 3.1.5 Bidders need to ensure that in the event the Project is awarded to it, and during execution of the Project, it shall not seek to alter any agreed contractual terms, conditions and specifications. 3.1.6 All Bids must be accompanied by a Tender fee and EMD of value as specified in the NIT in the form and manner as specified in the RFP document and must be delivered along with Bids. 3.1.7 The specification provided with this RFP outlines the functional requirement. The Bidder must submit a Proposal based upon their own design, meeting the functional requirements.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 32 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

3.1.8 Bidders shall deploy the latest state-of-the-art technology and must ensure that the goods supplied are new, unused and of most recent or current models and incorporate all recent improvements in design and materials for the implementation of the Project.

3.1.9 This ‘Instructions to Bidders’, in original, issued along with RFP document, shall be submitted by the Bidder along with Bid duly signed by the Bidder as the token of acceptance. Bid sent without having the prescribed RFP document and without complying with the terms and conditions of RFP shall be ignored. 3.1.10 Issuance of this RFP does not construe that the Bidder has been short-listed or qualified. 3.1.11 The Owner reserves the right, to accept or reject any Bid and to annul the bidding process and reject all Bids at any time prior to award of the Agreement, without assigning any reason thereof and without thereby incurring any liability to the affected Bidder(s). 3.1.12 The Owner reserves the right to reject any Bid submitted with deviations beyond the one that is specified and mentioned in the RFP and no time shall be given in any circumstance after opening of Financial Proposal for submission of documents which are missing with Bid. 3.1.13 In case of change in ownership of the Project, all the Agreements and Contracts signed with the Owner will stand true and valid with the new Owner of the Project. 3.1.14 Tender Issuing Authority reserves the right to cancel the NIT or to change qualifying requirement or to reject any or all the tenders so received without assigning any reason. 3.1.15 The entire site for the work shall be made available along with LoI. 3.1.16 Canvassing in connection with Tender is strictly prohibited and the Tender submitted by the Bidders who resort to canvassing will be liable to rejection straight way. 3.1.17 All rates shall be quoted on the proper form i.e. price bid supplied as part of the Tender documents on e-tender portal by the Department. 3.1.18 The Bidder shall quote for 2x75 MW Solar PV Power Plant as per the terms and conditions of this Tender and evaluation shall be done based on this quoted value. However, once bidding is completed and Successful Bidder is selected thereafter all the GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 33 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Technical and Commercial work including but not limited to design, engineering, supply, erection, testing, commissioning, PG test, etc. shall be done separately by for each 75 MW project. Further, two (2) separate Letter of Intent, Work Order, Purchase Order and O&M Order shall be issued by GIPCL and GSECL for 75 MW each and the Bidder has to submit the separate Advance, Performance and Operation & Maintenance

Bank Guarantee for each Project to GIPCL and GSECL. 3.1.19 The Gujarat Industries Power Company Limited (GIPCL) does not bind itself to accept the lowest Bid and reserves to itself the right to accept the whole or any part of the Tender and the Bidder shall be bound to perform the same at the rate quoted in this Tender. 3.2

Pre-Qualifying Requirements (PQRs)/ Eligibility Conditions

3.2.1 GENERAL i. The Bidder shall be a body incorporated in India under the Companies Act, 1956 or 2013 including any amendment thereto. A copy of certificate of incorporation shall be furnished along with the bid in support of above. 3.2.2 TECHNICAL i.

The Bidder shall have an experience of design, supply, installation, commissioning and operation or plant installation of cumulative installed capacity of 100 MW or above in India from 1 April 2013 as on the Deadline for Submission of Bid, with a minimum megawatt scale (1 MW or above) of plant.

ii.

Out of the above-mentioned 100 MW, cumulative 50 MW solar PV power plants shall have been commissioned and in operation in India. iii.

Out of the above-mentioned 100 MW, there must atleast one solar PV power plant of 40MW capacity.

iv.

The Bidder shall also submit documentary proof of achievement of performance generation gaurantee and performance of atleast one solar PV power plant of 10 MW which shall be certified from the Developer of that particular solar PV power plant.

v.

Bidder shall submit, in support to the above, the list of projects commissioned along with their work order/ LOI and the commissioning certificates along with the certificate of

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 34 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

plant being in operation. In case the bidder wants to meet the eligibility criterion through its own power plant, then a certificate from Chartered Accountant to that effect will be required to be submitted.

3.2.3 FINANCIAL i.

Cumulative Turnover of the Bidder for last three (3) financial years shall be at least Rupees Five Hundred Forty Crore Only (Rs. 540,00,00,000/-).

ii.

The Net Worth of the Bidder during the last Financial Year shall be positive, wherein the Net Worth shall be calculated as follows: Net Worth = (Equity + Reserves) – (Revaluation reserves+ intangible assets + miscellaneous expenses to the extent not written off + carried forward losses). The Bidder shall provide a copy each of audited annual report to ascertain their turnover & net-worth.

iii.

The Bidder shall submit audited annual report of FYs 2014-15, 2015-16, and 2016-17 (if not audited then certification from Chartered Accountant shall be required).

iv.

In case a Bidder is a 100 % subsidiary company & does not satisfy the annual turnover criteria, stipulated above on its own, its Holding Company would be required to meet the stipulated turnover requirements as above, provided that the Net Worth of such Holding Company as on the last day of the preceding financial year is at least equal to or more than the paid-up share capital of the subsidiary Company. In such an event, the Bidder would be required to furnish along with its Techno- Commercial Bid, a Letter of Undertaking from the Holding Company, supported by the Holding Company’s Board Resolution, as per the format enclosed in the bid documents, pledging unconditional and irrevocable financial support for the execution of the Contract by the Bidder in case of award. Over and above bidder shall submit unconditional Bank Guaranteeequivalent but not less than 5 % of EPC price from holding company which shall be furnished within ten (10) days after Notification of Award.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 35 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

3.2.4 OTHER CRITERIA FOR QUALIFICATION i.

The Tender of only those Bidders will be considered who will produce documentary proofs, self-attested to meet the following requirements: The Bidders to have valid Proof of Permanent EPF account no., ESI registration no. and Service Tax no.

ii.

The agency should have valid license under contract labour regulation and abolition of the Gujarat stateor should give an undertaking that he will get himself registered within one month if work is allotted to him.

iii.

A self-attested certificate from the Bidder to the effect that the Bidder is not blacklisted from any Public Sector undertakings of Central Govt. / State Govt. /SEBs / Corporations/ GIPCL/GSECL/GUVNL/GERMI/ UGVCL/ GETCO etc.

iv.

The experience list shall include only projects executed by Bidder himself as a turnkey contractor which shall include entire Engineering, Procurement, Supply & Installation and not as a sub-contractor. The list of project executed shall clearly mention name of the technology partner / licensee agreement company and whether the same is valid as on date with date of expiry.

v.

The Bidder shall ensure that all the information, facts & figures, data provided in the bid are accurate and correct. GIPCL reserves the right to confirm / verify any data or information through their own sources. GIPCL also may contact directly the references given for the project executed and may also visit the site, manufacturing facilities & sub-vendors works etc., physically to as certain capabilities of the applicant, if so desire at their own cost. Bidder may have to facilitate GIPCL for any such visit.

vi.

The Bidder shall furnish documentary evidence by way of copies of Contract / Purchase Order, Completion Certificate or any other equivalent document, Audited Balance Sheet and Profit & Loss Account etc., along with the Bid to establish experience / track record and financial capabilities meeting Bid Evaluation Criteria.

vii.

The Bidder or its Proprietor / Partner(s) / Director(s) of the Firm should not have been convicted by a Court of Law for an offence involving moral turpitude in relation to business dealings during the past seven (7) years.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 36 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

viii.

GIPCL shall also take into account past experience of Project execution by Bidder for GIPCL/GSECL or other reputed developers while carrying out overall due diligence of the proposal and evaluating Bidder in totality to take final call on his selection on his selection on following criteria. GIPCL decision regarding the same shall be binding to the bidder. Bidder should not have executed any project(s) making in ordinate delay beyond 6 months from the scheduled completion period for the project of 40MW or above. Bidder shall submit undertaking for the same as part of Bid submission document (As per Appendix - 21)

ix.

GIPCL/GSECL also reserves right to reject or disqualify any bidder at any stage considering its overall performance in past project (s) executed for GIPCL/GSECL based on reasonable grounds/ reasons for such rejection/disqualification.

The Bidder should meet all the above eligibility criteria as on the bid due date. The bids of only those bidders, who meet the Bidder's Eligibility Criteria, will be considered for further evaluation. Notwithstanding anything stated above GIPCL reserves the right to verify all statements/information submitted to confirm the Bidders claim on experience and to assess the Bidders capability and capacity to perform the contract should the circumstances warrant such an assessment in the overall interest of the project. Further, notwithstanding the above, GIPCL reserves the right to accept or reject any BID and to annul the process of submission of BID and reject all or any BID, at any time without assigning any reason thereof. GIPCL shall not in no way responsible or liable for any loss, damage or inconvenience caused to the rejected Applicants whatsoever. GIPCL shall be under no obligation to inform the affected Applicants of the rejection and / or ground for rejection. 3.3

Local Conditions

3.3.1 The Bidder is advised to visit and examine the site conditions, traffic, location, surroundings, climate, availability of power, water and other utilities for construction, access to site, handling and storage of materials, weather data, applicable laws and regulations, and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid and entering into the Contract Agreement. The costs of visiting the Site shall be at Bidder's own expense. 3.3.2 The Bidder and any of its personnel or agents shall be granted permission by the Owner to enter upon its premises and lands for the purpose of such inspection, but only upon GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 37 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

the express condition that the Bidder, its personnel or agents, shall release and indemnify the Owner and its personnel and agents from and against all liability in respect thereof and shall be responsible for personal injury (whether fatal or otherwise), loss of or damage to property and any other loss, damage, costs and expenses however caused, which, but for the exercise of such permission would not have arisen.

3.3.3 Failure to visit the Site or failure to study the RFP document shall in no way relieve the successful Bidder from furnishing any material or performing any work in accordance with the RFP document. 3.3.4 In no case the date of Time for Completion of the project shall be extended, due to the failure of the Bidder to visit the site and it shall be in line with the timeline of Gujarat Industries Power Company Limited (GIPCL) / Gujarat State Electricity Corporation Limited (GSECL) under the Scheme. 3.3.5 The Bidder must conduct its own inspection of the Project Site, access to the Project Site and surroundings at its own cost in order to make a proper estimate of the works to be performed under consideration of site-specific constraints. This applies in particular to the transportation of equipment to the Project site and the scope of site works. The Bidder shall also inspect the site and the access to site from the point of manufacture to make sure that its equipment is suitable for the available access and the site terrain. 3.3.6 It shall be deemed that by submitting a Bid, the Bidder has: a) made a complete and careful examination of the RFP document; b) received all relevant information requested from the Owner; c) Acknowledged and accepted the risk of inadequacy, error or mistake in the information provided in the RFP documents or furnished by or on behalf of the Company relating to any of the matters referred to in NIT. d) satisfied itself about all matters, things and information including matters referred to in the Bid Info at a glance, necessary and required for submitting an informed Bid, execution of the Project in accordance with the RFP document and performance of all of its obligations there under; e) acknowledged and agreed that inadequacy, lack of completeness or incorrectness of information provided in the RFP document or ignorance of any of the matters referred to in the RFP herein shall not be a basis for any claim for compensation, damages, GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 38 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

extension of time for performance of its obligations, loss of profits etc. from the Company, or a ground for termination of the Contract Agreement; and

f) Agreed to be bound by the undertakings provided by it under and in terms hereof. 3.3.7 The Company shall not be liable for any omission, mistake or error on the part of the Bidder in respect of any of the above or on account of any matter or thing arising out of or concerning or relating to the RFP document or the Bidding Process, including any error or mistake therein or in any information or data given by the Company. 3.4

Local Regulatory Frame Work

3.4.1 It shall be imperative for each Bidder to fully inform itself of all local conditions, laws and factors which may have any effect on the execution of the Contract as described in the Bidding Documents. The Owner shall not entertain any request for clarification from the Bidder, regarding such local conditions. 3.4.2 It is the responsibility of the Bidder that such factors have properly been investigated and considered while submitting the Bid proposals and that no claim whatsoever including those for financial adjustment to the Contract awarded under the RFP document shall be entertained by the Owner and that neither any change in the time schedule of the Contract nor any financial adjustments arising thereof shall be permitted by the Owner. 3.5

Clarifications to Tender Document

3.5.1 A Bidder requiring any clarification of the Tender documents may notify GIPCL in writing or by facsimile or by e-mail to GIPCL’s contact as mentioned in Table-A of NIT: Shri N.K.Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India Tel.:+91-265-2230182 / +91-2629-261075 Fax: +91-265-2231207 /+91-2629-261080 Email: [emailprotected], [emailprotected]

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 39 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

3.6

Amendments to Tender Document

3.6.1 GIPCL may, for any reason, whether at his own initiative or in response to a clarification requested by a prospective Bidder, modify the Tender Documents. 3.6.2 The amendments will be notified on website as mentioned in Notice Inviting e-Tender of this Tender. 3.6.3 In order to allow the prospective Bidder(s), reasonable time in which to take the amendment into account in preparing their Bids, GIPCL at its discretion, may extend the deadline for the submission of Bids. 3.7

Acceptance of Bids

3.7.1 GIPCL neither bind itself to accept the lowest nor to assign any reason for the rejection of any Bid. It is also not binding on GIPCL to disclose any analysis report. 3.8

Withdrawal of Invitation to Bid

3.8.1 While GIPCL has floated this Tender and has requested Bidders to submit their proposals, GIPCL shall always be at the liberty to withdraw this invitation to bid at any time before the acceptance of bid offer. 3.9

Representative/ Agent of Bidder

3.9.1 All the Bidders are requested to mention the name of their authorized representative/ agent, if any, with full address in the Bid. In case the representative is changed during the bidding process such changes shall be notified by the Bidder, failing which, GIPCL shall not accept any responsibility. 3.10 Financial Proposal and Currencies 3.10.1 The Bidders shall quote the prices inclusive of all the taxes, while also providing the breakup of taxes as mentioned in Appendix-15 the similar format will be present in the e-tender for online submission. The Bidder shall indicate the price in Financial Proposal in Indian National Rupee only. 3.11 Bank Guarantees & EMD 3.11.1 EMD shall be in the form of Bank Guarantee. 3.11.2 The validity of EMD shall be as mentioned in NIT.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 40 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

3.11.3 The EMD shall specifically bind the Bidder to keep its Bid valid for acceptance and to abide by all the conditions of the Tender Documents in the event of GIPCL desiring to award the work to the said Bidder. GIPCL shall have an unqualified discretion to forfeit the EMD in the event: (i) Bidder fails to keep the Bid valid up to the date specified/ required; or (ii) refuses to unconditionally accept Letter of Intent and carry out the work in accordance with the Bid in the event such Bidder is chosen as the Successful Bidder. 3.11.4 The Owner shall, however, arrange to release the EMD in respect of unsuccessful Bidders, without any interest, after the acceptance of LOI along with the submission of Security Deposit by successful Bidder. 

The EMD shall be released to bidders in the following manner. The EMD of the Successful Bidder shall be converted to Security Deposit cum Performance Bank Guarantee.

EMD of the unsuccessful bidders shall be released after releasing the EMD of the Successful Bidder.

3.11.5 The EMD shall be forfeited and appropriated by GIPCL as per the discretion of GIPCL as genuine, pre-estimated compensation and damages payable to GSECL for, inter alia, time, cost and effort of GIPCL without prejudice to any other right or remedy that may be available to GIPCL hereunder or otherwise, under the following conditions: a. If a Bidder engages in a corrupt practice, fraudulent practice, coercive practice, or restrictive practice; b. In the case of Successful Bidder, if it fails within 7 days from the issue of LoI – (a) to sign the Contract Agreement and/ or (b) to furnish the Security Deposit cum Performance Bank Guarantee within the period prescribed. c. In case the Successful Bidder, having signed the Contract Agreement, commits any breach thereof prior to furnishing the Security Deposit cum Performance Bank Guarantee. 3.11.6 The Successful Bidder shall furnish the following Bank Guarantees: i) Security Deposit cum Performance Bank Guarantee (SD/PBG) as per the format given in Appendix 18 (b): Format of Bank Guarantee for Security Deposit/ Performance Bank Guarantee, shall be furnished in favour of Gujarat Industries Power Company Limited

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 41 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

(GIPCL) and Gujarat State Electricity Corporation Limited (GSECL). The Successful Bidder shall submit Security Deposit cum Performance Bank Guarantee of 10% of each 75 MW EPC Contract Price, within two weeks after issuance of LOIs. The validity period of PBG should be for a total period up to twenty seven (27) months from the date of LoI or till the date of successful completion of PG test whichever is later; if required, the PBG shall have to be extended for further 3 months beyond the due date of successful completion of PG test. However, in case Bidder fails to submit PBG within two weeks after issue of date of LOI, GIPCL reserves the right to cancel LOI and to recover all cost and liability thereof from Bidder. The period for Performance Guarantee Test shall begin from the date mentioned in NIT of this Tender and shall continue till next one (1) year. SD/PBG shall be returned only after successful Performance Guarantee Test/ Final Acceptance Test.

ii) O&M Bank Guarantee: The Contractor shall undertake comprehensive Operation and Maintenance (O&M) activities for a period of ten (10) years from the date mentioned in NIT of this Tender. The Contractor shall submit the O&M Bank Guaranteeas mentioned in the NIT, to GIPCL /GSECL within 30 days from the date of start of O&M period as specified in the NIT of this Tender in favour of Gujarat Industries Power Company Limited / Gujarat State Electricty Corporation Limited, Vadodara. The format of the O&M Bank Guarantee is given in Appendix 18 (c): Format of Bank Guarantee for Performance for O&M. iii) Bank Guarantee against PV Module Warranty: The Successful Bidder who is not able to provide insurance of PV modules as specified in the Tender Clause No. 6.39.10 (a) shall submit a Bank Gurantee of Rs. 25 Lakh per each megawatt of PV modules (i.e. DC capacity), which shall be valid for a period of twenty five (25) years and 90 days . The minimum validity of the Bank guarantee shall be five (5) years and shall be renewed subsequently every five (5) years prior to thrity (30) days of its expiry. In case the PV module fails to provide power output as per its performance warranty, and if the Contractor fails to rectify, replace or repair the PV module, then the Owner shall carry out the necessary recrification, repair or replacement at its own discretion at the risk and cost of the Contractor. The cost of such rectificaiton, repair or replacement shall be encashed from the Bank Guarantee against PV Module Warranty. The same shall be replenished by the Contractor within thirty (30) day, failing which the entire Bank Guarantee amount shall be encashed and all pending payment shall be witheld by the Owner till such amount is replenished by the Contractor. In another instance, if the Contractor becomes bankrupt or insolvent, then the

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 42 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Owner shall immediately encash the entire amount of the Bank Guarantee against PV Module Warranty.

iv) Bank Guarantee for shortfall at the time of PG Test: In case the Contractor fails to achieve the NEEGG at the PG test then the Contractor shall, within a period of thirty (30) days, provide a Bank Guarantee of the amount equal to “Rs 26.88 x No. of shortfall units” valid for a period of 9 (nine) years. In case the Contractor achieves the NEEGG in the 10th year then the Bank Guarantee shall be returned to the Contractor at the end of 10th year of O&M Period. However, if the Contractor fails to achieve theNEEGG during the 10th year then Rs. 26.88/ kWh shall be charged for the shortfall that has occured in the 10th year with a maximum amount limited to the Bank Guarantee value. For example,during the PG Test, if the Contractor has a shortfall of 100 kWh, then the Contractor shall submit a Bank Guarantee of Rs. 2,688/- valid for 9 (nine) years. Further, at the end of 10th year, if the shiortfall is of 100 kWh then maximum penalty of Rs. 2,688 shall be encahsed from thisBank Guarantee. However, if the shortfall is of 80 kWh then Rs. 2,150 (i.e. Rs. 26.88 x 80 kWh) shall be encashed from the Bank Guarantee and the remaining amount of the Bank Guarantee shall be released to the Contractor. It is further clarified that the year-on-year shortfalls in achieving the NEEGG during the 1st to 10th year of O&M Period shall be charged as per Clause No 6.12.2 of this Tender Document, which shall be over and abve the provision of this current Clause. 3.11.7 Due to an extended nature of the O&M Bank Guarantee, the Contractor is allowed to provide O&M Bank Guarantees of not less than one (1) year and renew the same each year. However, the Contractor shall renew the O&M Bank Guarantee at least two (2) months before the expiry of the validity failing which GIPCL / GSECL will be at liberty to encash the same. In case the O&M Bank Guarantee is encashed due to any penalty then the Contractor has to replenish within 20 days the O&M Bank Guarantee for the remaining period. 3.11.8 Any lapse in the timely renewal of the O&M Bank Guarantee shall entitle GIPCL/GSECL to encash it without assigning any further reason thereof. 3.11.9 The O&M Bank Guarantee should be valid upto 45 days beyond the due date of completion of O&M year. For subsequent O&M years, the Bank Guarantee should be extended/renewed in such a manner that the same remains valid up to 45 days beyond the date of completion of each subsequent O&M year. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 43 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

3.12 Project Management Consultant and Third Party Inspection Agency

3.12.1 A Project Management Consultancy (PMC) or Third Party Inspection agency (TPI) may be appointed by GIPCL, at its sole discretion, to conduct any kind of inspection regarding procurement, fabrication, installation, hook-up, quality, execution, commissioning, operation and maintenance during the span of the Project. The Contractor shall provide necessary access and coordination to conduct such inspections. The Contractor shall provide all necessary access and cooperation for inspection by National or State agency. 3.13 Right to Accept or Reject any or all Bids 3.13.1 Notwithstanding anything contained in this Tender, the Owner reserves the right to accept or reject any Bid and to annul the bidding process and reject all Bids at any time without any liability or any obligation for such acceptance, rejection or annulment, and without assigning any reasons thereof. 3.13.2 The Owner reserves the right to reject any Bid and appropriate the EMD if: a. after reviewing the Bid there is doubt that the offered works, materials or equipment are not state of the art and/ or not suitable for the site operating conditions; b. at any time, a material misrepresentation is made or uncovered, or c. the Bidder does not provide, within the time specified by the Company, the supplemental information sought by Company for evaluation of the Bid. 3.13.3 Such misrepresentation/ improper response shall lead to the disqualification of the Bidder. If such disqualification / rejection occur after the Bids have been opened and the Successful Bidder gets disqualified / rejected, then the Owner reserves the right to: a. select the next Bidder with the Lowest Evaluated Bid Value as the Successful Bidder;

b. take any such measure as may be deemed fit in the sole discretion of the Owner, including annulment of the bidding process. 3.13.4 In case it is found during the evaluation or at any time before signing of the Contract or after its execution and during the period of subsistence thereof, that one or more of the pre-qualification conditions have not been met by the Bidder or the Bidder has made material misrepresentation or has given any materially incorrect or false information,

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 44 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

the Bidder shall be disqualified forthwith, if not yet appointed as the Contractor either by issue of the LoI or entering into of the Contract Agreement, and if the Successful Bidder has already been issued the LoI or has entered into the Contract Agreement, as the case may be, the same shall, notwithstanding anything to the contrary contained therein or in this Tender, be liable to be terminated, by a communication in writing by the Owner to the Contractor, without the Owner being liable in any manner whatsoever to the Bidder or Contractor, as the case may be. In such an event, the Owner shall forfeit and appropriate the bank guarantees without prejudice to any other right or remedy that may be available to the Owner.

3.13.5 The Owner reserves the right to verify all statements, information and documents submitted by the Bidder in response to the Tender Documents. Failure of the Owner to undertake such verification shall not relieve the Bidder of its obligations or liabilities hereunder nor will it affect any rights of the Owner there under. 3.14 Net Electrical Energy Generation Guarantee (NEEGG) 3.14.1 The Bidder shall be required to quote the Net Electrical Energy Generation Guarantee (NEEGG) for ten (10) years period at the metering point. The Bidder shall give NEEGG per annum after considering proposed configuration and all local conditions, solar insolation, wind speed and direction, air temperature & relative humidity, barometric pressure, rainfall, sunshine duration, grid availability and grid related all other factors and losses due to near shading, incidence angle modifier, irradiance level, temperature loss, array loss, module quality loss, module array mismatch loss, soiling loss and various inverter losses etc. To assess/ verify feasibility of quoted NEEGG, Bidders are required to provide computation documents along with considered factors based on which NEEGG has been computed. 3.14.2 Bidders are expected to undertake their own study of solar profile and other related parameters of the area and make sound commercial judgment about power output i.e. Net Electrical Energy Guaranteed Generation. The Site information and solar data provided in this Tender except the reference radiation for the twelve months is only for preliminary information purpose. No claim or compensation shall be entertained on account of this information. It shall be the responsibility of the Bidder to access the corresponding solar insolation values and related factors of solar plant along with

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 45 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

expected grid availability. The Bidder should access all related factors about the selected Site for the Project and then quote the NEEGG for the proposed Project.

3.14.3 The Contractor shall be responsible for achieving NEEGG. For any shortfall in NEEGG corresponding to the offer, the compensation shall be recovered from the Contractor as per Clause no. 6.12.2. The Contractor shall maintain the Plant equipment including its repair, replacement, overhauling, etc., so as to ensure guaranteed NEEGG per year, for which the Owner shall pay the agreed O&M Contract Price and the applicable taxes. NEEGG guaranteed shall not be construed as limiting value of generation. The Contractor shall maintain such that maximum generation is achieved. 3.14.4 .The Bids with NEEGG of less than or equal to 30,22,20,000 kWh (Thirty Crore Twenty Two Lacs Twenty Thousands kilo-Watt hours) for the first year for 2x75 MW (AC) plants at Delivery Point (metering at GETCO end sub-station) shall be summarily rejected. The Bidder shall submit PVsyst report along with NEEGG. 3.14.5 The deration in NEEGG quoted for any year shall not be more than 1% of the quoted for the first year. If the Bidder anticipates any degradation of the modules during the first year, it shall be taken care of to provide additional capacity of solar PV modules to meet guaranteed generation at the end of first year to avoid liquidated damages/compensation on account of Performance Guaranteed Generation. The NEEGG of consecutive year should not be more than the previous year’s NEEGG. Bids not following these conditions shall be summarily rejected. 3.14.6 This NEEGG shall be used for the evaluation of the Bids as Appendix 6: Bid Evaluation Criteria (BEC). --- End of Section ---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 46 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4 Submission of Bid General Terms 4.1

General Terms

4.1.1 A Bidder is eligible to submit only one Bid for the Project. A Bidder shall not be entitled to submit another Bid either individually or in a Consortium, as the case may be. 4.1.2 Notwithstanding anything to the contrary contained in this RFP, the detailed terms specified in the draft Contract Agreement shall have overriding effect; provided, however, that any conditions or obligations imposed on the Bidder hereunder shall continue to have effect in addition to its obligations under the Contract Agreement. 4.1.3 The Bid should be furnished in the formats mentioned in the RFP document which shall be duly signed by the Bidder’s authorized signatory, provided that the Financial Proposal will be submitted in separate envelop. 4.1.4 The Bidder shall submit a power of attorney as per the format at “Appendix 12: Format of Power of Attorney as Authorized Signatory” authorizing the signatory of the Bidder to commit to the Bid or as per their Company’s format. 4.1.5 Any condition or qualification or any other stipulation contained in the Bid shall render the Bid liable to rejection as a non-responsive Bid. The complete Bid shall be without alterations, interlineations or erasures, except those to accord with instructions issued by the Owner, or as necessary to correct errors made by the Bidder, in which case such corrections shall be initialled by the person or persons signing the Bid. 4.1.6 The RFP documents and all attached documents are and shall remain the property of the Company and are transmitted to the Bidders solely for the purpose of preparation and the submission of a Bid in accordance herewith. Bidders are to treat all information as strictly confidential and shall not use it for any purpose other than for preparation and submission of their Bid. The Company will not return any Bid or any information provided along therewith. 4.1.7 The Bidder shall submit PF code number allotted by Regional PF Commissioner. Failure to do so is likely to result in the offer being rejected.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 47 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4.1.8 Bidder shall note that the Price Bid of only those Bidders shall be opened who are found technically qualified and responsive to GIPCL’s Tender terms and conditions including but not limited to Scope of Works.

4.2

Format and Signing of Bid

4.2.1 The Bidder shall provide all the information sought under this RFP. The Owner will evaluate only those Bids that are received in the required formats and complete in all respects. 4.2.2 The Bid shall be typed or written in indelible ink and signed by the authorized signatory of the Bidder who shall also initial each page, in blue ink. All the alterations, omissions, additions or any other amendments made to the Bid shall be initialled by the person(s) signing the Bid. 4.3

Sealing and Marking Of Bid

4.3.1 The Bid of the Bidder shall be contained in one (1) single “Main” Envelope. 4.3.2 The Main Envelope shall contain two (2) Envelopes as follows: 1.

“Original” Envelope;

2.

“CD” Envelope.

4.3.3 The “Original,” Envelopes shall contain the following Envelopes: a. Cover-I: Signed Copy of the Tender Document(s) b. Cover-II: Enclosures of the Bid c. Cover-III: Proof of EMD; and Tender Fee d. Cover-IV: Financial Proposal unpriced and duly signed and stamped 4.3.4 The “CD” Envelope shall contain one (1) no. of CD containing the following folders with the same information submitted in the Original Envelope: a. Cover-I: Signed Copy of the Tender Document(s) b. Cover-II: Enclosures of the Bid c. Cover-III: Proof of EMD and Tender Fee GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 48 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

d. Cover-IV: Financial Proposal unpriced and duly signed and stamped

4.3.5 All original attested Tender Documents, Bid Enclosures, EMD and Tender Fee, and Financial Proposal (unpriced) shall be contained in the “Original” Envelope. 4.3.6 All soft/ scanned copies of the original attested Tender Documents, Bid Enclosures, EMD and Tender Fee shall be contained in the CD in an appropriately organized manner as in the physical copies, and enclosed in the “CD” Envelope. 4.3.7 IMPORTANT: THE COPY OF THE FINANCIAL BID SHALL NOT BE INCLUDED IN THE CDS. 4.3.8 Envelopes shall be clearly marked as “Original,” and “CD”. 4.3.9 The content of documents uploaded on eProcurement portal and hard copies submitted should be same and in case of any discrepancy all documents uploaded on eProcurement portal shall stay valid. 4.4

Enclosures of the Bid

4.4.1 Cover-I shall be duly marked as “Signed copy of the Tender Document(s)” and shall include the duly signed and sealed Tender Document including its annexure, appendices, attachments, amendments and any other documents as added or modified by GIPCL as per the provisions in this Tender. 4.4.2 The documents accompanying the Bid other than the attested Tender Document(s), and Proof of Tender Fee and EMD shall be placed in Cover-II and marked as “Enclosures of the Bid”. These documents shall include: a. The Covering Letter as per the format prescribed in Appendix 1: Format for Covering Letter. b. Details of the Bidder as per format prescribed in Appendix 2: Details of Bidder. Attested copy of Service Tax Registration Certificate of Bidder. c. Attested copy of PAN Card for Bidder. d. Attested Certificate of Commencement of Business issued by the Registrar of Companies for the Bidder.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 49 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

e. Attested copy of Provident Fund Code of Bidder.

f. Details of similar technical experience of the Bidder as per format prescribed in Appendix 3: Format of Details of Similar Technical Experience. g. List of proposed PV technologies as per format prescribed in Annexure 4: Format of Disclosure of PV Technology h. Project execution plan as mentioned in Appendix5: Format for Project Execution Plan. i.

Submission of Technical Document as per format prescribed in Annexure 7

j.

Details of qualified technical staff as per format prescribed in Appendix 8: Details of qualified technical staff

k. Declaration of Compliance as per format prescribed in Appendix 9. l.

No Deviation Certificate as per format prescribed in Appendix 10.

m. Declaration of Bidder’s relation to Directors of the Company as per format prescribed in Appendix 11. n. No Deviation Certificate as per format prescribed in Appendix 10: No Deviation Certificate. o. Format of Power of Attorney as Authorized Signatory as per format prescribed in Appendix 12 p. Format of Summary of audited financial statements as per format prescribed in Appendix 13. q. (If applicable) Authorization of use of financial capability by Parent as per format prescribed in Appendix 14: Format of Authorization by Parent Companywith the necessary financial statements and summary required from the Bidder. r. Format for Undertaking (Clause No. 3.2.4) as per format prescribed in Appendix 21. s. Project Operation & Maintenance (O&M) Schedule with resource planning in the form of Gantt/ Pert Charts

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 50 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

t. Technical specifications and standard warranty document of PV modules.

u. Design, specifications and document of Solar Tracking solutions (if proposed by Bidder). v. Specifications / Drawings / Designs and datasheets for all electrical work / components as prescribed in Clause No. 5 w. Technical specifications and warranty document of Inverters x. Transformers, associated switchgear and others: Bidder shall furnish in detail its warranties/guarantees for these items. 4.4.3

Cover–III shall be duly marked as “copy of Proof of EMD and Tender Fee” and shall contain the copy of proof of Tender Fee and EMD.

4.4.4 Cover-IV shall be duly marked as “Financial Proposal unpriced duly signed and stamped” and shall contain the Financial Proposal (unpriced duly signed and stamped) as per the format prescribed in Appendix 15: Format of Financial Proposal. 4.4.5 All Bid documents shall be placed in hard binding and the pages shall be numbered serially. Each page thereof shall be initialled in blue ink by the authorized signatory. 4.4.6 All envelopes in the Bid Documents shall be sealed. The outer envelope shall clearly bear the following identification: Outer Envelope “Tender Bid Document’ for setting up of 2 x75 MW (AC) Solar Photovoltaic GridConnected Power Plant at Gujarat Solar Park, Village: Charanka, Taluka: Santalpur, District : Patan, (Gujarat) on EPC basis”.

Cover-I shall bear the following identification: “Cover-I: Signed RFP Document for Engineering, Procurement, Construction, and Operation and Maintenance of 2x75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant using Photovoltaic Technology at Solar Park, Village Charanka, Taluka, Santalpur, District,Gujarat”.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 51 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Cover -II shall bear the following identification: “Cover-II: Enclosures of the Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2x75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant using Photovoltaic Technology at Gujarat Solar Park, Village Charanka, Taluka, Santalpur, District,Gujarat”. Cover -III shall bear the following identification: “Cover-III: EMD and Tender fees of the Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2x75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant using Photovoltaic Technology at Gujarat Solar Park, Village Charanka, Taluka, Santalpur, District, Gujarat”. Cover -IV shall bear the following identification: “Cover-IV: Financial Proposal (unpriced but duly signed and stamped) for the Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant using Photovoltaic Technology at Gujarat Solar Park, Village Charanka, Taluka, Santalpur, District, Gujarat”. 4.4.7 Each of the envelopes shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of each envelope. 4.4.8 Each of the envelopes shall be addressed to: ATTN: Shri N.K.Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India Tel.:+91-265-2230182 / +91-2629-261075 Fax: +91-265-2231207 /+91-2629-261080 Email: [emailprotected], [emailprotected]

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 52 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4.4.9 If the envelopes are not sealed and marked as instructed above, the Company assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted. 4.4.10 Bids submitted by fax, telex, telegram, courier or e-mail shall not be entertained and shall be rejected. 4.5

Bid Due Date

4.5.1 Bids should be submitted before the Deadline for Submission of Bid as specified in NIT. 4.5.2 GIPCL may, in its sole discretion, extend the Bid due date by issuing an Amendment/ Addendum in accordance with Clause No. 3.6 uniformly for all Bidders. 4.6

Late Bids

4.6.1 Bids received by the Owner after the specified time on the bid due date shall not be eligible for consideration and shall be summarily rejected. In case of the unscheduled holiday being declared on the prescribed closing/opening day of the Bid, the next working day shall be treated as the scheduled prescribed day of closing/opening of the Bid. 4.7

Confidentiality

4.7.1 Information relating to the examination, clarification, evaluation and recommendation for the Bidders shall not be disclosed to any person who is not officially concerned with the process or is not a retained professional advisor advising the Company in relation to or matters arising out of, or concerning the bidding process. The Company will treat all information, submitted as part of the Bid, in confidence and will require all those who have access to such material to treat the same in confidence. The Company may not divulge any such information unless it is directed to do so by any statutory entity that has the power under law to require its disclosure or is to enforce or assert any right or privilege of the statutory entity and/ or the Company. 4.8

Correspondence with the Bidder

4.8.1 The Owner shall not entertain any correspondence with any Bidder in relation to acceptance or rejection of any Bid.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 53 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4.9

Bid Opening and Evaluation

4.9.1 The Owner shall open, examine and evaluate the Bids in accordance with the provisions set out in this RFP document. 4.9.2 To facilitate evaluation of Bids, the Owner may, at its sole discretion, seek clarifications in writing from any Bidder regarding its Bid. 4.9.3 After the receipt of Bids the Owner may at its discretion send a team of engineers if necessary to inspect the engineering facilities, to ensure suitability and satisfactory working conditions at the Bidder’s works/yards(s) and equipment listed to be used by the Bidder for the work. The Bidder shall ensure that the aforesaid team shall at all the times have access to visit and inspect works, equipment etc. 4.10 Tests of Responsiveness 4.10.1 Prior to evaluation of Bids, the Owner shall determine whether each Bid is responsive to the requirements of the RFP. A Bid shall be considered responsive only if: i.

The minimum Performance Guaranteed of the Power Plant for one year is provided by the Bidder.

ii.

it is received in the manner prescribed in this RFP

iii.

it is accompanied by the requisite Tender Fee and EMD;

iv.

it is received with all the Enclosures of the Bid as prescribed in the Clause 4.4

v.

its Enclosures are received as per the formats specified in Appendices as well as the Tender;

vi.

it contains all the information (complete in all respects) as requested in this Tender (in the same formats as specified);

vii.

it complies will all the terms, conditions and provisions specified in this Tender; and

viii.

it does not contain any conditions or deviations

4.10.2 The Owner reserves the right to reject any Bid which is non-responsive and no request for alteration, modification, substitution or withdrawal shall be entertained by the Owner in respect of such Bid.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 54 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4.11 Modification and Withdrawal of Bids 4.11.1 In case any clarifications are sought by the Owner after opening of Bids then the replies of the Bidder should be restricted to the clarifications sought. Any Bidder who modifies its Bid (including a modification which has the effect of altering the value of its Financial Proposal) after opening of Bid without specific reference by the Company, shall render the Bid liable to be rejected without notice and without further reference to the Bidder and its EMD shall be forfeited. 4.11.2 No Bid may be withdrawn in the interval between the bid due date and the expiration of the validity period of the Bid. Withdrawal or unsolicited modification of a Bid during this interval shall result in the Bidder's forfeiture of its Bid Security. 4.12 Evaluation of Bid and selection of Bidder 4.12.1 GIPCL will examine the Bid to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the Bid is generally in order. 4.12.2 Prior to the detailed evaluation, GIPCL will determine the substantial responsiveness of each Bid. A substantially responsive Bid is one which conforms to all the terms and conditions of the Tender Documents without material deviations. Deviations from or objections or reservations to critical provisions such as those concerning EMD, Applicable Law and Taxes and Duties will be deemed to be a material deviation. GIPCL’s determination of a Bid’s responsiveness is to be based on the contents of the Bid itself without recourse to extrinsic evidence. 4.12.3 If the Bid is not substantially responsive, it will be rejected by GIPCL and may not subsequently be made responsive by the Bidder by correction of the nonconformity. 4.12.4 GIPCL will evaluate and compare Bids which have been determined to be substantially responsive. 4.12.5 A Bidder shall have to quote for entire 150 MW (AC) Solar PV power project. 4.12.6 Following factors shall be required for evaluation of Bid:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 55 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

a. The Evaluated Bid Value (EBV) shall be calculated using the following parameters: i.

Engineering Procurement Commissioning (EPC) Contract Price;

ii.

Net Present Value (NPV) of O&M Price of ten (10) years;

iii.

Net Electrical Energy Generation Guarantee; and

iv.

Constant parameters as indicated in the Tender.

b. The Bid with the Lowest Evaluated Bid Value shall be considered as L-1 and the Successful Bidder. The Bid with next highest value shall be considered as L-2 and so on for more understanding please refer Appendix 6. An example has also been done for Bidder’s comprehension. 4.12.7 In no case, a Bidder shall have the right to claim to be the Successful Bidder for its Bid. 4.12.8 Evaluation of both Techno-Commercial (un-priced) bids and priced bids shall be done separately. 4.12.9 Price Bids of only techno-commercial acceptable bids shall be considered for further evaluation. 4.12.10Bid Evaluation shall be done as per the details given in Appendix-6. 4.12.11For Bid Evaluation purpose, O&M period will be considered as 10 years. However, O&M period will be 5 years after COD with GEDA / GUVNL& completion of all works as per RFP, whichever is later and GIPCL/GSECL at its discretion may extend O&M period for another 5 years. 4.12.12Lowest six (6) eligible bidders or 50% out of total eligible Bidders (rounded to the next higher whole number), whichever is higher shall be invited for participation in eReverse Auction. 4.12.13Decrement value and duration for the e-Reverse Auction shall be informed to the qualified bidders before start of e-Reverse Auction. The L1 EBV shall be put up for starting e-Reverse Auction. e-Reverse auction shall be for reducing the EBV and the bidders have to reduce their EBV in decrement of value as decided before start of eReverse Auction.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 56 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4.12.14The reduction offered by the Bidder during e-Reverse Auction Process on the EBV shall be considered for as an equivalent reduction in Total EPC Contract Price only, based on formula of EBV indicated in Appendix-6. Accordingly, final EPC Contract Price will be arrived for all contractual purposes based Quoted O&M cost for 10 years and NEEGG for 10 years shall remain fixed and no change will be allowed in these parameters during e-Reverse Auction. 4.12.15After e-Reverse Auction process, L1 bidder for the entire 150 MW (AC) project shall be decided on lowest EBV. The L1 bidder after e-Reverse Auction shall have to submit break-up in line with their quoted price bid within three (3) days.

4.13 Contacts during Bid Evaluation 4.13.1 Bids shall be deemed to be under consideration immediately after they are opened and until such time the Owner makes official intimation of award/ rejection to the Bidders. While the Bids are under consideration, Bidders and/ or their representatives or other interested parties are advised to refrain from contacting by any means, the Owner and/ or their employees/ representatives on matters related to the Bids under consideration. 4.14 Employment of Officials/ Ex-Official of the Owner 4.14.1 Bidders are advised not to employ serving the Owner. It is also advised not to employ ex-personnel of the Owner within the initial two years period after their retirement/ resignation/severance from the service without specific permission of the Owner. The Owner may decide not to deal with such firm(s) who fails to comply with the above advice. 4.15 Declaration on Bidder's Relation to Directors 4.15.1 The Bidders are required to certify in prescribed format Appendix 9: Declaration of Compliance, whether he/they is/are related to any of the Directors/Senior Personnel of the Company in any of the ways mentioned in the Certificate. It is clarified that any such affirmative certificate shall not, by itself, prejudice consideration of the Bid. This certificate must accompany the Bid. 4.16 Letter of Intent (“LOI”) and Notification to Proceed 4.16.1 After selection of the Successful Bidder, a Letter of Intent (the “LoI”) shall be issued, in duplicate, to the Successful Bidder. The Successful Bidder shall not be entitled to

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 57 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

seek any deviation from the Contract, as may have been amended by GIPCL/GSECL prior to the bid submission date.

4.16.2 On issue of the LoI by the Company, Authorised representative of the Successful Bidder shall sign the Contract Agreement within 30 (thirty) days and submit the Bank Guarantee within the stipulated time. 4.17 Performance Guarantee 4.17.1 Security Deposit cum Performance Bank Guarantee (SD/PBG) as per the format given in Appendix 18 (b): Format of Bank Guarantee for Security Deposit/ Performance Bank Guarantee shall be furnished in favour of Gujarat Industries Power Company Limited and Gujarat State Electricity Corporation Limited. The Successful Bidder shall submit Security Deposit cum Performance Bank Guarantee of 10% of the EPC Contract Price, within two weeks after issue of date of LOI, initially validity period of PBG should be for a total period up to twenty seven (27) months from the date of LOI. However, in case of delay in demonstration of the PG test, the same will have to be extended upto 3 months beyond the due date for completion of PG test. The period for Performance Guarantee Test shall begin from the date mentioned in NIT of this Tender and shall continue till next one (1) year. SD/PBG shall be returned only after successful Performance Guarantee Test/ Final Acceptance Test. No interest is payable on PBG amount. 4.17.2 The bank guarantee by the Contractor will be given from bank specified in Appendix 17: List of Banks (for Bank Guarantee) only. BG of any other Bank will not be treated as valid BG. 4.17.3 The PBGs shall be liable to be encashed wholly or partly at the sole discretion of the Owner, should the Contractor either fail to execute the work within the stipulated period or fail to fulfil the contractual obligations or fail to settle in full his dues to the Owner. In case of premature termination of the contract, the PBG will be encashed and the Owner will be at liberty to recover the loss suffered by it from the Contractor. 4.17.4 The Owner is empowered to recover from the PBG through invocation of PBG for any sum due and for any other sum that may be fixed by the Owner as being the amount or loss or losses or damages suffered by it due to delay in Performance and/or non-

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 58 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

performance and / or partial performance of any of the conditions of the contract and /

or non-performance of guarantee obligations. 4.18 Fraudulent Practices 4.18.1 The Bidders may please note that the Owner shall not entertain any correspondence or queries on the status of the Bids received against this RFP. Bidders are advised not to depute any of their personnel or agents to visit the Owner’s office for making such inquiries. 4.18.2 Any effort by a Bidder to influence the Owner on the Bid evaluation, Bid comparison or Contract award decision may result in the rejection of the Bidder's Bid. --- End of Section ---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 59 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5

5.1

Scope of Work

GENERAL SCOPE OF WORK

The Tender is invited for 2 x 75 MW (150 MW) (AC) Solar PV project distributed in four plots {i.e. Plot–A & Plot-B1 [ 75MW (AC) ], Plot-B2 & Plot-C [75 MW (AC)] } with cumulative maximum DC installation capacity under Standard Test Conditions (STC) as per IEC61215 and IEC:61730. The Contractor shall comply that the AC capacity which shall be 150 MWAC including all the four plots. Capacity in each plot may differ as per plot size. The general scope of work for the 2x75 MW (AC) solar PV power plant involves Design, Engineering, Procurement & Supply and Construction (EPC), Operation & Maintenance (O&M) of the grid-connected solar photovoltaic power plant, commissioning and evacuation of power into the GETCO’s 66 kV substation of Charanka 400/220/66 kV substation corresponding to the guaranteed plant performance in the form of guaranteed energy output. Supply Laying Testing & Commissioning of 66 kV HT XPLE cable to be considered as mentioned in the tender. The four plots at Gujarat Solar Park at Charanka are: Table 5-1: Plot Area Name

Area (in Acre) Max. MW (AC)

Plot A

188.0

Plot B1

132.0

Plot B2

100.0

Plot C

221.6

Company (SPD)

75 MW

GIPCL

75 MW

GSECL

Bidder has to consider power evacuation through underground 66 KV cable (3 + 1 spare) of appropriate size from switchyard(s) to GETCO – S/S passing through the specified cable corridor/s by GPCL. Indicative length of cable corridor from each Plot shall be provided during pre- bid meeting/or earlier. Further Bidders shall explore possibility to design single Switchyard between Plot-A and Plot-B1 (GIPCL) & between Plot-C and Plot-B2 (GSECL) subject to technical and site feasibility and best commercial proposal. However termination at GETCO end shall be in two separate evacuation bays for each 75 MW (AC) project. Evacuation cable and transmission lines shall be GETCO approved and as per current carrying capacity and voltage drop selection criteria.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 60 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Figure 5-1 : Indicative Schematic Single Line Diagram For Each Project

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 61 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.1.1 Evacuation of Power & Metering Point:

For the purpose of this project, the evacuation voltage shall be at 66 kV AC (three phase) wherein evacuating point cum metering point shall be installed at 66 kV (AC) (threephase) wherein evacuation point cum metering point through ABT meter shall be 400/220/ 66 kV GETCO SS at Charanka Solar Park.. Scope of work shall also include 66 kV Overhead /Under Ground cable work from Plot-A, Plot-B1, Plot-B2 & Plot-C solar plant substation to Charanka 400/220/66 kV substation as per GETCO’s guidelines. For each plot (i.e. Plot-A, Plot-B1, Plot-B2 & Plot-C), 4 nos. of 66 kV underground cables (three-phase plus one spare) are required for evacuation considering maximum current capacity and voltage drop criteria for each evacuation line, minimum two power evacuation line shall be considered for each 75 MW plant, maximum power that can be evacuated from single circuit shall be as per GETCO guidelines. Bidder has to quote for 66 kV underground cable for power evacuation from each 75 MW (AC) project However, in case overhead transmission line feasibility is established and permitted by GETCO & GPCL, Owner shall prefer overhead line and pay GETCO approved charges for transmission line to successful bidder instead of quoted cost of 66 kV underground cable works. 5.1.2 Operation and Maintenance (O&M): The scope of work includes Operation and Maintenance (O&M) of the plant for ten (10) years (i.e. 5 years and extendable for further period of 5 years as per discretion of GIPCL / GSECL), wherein the plant shall generate at least equivalent to the guaranteed Performance of the plant. The Bidder shall submit in the Bid a comprehensive project execution schedule as well as Operation and Maintenance (O&M) schedule with resource planning in the form of Gantt chart and shall be liable for abiding by the schedule. It is the responsibility of the Contractor to perform the necessary maintenance/ timely replacement of all Civil /Mechanical or Electrical components of the project during this O&M period such that the guaranteed performance of the plant is not compromised. Any damage to CIVIL/ ELECTRICAL/ MECHANICAL components of the plant is to be reworked/ replaced/ supplied without any extra cost and time by the Contractor during complete O&M period. The Operation and Maintenance shall be comprehensive. The maintenance service provided shall ensure project functioning of the Solar PV system as a whole and Power Evacuation System to the extent covered in the Contract. All preventive/ routine maintenance and breakdown/ corrective maintenance required for ensuring maximum uptime shall have to be provided. Accordingly, the Comprehensive Operation and Maintenance shall have two distinct components as described below:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 62 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

a. Preventive / Routine Maintenance: This shall be done by the Contractor regularly and shall include activities such as cleaning and checking the health of the Plant, cleaning of module surface, tightening of all electrical connections, and any other activity that may be required for proper functioning of the Plant as a whole. Necessary maintenance activities, preventive and routine for Transformers and associated switchgears also shall be included. b. Breakdown/ Corrective Maintenance: Whenever a fault has occurred, the Contractor has to attend to rectify the fault, the fault must be rectified within 48 hrs time from the time of occurrence of fault failing which the Contractor will be penalized as per terms and conditions of this Tender.

The date of Comprehensive Operation and Maintenance Contract period of the Plant shall begin on the date as defined in the NIT of this Tender. Detailed scope of comprehensive Operation & Maintenance has been described in Chapter 5 and Annexure-7 of this document. However, operation of the Power Plant means operation of system as per bidding schedule and workmanship in order to keep the project trouble free covering the guarantee period. 5.1.3 Tracking Structures: The Owner encourages Bidders to employ proven and reliable fix or seasonal tracking or any other tracking system system, however the Bidder should note that total land available is approximately as mentioned above in Table 5-1 for the 2 x 75MW (AC) Project. The Bidder shall submit in the Bid, the details / specifications / designs / guarantees and warrantees / and any other claims on performance / output of the solar tracking solutions in the Bid document. 5.1.4 Electrical Work: Consisting of installation of solar PV modules, junction boxes, grid-tied inverters, isolation transformers, meters, control panel, HT switchgear, 66 kV switchyard for evacuation., 66 kV Overhead /UG cable work up to Charanka 400/220/66 kV Switchyard, interconnection through wires, cables, bus bars, etc.; plant lighting system, automatic weather monitoring station (AWMS), SCADA and remote web-based communication & monitoring hardware, software etc.; plant and human safety and protection equipment including danger signs etc. UPS system shall be provided at Main Control room and each Inverter room. Sump pumps shall be provided in MCR (s) &

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 63 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Switchward (s).Anything is not mentioned in the list but still required to finish the EPC contract of Solar Plant capacity to be considered for the BID. 5.1.5 Civil and Other Non-Electrical Work: i)

Module Mounting Structures (MMS): The Contractor shall design, fabricate, supply and install module mounting structures with all required accessories like clamps, nuts, bolts, cable ties etc., The structures can be of fixed/ seasonal tracker or any other tracking are accepted.

ii)

Foundations: The Contractor shall design and construct appropriate civil foundations for MMS, prefabricated structures/RCC, transformers, switchyard equipment, feeder bay etc.Grade of reinforced cement concrete shall be M25 with minimum 350kg of cement. Contractor has to submit mix design for reinforced cement concrete along with admixture. Contractor has submit batch report of each concrete batch. All necessary test related to materials of concrete mix like cement, sand, aggregates etc shall be carried out regularly as per relevant IS code. Test related to concrete cubes like compressive strength, workability etc shall be carried out. If any treatment required for foundation surface for strengthening soil characteristics i.e. application epoxy for protection against soil nature shall be applied based on geo-technical investigation report. Unless otherwise specified all the backfilling i.e. in foundation, plinth, trenches after concrete shall be carried by using fine sand only.

iii)

Prefabricated Structures: The following prefabricated /RCC structures are to be planned and constructed by the Contractor for the each 75 MW (AC) Solar PV project: 

PrefabricatedInverter rooms as per design

Pre-fabricated Control room cum Conference room with Toilet and Pantry (based on final switchyard configuration & evacuation plan)

iv)

Prefabricated Watchman’s cabin (At Main Gate (s))

Security Cabins

Storm Water Drainage System: The Contractor shall provide storm water drainage system for entire plant.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 64 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

v)

Solar PV Module Cleaning System: Cleaning frequency shall be decided by the Bidder to meet the guaranteed generation but the cleaning cycle shall not exceed 15 days. For this, the Contractor shall construct and operate 7.5 lacs liter (3x 2.5 lacs liter) underground RCC water

tank for each 75 MW Project (i.e. (i) 2x2.5 Lacs liter for Plot-A & 2.5 Lacs lit for Plot-B1 (ii) 2.5 Lacs lit for Plot-B2 (iii) 2x2.5 Lacs liter for Plot-C) with silting chamber for filtration of the water before the inlet RCC underground water storage tank. For module cleaning, the contractor can provide new tanker with pump; water jet and hose pipe or establish a pipeline network with valves. vi)

Precast Boundary Wall (Fencing): TheContractorshallprovidePrecast boundary wall including “L” shape GI angle with 4 nos of barbed wire fencing of the entire plant boundary for each 75 MW (AC) plant sites as detailed into the Clause No.5.2.12 and detailed drawing (Annexure-A4).

vii)

Approach / Internal Roads and Pathways: The Contractor shall provide internal roads and approach roads / pathways of asphalt type for all 4 plant sites. All peripheral roads shall be of WBM type.

viii)

Cable Trenches: Construction of RCC cable trenches with cable trays and covers in inverter and control rooms, earthen excavated cable trench with alternate layers of sand and brick as per relevant IS from PV arrays to inverter room to control room to switchyard shall be provided by the Contractor.

ix)

Main Gate: The Contractor shall provide main gate of structural steel and RCC material of appropriate design. Also, necessary arrangement has to be made by Contractor to erect the main gate on pylon stone.

5.1.6 Site levelling: The Contractor shall level the site, as required, so as to compact the plant in minimum possible area and also minimize shading losses because of solar PV module structures. Removal of debris and bush-cutting is mandatory. Levelling of the site is to be done if required by client before starting of Operation and Maintenance period. 5.1.7 Communication: The Contractor shall provide complete plant SCADA (Software based) with SCADA server having string level monitoring capabilities over remote server. Contractor shall lay the cable in appropriate cable trench, connect with suitable connectors and terminate to the SCADA server inside control room. The Contractor

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 65 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

shall also provide necessary internet connection through GPRS enabled modem along with LAN connectivity for data communication over remote server and shall bear the cost of the same during the Contract period including O&M. The Contractor shall provide 4 nos. of Web Client License for remote monitoring per Project. The Contractor shall provide necessary provision of RTU for communication with SLDC. The Contractor shall submit the below mentioned Technical Data Sheet for String RTU, TCP String, Central RTU in the prescribed format..

Type Code Power Entry Characteristics AC input voltage range (V ac, min V ac, max) Nominal AC input voltage (V ac,n) Rated frequency (fr) DC Input Voltage Range (V dc, min.V dc,max) Nominal DC input voltage (Vdc,n) RS485 Section Serial interface type Baud rate Protocol Number of devices Line biasing resistor (wherever necessary) Termination resistor RS485 MODBUS section Serial interface type Baud rate Protocol Number of devices Line biasing resistor (wherever necessary) Termination resistor Physical and Environmental Environmental protection rating Ambien temperature range Relative humidity

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 66 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Compliance Isolation Marking Safety and EMC standard

Essential list of I/O and equipment is given herewith, but scope is not limited to the Essential List, contractor is fully responsible to provide complete SCADA System which can be extensible / communicable with add additional / future solar plant.

Sr.

Equipment to be monitored

Data to Be Monitor (Real Time)

Type of IO

1

String Monitoring Each PV string needs to be monitored / Array Monitoring

2

String Junction Box / Array Junction Box (SJB = AJB)

SJB Bus Voltage and Current

Through Communication with SJB PLC/Card

3

Inverter

All Electrical Parameters of Inverter along with Scanning, Records & Error communication

Through Communication with SJB PLC/Card

4

Inverter Transformer

Oil and Winding Temp Monitoring

Analog Input

5

HV (11/33 kV) ON/OFF and Trip position of DI and Communication RMU / VCB Each RMU / VCB and Energy Meter RS-485 communication

6

66 KV Switchyard

Through Communication with SJB PLC/Card

All Equipment details including DI and Communication Power Transformer, Breakers, C&R Panels, Isolators, Earth Break Switches, Metering & Protection Devices etc.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 67 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7

Weather Monitoring Station

Two no. of Class II Pyranometer Through Communication (According to ISO 9060: Secondary Standard) (one for GHI, one at PV plane collector angle), Two numbers of contact type temperature sensors one at module front and the other at backside of the module. Ambient temperature sensor, Wind velocity and speed sensor.

8

Aux. Equipments

Aux. Transformers, UPS, NIFPS, AI / DI / Communication Fire Alarm Panel, CCTV, Water for Information / Records / & Utility Pumps & Panels, Street Logging Lights

9

Main and Check All electrical parameters recorded Through Meter by energy meter 485/MODDBUS communication

RS-

5.1.8 Plant Safety Equipment: The Contractor shall provide appropriate numbers of foam type fire extinguishers / CO2 extinguishers, sand buckets and transformer discharge rod at Invertor Rooms, Control Room, Security Cabin and Switchyard/Substation. Further, all high voltage places to be provided with danger sign boards with appropriate size and material to last for 25 years. 5.1.9 Statutory Requirements: All construction, operation and maintenance procedures shall be carried out through appropriate relevant standards, regulations laid by GUVNL/GETCO / UGVCL / GEDA / GIPCL/ GSECL / GoI / MNRE and / or any other agency as and when applicable. Further, this shall comply with the applicable labor laws. The Bidder shall make himself aware of such requirements and shall not solely depend on the Company to avail full information. a) All other approval, as necessary for setting up of a solar power plant including CEIG, connectivity, construction power, power evacuation, GEDA, GETCO, GPCB etc. as per the suggested guidelines. b) CT, PT and Metering system testing at ERDA or other lab as per GETCO requirements.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 68 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

c) All other statutory approvals and permissions not mentioned specifically but are required to carry out hassle free construction and operation of the plant. d) Payment to GETCO for system study, SLDC Charges, Connectivity charges and GEDA registration charges, CEIG Inspection chargesare in the scope of EPC Contractor.

All approvals, equipment, item and works which are not specifically mentioned in this document but are required for completion of work including construction, commissioning, operation & maintenance of Solar Photovoltaic Power Plant in every respect and for safe and efficient construction & erection, operation and guaranteed performance are included in the scope of this bid. 5.1.10 Planning and Designing: i.

The Contractor shall plan and design for the electrical / mechanical / civil requirements including but not limited to plant configuration, space optimization, distance between rows of modules, sufficient passage for vehicle and man-power movement in the plant, mounting structures, location of inverter room, cable routing, selection of equipment and items, procurement plan etc. to enhance plant output.

ii.

The Contractor has to carry out the complete soil investigation of the site, through Government approved laboratory before designing various civil structures. The design of all civil foundations, R.C.C structures, buildings etc. will be carried out considering appropriate seismic zone of the area. All appropriate loads, wind velocity, seismic factors etc. will be considered as per the relevant IS Specifications while designing any civil structure. Also, the environmental conditions, soil characteristics, atmospheric effect, ground water table level, rain water data, land profile, etc. must be considered as per site actual condition and accordingly appropriate precautions and preventive measures will be taken while designing the structures. RCC structures will be adopted considering surrounding weather and soil conditions of site and as per the relevant IS codes. The concrete mix design test of minimum M25 grade with minimum 350 kilograms of cement content per M3 concrete shall be carried out in Govt. certified laboratory or NABL accredited laboratory.

iii.

The Contractor shall take into consideration all parameters like wind speed, seismic zone, safety factor and safe Soil Bearing Capacity (SBC) etc. for the purpose design and construction of civil foundations for all civil work as per relevant IS codes.

iv.

The Contractor shall carryout Shadow Analysis at the site and accordingly design strings and arrays layout considering optimal usage of space, material and labor.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 69 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

v.

All designs & drawings have to be developed based on the governing standards and requirements of the project and also keeping in mind basic design specifications. Company may approve minor deviations or suggest required modifications in the same which are meant for increasing plant performance without sacrificing quality / workmanship norms.

vi.

All designs, specifications, reports, etc. submitted or used by the Contractor at any point in time shall first be approved by the Owner /Consultant and revised by Owner /Consultant, if required, prior to execution.

vii.

The technology offered shall be commercially established technology and at least one Project based on this technology shall be satisfactorily operational for at least one year in India. Details of the Project with location and the successful operational period of the Project utilizing this technology shall also be mentioned before the submission of first set of drawings for approvals.

viii.

The Owner reserves right to modify the specifications at any state as per local site conditions / requirements and EPC contractor shall comply with modification without any extra cost and time.

ix.

The Contractor has to arrange the facility for testing bulk material at site such as elcometer for testing the galvanization, cube-testing machine for testing the strength of cube samples etc.

x.

The Contractor has to send samples of the material to Govt. accredited / NABL accredited laboratory for testing as when required by the Owner.

5.1.11 Approval of Designs / Drawings i.

All designs, specifications, reports, etc. submitted or used by the Successful Bidder at any point in time shall first be approved by GIPCL/GSECL and shall be revised by Successful Bidder as per instructions given by GIPCL/GSECL if required prior to execution, for each 75 MW (AC) project.

ii.

The Bidder shall submit in the Bid a comprehensive project management schedule in the form of a Gantt chart CPM/PERT chart and shall be liable for abiding by the schedule.

iii.

The Bidder shall submit in the Bid general engineering drawings of all civil work, including but not limited to, layout of the power plant at different buildings indicating rows of photovoltaic modules, SLD, location of control panels, DC and AC Distribution Boxes, MMS design, civil foundations and anchoring design / details, shading analysis and generation estimation report etc.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 70 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iv.

The bidder shall submit in the Bid technical specifications / Drawings / Designs and datasheets for all electrical work including but not limited to electrical component of the power plant including photovoltaic modules, cables, connectors, junction boxes, inverters, transformers, monitoring and auxiliary systems, etc. for each 75 MW (AC) project.

v.

The Bidder shall submit a comprehensive maintenance schedule for operation and maintenance of the photovoltaic power plant along with checklists and shall be liable for abiding by the schedule. All construction, operation and maintenance procedures shall be carried out through appropriate relevant standards, regulations and labour laws.

vi.

The Bidder/EPC Contractor shall submit the drawing as per Tender specifications. Any revision in drawing based on Owner’s Comments/observations, in case not confirming to tender specification, then revised document shall be submitted within 03 days. In normal circumstances approval of final drawings will be given by Owner within 10 days from date of submission of revised drawings by Bidder.In case of multiple revision of documents/drawings

then

complete

time

taken

by

Bidder

for

revision

of

documents/drawings will be attributed to Contractor’s account and no claim will be entertained by Owner on account of delay in approval of drawing/documents. vii.

The Successful Bidder shall submit to the Owner the documents in hard copy (3 Set) and soft copy to both with proper reference and drawing numbers.

viii. ix.

The Successful Bidder shall submit all drawings in AutoCAD format in addition to PDF. The Successful Bidder shall also be submitted a structural Design Basis Report (DBR) for each design, Input / source file of STAAD/STRAP/STRUD/ETABS/ etc for the particular structure to the Owner in hard copy and soft copy for review and approval.

x.

The Successful Bidder has to provide Input/Source file of STAAD / STRAP / STRUD / ETABS /etc and AutoCAD drawings for the patented designs also. The Bidder Shall submit detailed design calculations of foundation, columns, walls, stairs, beams & slabs – all the structural elements in hard as well as soft copy.

xi.

No revisions are entertained once the drawing is approved. If GIPCL/GSECL is allowing for revision in approved drawing due to valid reason then time required for approval process shall not be accounted for any extension.

xii.

The Contractor has to submit all drawings, which are related to plant for approval and the Contractor, shall not claim any drawing as their intellectual property. Drawing which is developed for project will be the intellectual property of the Owner.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 71 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.1.12 Final Commissioning The commissioning procedure shall be as per GUVNL/GETCO / UGVCL / GEDA / GIPCL/ GSECL / Chief Electrical Inspector to Government (CEIG) requirements. The Contractor shall also ensure the following: i.

Obtaining written certificate of commissioning of the facility and permission to connect to the grid from the office of the Chief Electrical Inspector of the state and any other authorized representative from Government of India (GoI) / GoG / GETCO / GIPCL/ GSECL / UGVCL/GEDA/ GUVNL.

ii.

Inspection and successful electrical commissioning certificate from the Owner.

iii.

Obtaining all certificates required by DisCom from agency appointed by them.

iv.

Satisfactory completion certificate towards completion of all other contractual obligations by the Contractor as stipulated from the Owner.

5.1.13 Comprehensive Operation and Maintenance Contract The Bidder shall separately quote in Appendix 14 for Operation and Maintenance of the power plant for Ten (10) Years wherein the plant should perform at a minimum annual NEEGG derated every year by not more than 1% referring to the installed DC capacity of the plant indicated by the Bidder. Any damage to CIVIL/ELECTRICAL/MECHANICAL components of the plant is to be reworked/replaced/supplied without any extra cost and time by the Contractor during maintenance period. This means after completion of O & M period every component of the plant should be in good and working condition. 5.1.14 Terminal Point for the EPC Project (a) Complete EPC work for each 75 MW (AC) Solar PV Project up to interconnection at 66 kV GETCO sub-station. (b) GETCO supervision charges for 66 kV cable laying and termination shall be inscope of EPC contractor, including all coordination, work execution, paper work shall be carried out by EPC Contractor. (c) Solar Park LAND cost will be paid by GIPCL /GSECL to GPCL / SPIA.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 72 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

(d) Solar Park Plot will be provided to EPC Contractor as it where it basis and required land development (if any), tree/Vegetation removal, site enabling works etc shall be in EPC Contractor’s Scope. (e) Development of bay(s) at GETCO ens substation – Charges related to development of bay shall be paid by EPC Contractor to GETCO. (f) Solar Park –O&M Annual Charges to GPCL will be paid by GIPCL& GSECL.

Disclaimer: Any civil / electrical / other work, which is not mentioned or included in this Tender document but necessary for the construction and O&M of 2x75 MW (AC) Solar PV plant at Charanka shall be borne by the Contractor. The Contractor shall, unless specifically excluded in the Contract, perform all such works and /or supply all such items and materials not specifically mentioned in the Contract/ Tender Document but can be reasonably inferred from the Contract as being required for attaining completion, commissioning and performance of the facilities, delivering NEEGG and maintaining the plant & achieving NEEGG during O&M period of 2x75 MW (AC) Solar PV Power Plant at Charanka as if such work and / or items and materials were expressly mention in the Contract without any extra cost implication and liability to GIPCL /GSECL. All specifications mentioned in this Tender indicates minimum technical requirement. The Contractor may propose alternate specifications or design though the final acceptance of the same is subject to the Owner’s discretion. 5.2

CIVIL WORK

The all material, installations, fixtures, accessories etc. to be provided shall be as per the relevant I.S. specifications. These shall be of best quality and of standard manufacturer as approved by the EIC, when there are no standard specifications. The fresh OPC cement and TMT steel reinforcement bars Fe 500 shall be used confirming to relevant I.S Specifications of the approved manufacturers of GIPC Land GSECL. The agency has to keep the full proof records of purchase and consumption along with original purchase bills of Cement and Steel as per the GIPCL and GSECL procedures and rules. The agency has to provide best workmanship with skilled manpower for all the civil items as per the standard specifications/ best practice as approved by the EIC. The booklet Standard Specifications for Civil Works will be applicable wherever there is dispute in the items of civil works. GIPCL/GSECL will not supply any material for this work. 5.2.1 Topographical Survey:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 73 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

i.

Topographical survey shall have to be done by the Contractor of the proposed site at 10 m interval with the help of Total Station or any other suitable standard method of survey. All necessary Reduced Levels (RL) as entered in the Field Book/Soft Copy have to be submitted along with pre contour layout of the total site. The formation levels of the proposed power plant have to be fixed with reference to High Flood Level of the proposed site. The ground level and plinth level of structures shall be fixed taking into consideration the highest flood level and surrounding ground profiles.

ii.

Carrying out the Bench Mark (GTS) to site/sites under survey by parallel levelling, establishing and constructing bench mark, grid and reference pillars in the field and spot level survey of the entire area/areas at solar panels locations shall be in the scope of bidders.

iii.

The work shall be executed according to the specifications and good standard practice necessary to fulfill the objective of the survey work, strictly in accordance with the instructions and satisfaction of the Owner.

iv.

The Contractor shall shift Bench Mark by fly-leveling from nearest GTS Bench Mark or available source as approved by the Owner and establish two permanent Bench Mark at site. All subsequent transfer of levels shall be carried out with respect to this shifted permanent Bench Mark. The work shall also include constructing permanent reference pillars at suitably locations as approved by the Owner. These reference pillars shall be labelled permanently with their respective coordinates and reduced levels for future use. The Bench Marks and reference pillars shall be shown on the survey drawings.

v.

The field work including shifting of co-ordinates for each piles, shifting levels for construction activities shall be carried out using with Total Station Survey Equipment and shall be in the scope of bidders.

5.2.2 Soil Test: i.

Company has provided soil test report in Annexure-A4 which is meant to indicate kind of soil condition site may have and Contractor may take this preliminary report as a reference purpose only. Contractor is advised to and is solely responsible to carry out detailed Geotechnical investigation to ascertain soil parameters of the proposed site for the use of planning /designing / construction / providing guarantee / warranty of all civil work including but not limited to foundations / piling for module mounting structures, HT lines, 66 kV switchyard equipment etc. The Contractor shall carry out soil investigation through either KCT (Ahmedabad), Geo dynamics (Baroda) and Unique Lab (Surat), Bhumi Research

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 74 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

center (Surat) and NABL accredited labs or agency suggested and approved by GIPCL / GSECL. These reports shall be furnished to the Owner prior to commencing work. All RCC works shall be provided of required grade of concrete as per relevant IS specifications as well as soil data considering appropriate earthquake seismic zone, wind velocity, whether effect, soil characteristics etc.

ii.

The scope of soil investigation covers execution of complete soil exploration including boring, drilling, collection of undisturbed soil sample where possible, otherwise disturbed soil samples, conducting laboratory test of samples to find out the various parameters mainly related to load bearing capacity, ground water level, settlement, and soil condition and submission of detail reports along with recommendation regarding suitable type of foundations for each bore hole along with recommendation for soil improvement where necessary. The design will done based on considering the worst result among the bore holes. Contractor has to carry out also Electrical Resistivity Test.

5.2.3 The Contractor shall carry out Shadow Analysis at the site and accordingly design strings and arrays layout considering optimal use of space, material and man-power and submit all the details / design to Company for its review / suggestions / approval. 5.2.4 The Contractor shall obtain and study earthquake and wind velocity data for design of module mounting structure, and considering all parameters related to the weathers conditions like Temperature, humidity, flood, rainfall, ambient air etc. 5.2.5 The foundations should be designed considering the weight and distribution of the structure and assembly, and a maxim Seismic factors for the site have to be considered while making the design of the foundation. Successful Bidder shall also plan for transport and storage of materials at site and shall arrange for its own construction power and water. However, the Contractor can avail construction power connection from Discom by applying for temporary connection and has to borne all cost for the same. Client will help for supporting documents. However, the Contractor can avail construction water from concern Solar Park Authority and pay for the same at the prevailing existing rates for the usage of water. 5.2.6 The Bidder shall estimate the water requirements for cleaning the photovoltaic modules at least once in every week in order to operate the plant at its guaranteed plant performance.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 75 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.2.7

Prefabricated structures for control room and inverter rooms shall be strictly as per

relevant IS standards. 5.2.8 Land Development and Cleaning: Site is found to be more or less flat. However, the Contractor shall visit the site to ensure the land development work and do the topographical survey to ensure land development work such that land is perfectly flat. Any overburden or the deposited waste soil stuff of any mass shall be removed from the site and dispose off outside the plant premises at the location shown by GPCL. The Contractor has to clean the site from wild vegetations, small trees and shrubs, uprooting of all vegetations, removal of all debris or soil, if any; filled the depression area and excavates and level the high level areas wherever required even though contractor follows the natural ground level for entire plant execution. The Contractor can also use the natural contour of the land, if shadow is not affecting the generation. However, the Contractor shall take reasonable care to ensure that the plant is aesthetically designed. 5.2.9

Storm Water Drainage System: The Contractor has to design, submit and take approval from the Client/Consultant for storm water of the plant. It shall be designed considering rain fall, catchment area, natural gradient of the plot, outlet of the plot and in a such way that it can be easily drain off rain water and water required for module cleaning by providing sufficient slope. Storm water drain shall be of Trapezoidal section. All the internal storm water drains i.e. on both side of main central road, approach road to all inverter rooms, control room, switchyard shall be of brick/ stone pitching which is backed up by cement mortar bed which is backed by PCC on side slope and at bottom of drain and all joints of Brick/Stone masonry are to be filled up with cement mortar in C.M. 1:4, further, plaster is to be applied in case of brick masonry surface. The Contractor shall provide RCC hume pipe (NP3 grade), RCC culvert at the crossing of road, cable corridor/network, other cross drains at required locations as cross drainage work. All along the peripheral drainage shall be constructed by simply excavating and by carrying out dressing & compacting and maintaining the side slope of the drains of required size and with required trapezoidal section in which no brick pitching is required. Also, the Contractor shall provide RCC hume pipe (NP3 grade) at the crossing of road and drains and at required locations.

5.2.10 Security Cabin:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 76 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

The Contractor shall provide 4 (four) numbers of prefabricated Watchman’s portable cabin at minimum 4 (four) corners of the boundary of each plant such that safety of the plant is ensured along with one Watchman’s cabin at the Main Gate of the each plant based on final switchyard configuration & evacuation plan as mentioned in the Clause 5.1.5. The minimum size of watchmen’s (Security Cabin) cabin is 1.2 metre x 1.8 metre size and height of 2.4m with appropriate roof at the top. Location of the watch Cabin (Security Cabin) will be as directed by GIPCL/GSECL.

5.2.11 Area Lighting 

Area lighting arrangement shall be made to illuminate the entire site at an appropriate lux level for night hours or bad light hours. Road and Perimeter LUX level min 10 and rest area as per NBC 2016. Area lighting arrangement shall have adequate numbers of lights poles on the sides of roads, periphery, etc.

The connector box shall be made of stainless steel, Dust & Vermin Proof, which is to be recessed at the base of each Yard Lighting system. The connector box shall have suitable brass or copper made connector terminal.

The lighting fixtures with control gear shall be mounted on tubular poles of approved height and mounting arrangement.

All the yard lighting towers and lighting fixtures shall be effectively grounded using adequate size of GI earthing wires / GI earthing strips.

The light pole shall be fixed in separate foundation. The lighting poles shall be concreted with 600 mm coping above ground level for pole protection and 1 mtr below ground with minimum reinforcement as per IS requirement.,.

The control gear box (non-integral type) shall be encased in the coping.

Loop in – Loop out power cables shall be brought up to the control gear box through of adequate size for cable protection.

The cables shall be properly glanded to the control gear box gland plate.

XLPE / PVC insulated armored Cu/Al cables of adequate size shall be used for interconnection and supply of power to Yard lighting systems.

Cable terminations shall be made with suitable cable lugs & sockets etc. crimped properly and passed through brass compression type cable glands at the entry & exit point of the connector box and at the entry point to MCB distribution Box for controlling the yard lighting system.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 77 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

The height of the area lighting fixtures should not exceed 2.0 mts from ground. Lighting fixtures shall be installed close to fencing.

5.2.12 Boundary Wall (Fencing): The contractor shall provide and install smooth finish and uniform shape & size Precast compound wall of concrete grade M30 with use of OPC 53 Grade of GIPCL/GSECL approved brand cement, reinforced with 3mm wiron (Phosphorous Carbon steel) of TATA Make using pre-stressed technology, 1.80m high from finished ground level, Vertical post size 150mmx150mmx 2700mm, reinforced of 7nos.- 3mm dia PC steel of TATA Make, grouted below ground level by Augur Piling or excavation trench of 300mm dia, 900mm depth and grouted with PCC of 1:1.5:3 proportion of cement concrete equivalent to grade M20 at 1.80m clear distance between two vertical posts, also providing extra columns at corners and at every 15nos. columns as expansion post . In addition to expansion joint, extra columns shall be erected at maximum original ground level difference of 300mm, horizontal planks of size 1800mm x300mm x 50mm thick, reinforced with 3nos.-3mm dia. PC Steel, TATA Make, fixed in groove of vertical posts, provision of weep holes in bottom horizontal plank wherever necessary as per site condition, also provision of 12 mm dia MS bolt (7" length) grouted at the time of casting with 2" outside for fixing of angle on top of each column for Barbed wire fencing. Four nos. 12x14 swg GI barbed wire (IS278-2009) Heavy Coated 230/240 gsm Zink on wire of TATA make shall be provided on top of pre-cast compound wall and fixed over 450 mm high MS HDG “L” angle (40mm x 40mm x 5mm). The MS angle with 8 mm bottom plate shall have galvanization of minimum 80 microns shall be provided over each post. Top built up section of “L” angle is provided with 4 nos. of GI barbed wire 12X14 gauge thickness (TATA Make) as per approved drawing. The approx. Length of the precast boundary wall shall be approx................... The detail drawing of the Fencing is attached (Annexure-A4). Separate boundary wall shall be provided between B1 & B2 plot.

5.2.13 Watchman’s Cabin and Main Entrance Gate: 

An all-weather main gate with width of at least 6 meter shall be erected at the entrance of the plant site.

The Prefabricated Security Cabin of size 3.5 metre x 3.5 metre at the main entrance gate with toilet unit shall be designed in the constructed by the Successful Bidder keeping in view the safety and security of the power plant.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 78 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

The Bidder shall provide detailed civil, electrical, plumbing, drainage etc. drawings and equipment specifications for the security cabin.

5.2.14 Roads: All the roads connecting the main gate to control room, switch yard shall be accessed by Asphalt road with sufficient base courses like Sub grade, GSB, WBM layer, Wet Mix Macadam layer, DBM layer and at top Seal Coat etc. All remaining road for approaching to inverter room, peripheral roads shall be of WBM. WBM/Asphalt road width shall be of 4m plus shoulder (minimum 750mm both side) and with sufficient thickness to access heavy equipment like transformers/inverters/ switchyard equipment transportation. Contractor shall provide RCC culvert with RCC ramp with suitable gradient for approaching to Inverter room, control room and at main entry point from solar park approach to inside plant etc as required. 5.2.15 Underground RCC water Tank: i)

The Contractor has to design as per relevant IS codes, submit and take approval from client / consultant and construct 7.5 lacs liter (3 x 2.5 lacs liter) underground RCC water tank for each 75 MW Project (i.e. (i) 2x2.5 Lacs liter for Plot-A & 2.5 Lacs lit for Plot-B1 (ii) 2.5 Lacs lit for Plot-B2 (iii) 2x2.5 Lacs liter for Plot-C) with silting chamber for filtration of the water before the inlet which will match with invert level of Storm Water drain. Design of RCC water tank shall be such that it shall resist Earth pressure and Water pressure and satisfy all IS codes. Design of water tank shall be done strictly based on Soil Investigation Report with complying all latest IS codes.

ii)

The walls and floor slab shall be of reinforced concrete construction. The design and construction of these water retaining structures shall be in accordance with IS: 3370 with provision of construction/contraction and expansion joints. Resistance to cracking shall be checked as per cl. 3.3.1 and cl. 3.4.1 of IS: 3370 (PART II). Minimum thickness of structural concrete elements shall be 230mm. underground water tank walls shall also be designed for condition of external surcharge load along with ground water table and basin being empty.

iii)

Concrete for the underground water tank shall have platiciser cum waterproofing cement additives conforming to IS: 9103. In addition, limits on permeability as given in IS: 2545 shall also be met with. The concrete surface of these structures in contact with soil shall be provided with minimum two coats of bituminous painting of grade

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 79 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

85/25 conforming to IS: 702 @ 1.7 kg/sq.m (minimum) for water / damp proofing. Also provision shall be made on the inner surface of walls and base slab, so that water proofing grouting can be injected later in case of leakage.

iv)

Any loose pockets of soil below the basin floor shall be removed and filled back with plain cement concrete of mix 1:4:8.

v)

External pressure due to earth and ground water shall not be relied upon to reduce the effect of the internal water pressure, but account shall be taken of the ground water pressure when considering buoyancy or stresses in the empty water retaining structure.

vi)

Floor slab of water tank shall be designed with due consideration to prevent any possibility of flotation due to upward thrust caused by underground water. Pressure release valves conforming to IS 4558 may be permitted with the specific approval by Owner/consultant. Special care will also be taken to prevent floatation during construction period. The minimum thickness of the basin slab shall be 300 mm. Below PCC & rubble soling 1000mm thick CNS material shall be provided and compacted to 95% proctor density.

vii)

Construction of the water tank base raft & walls shall be watertight with the provision of 225mm wide approved quality PVC ribbed water stops at all construction joints and expansion joints. For Basin and channel base, kicker type of PVC water stops is preferred, whereas in walls water stops with Central Bulb and End Grip will be preferred. It shall be ensured that 225mm wide water stops are also provided all along the edges of common outlet channel at the terminal point and left projecting by half its width, to facilitate later construction by others.

viii)

The water retaining structures shall be tested for water-tightness in accordance with IS: 3370, without the backfill, if any, placed in position. For open structures, the test head shall correspond to the maximum design water level. Any rectification measures required to satisfy the test criteria shall be executed by the CONTRACTOR at his own cost all as per the directions of the OWNER.

ix)

In case of underground water tank C I rungs for descending & ascending in to the tank shall be provided. Inside the water tank, 500x500x500 mm size pit shall be

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 80 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

provided to facilitate pumping arrangement provision at suitable location to collect and pump out water collection to nearest drains.

x)

The water tank shall be so designed that it can be used during construction phase of solar plant and can also meet all other water requirements of the solar plant during O&M Stage The extension of existing pipe line from terminal point by SPIA/GPCL to underground water tank including supply and laying of pipeline shall be in the scope of contractor.

xi)

The bidder shall carryout necessary Electrifications works for connection of electrical pumps etc. Bidder shall provide 02 Nos. of minimum 5 HP submersible pumps at each water tank with necessary valve, NRVs, Piping etc.

5.2.16 Water supply: All necessary arrangement for wet cleaning of the solar panels shall be in the scope of the bidders and accordingly the agency has to provide all the necessary equipment, accessories, tool & tackles, pumps, tankers, tractors and piping arrangement which are required for the same. 5.2.17 RCC or Pre-fab Inverter/RCC or Pre-fab Control cum Conference Room Civil work for Pre-fab Inverter Room/Pre-fab Control cum Conference room: Civil work for Pre-fab Inverter Room/Pre-fab Control cum Conference room shall be of adequate size and of be of standard manufacturer with sufficient lighting points and RCC cable trenches with oil painted edge angle of 65mm x 65mm x 6mm and checker plate covers of 8 mm thickness and shall have exhaust chimney and also sufficient ventilation in terms of approved make aluminium windows and ventilators with MS grill, approved make exhaust fans and louvers for air circulation. Opening of 3.00 m x 3.00 m with approved make rolling shutter shall be provided for the access of the panels. All prefab inverter room and Control cum Conference Room shall be laid on RCC plinth with sufficient foundation, and reinforced grade slab with Vitrified of 8-10 mm thickness tile flooring and 100 mm skirting of same tiles. The plinth shall be minimum 1000 mm high from formation level i.e. from finished ground level of the plant. Plinth protection shall be given throughout perimeter of width 1.2m for Inverter rooms and Control cum Conference Rooms. Sufficient steps at the entry of the room and RCC ramp of sufficient angle shall be provided for shifting the equipment in the rooms for all Inverter rooms and Control cum Conference Room. Rainwater pipe at various locations with gutter at the top shall be provided to discharge rainwater. Approved make GI GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 81 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

rolling shutter shall be provided for Control room. All pre-fab structure of inverter room and control room shall be suitable match at plinth level to avoid any dust and water ingress. All pre-fab structure shall be water proof from roof to avoid any rain water inside the inverter and control room

i.

RCC frame structure below plinth for Inverter Rooms/Control cum Conference Roomshall have adequate size of footing, pedestal columns, plinth beam, grade slab with reinforcement as per relevant IS specifications considering seismic zone, wind and soil detail etc. Backfilling material shall be of Laboratory tested Murram or sand. Grade slab shall be laid on 100mm thick PCC. Also, Termite proofing is required before preparation of grade slab and plinth protection. The Control cum Conference Room shall have approved make rolling shutter at the front side and also provision of additional emergency exit door. RCC cable trenches shall be provided with suitable notch angle, insert plats and shall be covered with chequred plats. The dimension of cable trenches shall be based on electric, SCADA panel panel dimensions and control cables with sufficient maintenance space. Provision of sump with suitable capacity pump shall be provided in the cable trench for dewatering purpose. All structural steel shall be painted with three coat of synthetic enamel paint over two coat of primer. HDG 8.8 grade foundation bolts shall be provided for erection of pre-fab structure. After erection and alignment of pre-fab structure, bolt shall be grouted using non shrink grout materials.

ii.

Control cum Conference room shall be of adequate size (minimum height 3.6 mtr) for fixing the panels, battery banks etc. With a) Conference room; b) SCADA Room with Work station with Desktop and Chairs; c) Store Room with almirah; d) Pantry unit of sufficient size with sandwich type of platform with one sink (Nirali Make) plumbing fixture and exhaust fan; e) Toilet unit for Gents with urinals and Ladies having wash basins in each; f) RCC cable trenches with covers and cable trays and all openings of cable entry shall have vemin proofing using spray foam or mortar; g) Furniture like conference table, chair and sofa etc.; h) Lighting points and fixtures; and i) Plumbing fixtures j) Transformer yard with chainlink fencing and gate adjoining to building (outside). k) All other amenities for the operation & maintenance of Solar Photovoltaic Power Plant. l) All windows shall be equipped with sunflim protection sheet and vista make vertical blind. Facilities required for Control cum Conference Room: It shall also have adequate size SCADA cabin with necessary 2 numbers of work station with drawers of Godrej/ Durian/

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 82 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Zuari make, 2 numbers Computer and 1 number of LED TV of 48 inch of Sony/ Phillips / Samsung make, 4 numbers of chairs for workstation, 2 Nos. of almirah and split A.C of 1.5 Ton of Voltas/ Hitachi/ Samsung/LG make for operating staff for work station. Conference Room shall also be equipped with conference table of 10 persons with Power Sockets with 10 chairs of Godrej/ Durian/ Zuari/ Usha/ Lexus and sofas. In Control cum Conference room, except control room (where panels are fixed) all other rooms like SCADA cabin, conference room, store, pantry and passage shall have False ceiling that shall consist of 600 x 600 x 20 mm gypsum board with one coat of primer and two or more coat of Acrylic emulsion paint. The suspension system shall consist of 6 mm diameter galvanised steel rods suspended from ceiling supporting by aluminium grid of 38 x 25 x 1.5 mm and cross tie of 25 x 25 x 1.5 mm and aluminium angle of 25 x 25 x 1.5 mm. Conference room shall be equipped with an all-in-one printer cum scanner, landline

phone, refrigerator (150 litre) of Voltas/Godrej/Whirlpool make, projector and screen of 2m x 2m. All material, installations, accessories to be provided shall be of best quality and of standard manufacturer as approved by the EIC/ the Company. All units of the Control cum Conference Room shall have marked signage of SS sheet of 1mm along with engraving words and filled with black color at all facilities within Control cum Conference room and on all equipment. The lighting points and fixtures shall be of Anchor/Philips make. The fans shall be of Khaitan/Usha/Bajaj make and lights (only LED shall be used) shall be of Philips/Syska/Havells make. Structural Steel, Insulated Walls and Roof for Pre-fabricated Super structure: 5.2.17.1 Design of Super-Structure i.e. Steel Structure like purlin, rafter, columns, truss etc. for fixing the Pre-Fabricated Panels conforming to relevant IS codes and of Jindal/ Tata/ RINL make. It shall include all necessary fitting like nuts, bolts, washers etc, of good quality. All structural steel shall be treated with two coats of red oxide and three coats of Oil paint (Asian Paints, Berger, and Durex). The gap between base plate of structural members and concrete top of foundation shall be filled with GP-2 grouting material of reputed make. The material of all J-bolts shall be of 8.8 Class. 5.2.17.2 The Insulated panels should be of required size for roof and walls. The insulated wall and roof panels shall be sandwich type. The panels shall be made out with 0.35mm thick pre coated steel sheet on both side of Poly Urethane Foam (PUF) for both wall and roof. The density of PUF shall be 40±2 kg/m3 and thermal conductivity shall be within range of 0.019-0.021 W/m˚K at 10°C. The total thickness of the panels for walls shall be 60mm GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 83 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

and for roof is 40mm. The panels shall be joined together by tongue and groove method. The joints of the panels shall be filled with silicon or equivalent filling material. Panels shall be cuts such that the exposure of PUF and patch work is avoided. The fixing of the panels shall be such that there should not be any gaps at joints like wall and roof, wall to wall, etc. from which air and water particle can pass (Air and Water tight). Roof panel shall be extended 300mm from the eaves wall and 150mm from Gable walls. Rain water gutter shall be provided throughout the periphery with rain water pipes (CPVC pipes) with proper clamping at regular interval. Provision of future installation of Solar panels on the top of the roof shall be done by I or C section with Small base plate assembly.

Landscaping: Landscaping in surrounding area of 2 meter of MCR is to be done using aesthetically pleasing and suitable varieties of flora, Note: Successful bidder can also propose better or equivalent option for Invertor rooms and control room like Reinforced Concrete structure, Elevated Structure from the ground. The proposed option should match minimum applicable specification as mentioned below for RCC super structure. It’s at the discretion GIPCL and GSECL to approve the proposal. Walls and Roof for RCC Super structure: 5.2.17.3 RCC frame structure shall have adequate size of footing (suitable to the soil condition), columns, plinth beam, grade slab, lintel beam, roof slab, etc. Unless otherwise specified all RCC frame structure shall be of grade M25. 5.2.17.4 Pre-construction anti-termite treatment shall be done in foundation as well as floor levels. 5.2.17.5 Walls (Side cladding) constructed with red burnt clay brick having compressive strength more than 35 kg / cm2. Peripheral wall shall be of min 230 mm thick except for the adjoining wall to Transformer. It shall be of 350 mm thick. 5.2.17.6 Plastering: Plastering shall be carried out over RCC and brick works area mainly up to plinth level for Inverter rooms and Control Room cum MCC Building and battery room area. a) Plastering shall be applied to all internal, external walls as per IS 1542. Internal plaster shall be of 12 mm thick (1:4) with mala finish, PoP punning, etc. b) External plaster shall be 20 mm thick in CM (1:4) (Two layers of 12 mm and 8 mm thick layer) with mixing of waterproofing compound during second layer plaster of 8mm thick.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 84 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

c) Ceiling plaster shall be 6mm thick using CM (1:3). d) To avoid cracks all concrete /masonry joints shall be fixed with 200mm wide 24 g Chicken wire mesh before plastering.

5.2.17.7 Painting: a) Internal Paint: Oil Bound Distemper of approved make and as per recommendation of manufacturer. All internal plaster surfaces of wall & ceiling shall be painted using three coats of oil bound distemper over one coat primer of approved make and shade. b) External Paint: Asian make ACE Paint or equivalent Berger make as per recommendation of manufacturer. All external plaster surfaces shall be painted using two coats of Asian make ACE paint over one coat of primer. c) Surface preparation including crack filling, Birla white putty/panning filling etc before painting on wall/ceiling shall be carried out as per manufacturer recommendation and as directed by the Owner. 5.2.17.8 Doors, windows, ventilators: It shall be made out from Aluminium sections. All sections shall be anodized with 20 microns thickness. Sections of Door frame and window frame shall be min 2 mm thick and of approved make. Door shutters shall be made out from aluminum sections and combination of compact sheet and clear float / wired glass with sunfilm sheet on it. Room shall have required numbers and size of openable window / louvers with sunfilm sheet to provide adequate ventilation / fresh air circulations. All hardware / fixtures for doors and windows shall be of good quality (make: Dorma, Godrej and Kich) and shall be approved by the Owner. All the windows shall have MS Grill. Main door to switchgear room shall be steel door having adequate area to admit switchgear. There shall be minimum two doors to the switchgear room of flush welded steel type. 5.2.17.9 For Electrical panel room, there shall be provision of GI Rolling Shutter of adequate width and height to facilitate to load / unloading of heavy electrical panels. 5.2.17.10

Flooring: The entire control room and Inverter rooms flooring shall be provided

with 100mm thick M20 grade RCC slab on 75mm thick PCC (1:4:8) with sub-base below of 230mm rubble soling over 600mm compacted CNS filling/available soil.

(a) Final finishing over flooring : Heavy duty approved quality vitrified tiles of 600mmX600mm X 8-10mm thick. Skirting shall be 150mm high from FFL over RCC floor in electrical MCC & Panels area & store area in proper line and level.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 85 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

SCADA Room, Conference room, Pantry area, Lobby area, open area, entrance area: Heavy duty approved quality vitrified tiles of 600mmX600mm X 8-10mm thick. Skirting shall be 150mm high from FFL

Battery room: Approved quality Acid/Alkali resistance tile flooring

Lobby: Heavy duty (Size 600x600mm, 8-10 mm thick) approved quality vitrified ceramic tiles.

Toilet: Heavy duty anti-skid 6mm thick ceramic Tiles shall be glazed tiles of 6 mm thickness up to lintel level.

Entrance Steps: Brickwork and plastering with antiskid tiles.

5.2.17.11 Roof shall be given a slope of minimum 1 in 100 towards the side opposite to auxiliary transformer yard. Roof shall be given APP modified and reinforced (4 mm thick) with Polyester matt-160 grams per sq.mtr. Bitumen waterproofing membrane (4.2 kg/sq.mtr. as per manufacture’s) type water proofing treatment as per specifications. 5.2.18 Electrical requirements for Control cum Conference Room: 5.2.18.1 The Panels shall have adequate inputs to take in from the centralized Push Button Switching Unit having Suitable Mimic with Power flow Indicator & Status Indicator of different PCU’s. 5.2.18.2 The Panel shall be floor mounted type. All the measuring instruments such as feeder voltmeter, ammeter, frequency meter, Electronic Energy Meter (for measuring the deliverable units (kWh) for sale), selector switches, Mimic etc. shall be in the front panel. 5.2.18.3 All the Power cables shall be taken through backside of the Panel via sufficient /concrete cable trench and cable trays with cover at top. 5.2.18.4 The Panel shall be fitted with suitable rating & size, HRC fuses/circuit breaker/isolator indicators for all incomer and outgoing terminals, voltmeter & ammeter with suitable selector switches to monitor & measure the power to be evacuated. 5.2.18.5 Nuts & bolts including metallic cubicle shall have to be adequately protected against atmosphere and weather prevailing in the area. 5.2.18.6 The overall dimension shall be fitted with other Power Conditioning Units of the Power Plant. However, dimension, weight, sheet thickness, painting etc. should be indicated by the Bidder. The bill of material associated with the equipment should be clearly indicated while delivering the equipment.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 86 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.2.18.7 The Contractor shall provide to the Owner detailed civil, electrical, plumbing, etc. drawings and equipment specifications for the inverter/ control room and take approval from client/consultant. The drawings of Panels with the make of components should be approved from the Owner. 5.2.18.8 All the design & drawing related to switch yard / interconnection with grid should be as per requirement of GETCO and approved from GETCO. 5.2.18.9 Pre-fab structure shall have sufficient number of lighting point/ACDB/MCB board. Toilet: Toilet shall be designed for 10 persons; and constructed with following

5.2.18.10 finish

5.2.18.11

Floor: Vitrified tiles

Door and window: made out of aluminium sections, 5mm float glass

Ventilators : Mechanical exhaust facility

Plumbing fixtures : Jaquar and Kohler make

Sanitary ware : Hindware, Cera or equivalent make

EWC : 390 mm high with health facet, toilet paper roll holder and all fittings

Urinal (430 x 260 x 350 mm size) with all fittings.

Wash basin (550 x 400 mm) with all fittings.

Bathroom mirror (600 x 450 x 6 mm thick) hard board backing

CP brass towel rail (600 x 20 mm) with C.P. brass brackets

Soap holder and liquid soap dispenser.

Water Supply for Toilets: All plumbing and sanitary shall be of GIPCL/GSECL approved make. CPVC pipes of approved make & brand shall be laid down for water supply Two (02) Nos of three layered Sintex Water tank of 2000 Ltr capacity shall be installed for Control room / Conference room & Toilet / Pantry..

5.2.18.12

Drainage for Toilets: Drainage pipes shall be of UPVC (6 kg/cm2) Supreme, Prince or equivalent make. Gully trap, inspection chambers, septic tank for 10 person and soak well to be constructed for abovementioned requirement.

5.2.18.13

Air Conditioner for Control Room: The control room shall be equipped with appropriate numbers of fans for effective heat dissipation. The SCADA cabin and Conference room shall have split type air conditioning units.

5.2.18.14

Fire Extinguishers: Liquefied CO2 fire extinguisher shall be upright type of capacity 10 kg having IS: 2171. 7 IS: 10658 marked. The fire extinguisher shall be suitable for fighting fire of Oils, Solvents, Gases, Paints, Varnishes, Electrical

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 87 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Wiring, Live Machinery Fires, and All Flammable Liquid & Gas. Bidder shall provide 10 no. of portable fire extinguisher as given below.

5.2.18.15

Sand Bucket: Sand buckets should be wall mounted made from at least 24 SWG sheet with bracket fixing on wall conforming to IS 2546. Bucket stands with four buckets on each stand shall be provided in the Transformer Yard – 4 Nos.

5.2.18.16

Sign Boards: The sign board containing brief description of various components of the power plant as well as the complete power plant in general shall be installed at appropriate locations of the power plant.

For Switchyard and Transformer Yard: The Signboards shall be made of steel plate of not less than 3 mm. Letters on the board shall be with appropriate illumination arrangements.

All Inverter Rooms and Control and Conference Room: The name boards shall be made of acrylic sheet of 300mm height and fixed at the entry of the all facilities.

The Contractor shall provide to the Owner, detailed specifications of the sign boards.

5.2.19 Quality Control Laboratory 5.2.19.1 A fully equipped quality control laboratory shall be established at site with qualified personnel to conduct acceptance test on all construction materials, concrete cubes, compaction of soil testing samples etc. This laboratory shall be housed in a covered building. All testing equipment like Owen, Electrical operated cube testing machine, Sieves for grading of sand & aggregates, flakiness and elongation index testing sieve, Density of Aggregate, Electrically operated vibratory aggregate siever, jars for sand testing, Abrasion testing equipment, Impact testing equipment, Bitumin testing equipment like thermometer, marshall test apparatus etc. 5.2.19.2 Cube moulds, Slump cones, Vicat apparatus, Moisture meter, Soil testing equipments shall be arrange for laboratory. Contractor shall arrange for design mix of concrete for each grade of concrete from GIPCL / GSECL approved external laboratory or NABL. 5.2.19.3 All testing equipment shall be periodically calibrated to the satisfaction the Owner.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 88 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

TEST SHEDULE

SR.

Materials

1 1

2

2

3 4

Name of Laboratory Tests

Frequency of Test

3 1. Fineness Moduler 2. Specific Gravity 3. Water absorption 4. Alkali reaction 5. Specific gravity 6. Gradation

4 One Test per working seasons or with change of source.

CRUSHED METAL KAPACHI FOR CONCRETE 4. 5. 6. 7. 8. C.C.Cube Workability test.

1. Gradation 2. Water absorption 3. Impact value Absorption. 4. Specific gravity Soundness Flakiness Elongation 1. Compressive Strength (7 Days & 28 Days)

One Test for season or with change of source.

T.M.T BAR

1.Yield Elongation Test IS:1608 1972 2. Bent Test IS: 1590 196 3. Releaned (In case of HYSD bars only) Chemical property test for Carbon, Phosphorous and Mn.

One sample for each lot.

SAND

2.

As per IS 456 Standard.

5.2.20 BUILDING MATERIALS A1: GENERAL MATERIALS Sr.

MATERIALS/ ITEMS

1.

CEMENT (OPC 53 GRADE)

2.

REINFORCEMENT STEEL HYSD/TMT BARS GRADE FE 500

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

VENDOR / MANUFACTURERS ULTRATECH SANGHI SIDHHI ACC JAYPEE CEMENT Ambuja OPC JK Lakshmi Cement SAIL TISCO RINL THERMAX

(Sign and Seal of Bidder)

Page 89 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

ELECTROTHREM

3.

ALUMINIUM SHEETS

4.

P.V.C PIPES/ CPVC pipes

5.

VITRIFIED CERAMIC TILES

6.

GLASS

7.

ROLLING SHUTTERS

8.

BRICKS

9.

FLUSH DOORS

10.

STAINLESS STEEL

11.

WATER PROOFING

12.

PAINTS

13.

SEALANTS

14.

R.C MANHOLE COVER

15.

HARDENERS

16.

PLYWOOD PRODUCTS

17.

ALUMINIUM DOORS, PARTITIONS

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

HINDALCO INDAL JINDAL, FINOLEX SUPREME TRUEBORE NITCO RAK BRAND OR AS SPECIFIED IN ITEM FLOAT GLASS : SAINT GOBIN MODI GLASS SURAJ ROLLING SHUTTERS BARODA OR APPROVED MAKE BY OWNER , APPROVED MAKE BY OWNER

WINDOWS,

GODREJ, FALCON PLYWOOD AND INDUS- GODHRA GREEN PLY KIT PLY SS – 304 GRADE FROM SALEM STEEL PLANT APP SHEET OF TIKIDAN, FOSROC or PIDILITE ONLY BRAND NAMES GIVEN : BERGER ASIAN ICI FOSROC SICA PRECONS PRECAST CONCRETE PRODUCT CO. OR EQUIVALENT FOSROC SICA IPM, NOVOPAN PARTICLE BOARDS BHUTAN BOARDS NUWOOD PARTICLE BOARDS GODREJ INDAL JINDAL

(Sign and Seal of Bidder)

Page 90 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

18.

WATER PROOFING COMPOUNDS/ADMIXTURES/ EPOXY FLOORING

19.

PAINTS AND ACRYLIC DISTEMPERS, WEATHER PROOF PAINTS AND EXTERIOR EMULSION PAINTS

MATERIAL OF CONSTRUCTION FOSROC SICA PIDILITE ASIAN PAINTS ICI BERGER.

20.

DOOR CLOSERS

EVERITE MAKE

21.

METAL CLADDING SYSTEM, SANDWICH PANEL

22.

PUTTY

23.

PLASTICISER/ADMIXURE

24.

ACID /ALKALI RESISTING PAINT

25.

NON SHRINK GROUT MATERIAL

TATA BLUE SCOPE, LLOYD INSULATIONS (INDIA) LIMITED, KING SPAN TURKEY SINTEX BIRLA ASIAN BERGER, FOSROC SIKA, ASIAN BERGER FOSROC

26.

GYPSUM FALSE CEILING (gyp board)

ARMSTRONG

A2. SANITARY AND WATER SUPPLY WORK (INTERNAL) (FIRST QUALITY TO BE-USED) SR.

MATERIALS/ ITEMS

VENDOR / MANUFACTURERS

1.

RCC PIPES

2.

G.I. PIPE

APPROVED MANUFACTURER CONFORMING B.I.S. STANDARD TATA MEDIUM CLASS.

3.

G.I. FITTINGS

“R” BRAND

4.

CPVC Pipes

5.

SLUICE VALVES, CHECK VALVES ETC.

6.

BRASS FITTINGS

7.

C.P., FITTINGS

FINOLEX,SUPREME AND ANY OTHER APPROVED BRAND LEADER ENGINEERING WORKS, JALANDHAR; KIRLOSKAR BROS. LIMITED, PUNE; LEADER ENGINEERING JALANDHAR; L & K MATHURA, L & K make

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 91 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

8.

W.C. PAN WASH BASIN, URINALS SINK LOW DOWN FLUSHING CISTERN

STAINLESS STEEL SINK WITH DRAIN BOARD 10. MIRRORS 9.

11. WHITE GLAZED & COLOUR GLAZED CERAMIC TILES. 12. GLAZING GLASS.

EID, PARRYWARE, HINDUSTAN SANITARYWARE, CALCUTTA; KOHLER NIRALI PHILCO, ATUL GLASS WORKS, VALLABH GLASS WORKS, GOLDENFISH H&R JOHNSON TILES, SPARTEK, NITCO MODI FLOAT SAINT GOBAIN.

A3. STRUCTURAL STEEL SR.

MATERIALS/ ITEMS

VENDOR / MANUFACTURERS

1.

WELDING ELECTRODES

ADOR,D&H ,ESSAB

2.

STRUCTURAL STEEL RAW MATERIALS

TISCO, SAIL, JINDAL, RINL

3.

ANCHOR BARS

BRIGHT BARS

4.

SHEETING AND SANDWITCH PANELS FOR PRE_ENGINEERING WORK

TATA BLUE SCOPE, SINTEX JINDAL, KIRBY

NOTE: (1) Wherever the make is not specified for any other items, the Contractor shall submit credential for vendors for relevant items / equipments, out of which the Owner shall decide acceptance of vendor based on review of credentials. This shall have no price implication. The Owner reserves the right to reject the proposed vendor without assigning any reason. (2) Bidder may suggest /request for approval of Additional vendor with credentials and details

for review and approval of Owner. The Owner may consider the request in case proposed additional vendor is reputed and meeting the tender specification requirements. The Owner reserves the right to reject the proposed vendor without assigning any reason. 5.2.21 Clean up of Work Site After completion of all works, the Contractor shall have to demobilized all the equipments, machinery and materials from plant premises. The Contractor shall have to clean the entire GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 92 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

area by removing all unwanted construction materials, unwanted temporary structures, debris, excess earth, all type of scrape, wastage and unwanted materials from plant premises as directed by the Owner.

5.2.22 Module Mounting Structures (MMS) i.

The MMS should be designed for an optimum tilt angle (fixed / season / single axis tracking) so as to meet the offered NEEGG. The angle should be systematically optimized for maximum energy generation throughout the year based on location and local weather variables for each module technology.

ii.

The MMS should be safe, and designed to allow easy replacement of any module and easy access to the O&M staff. It should be designed for simple mechanical and electrical installation, should support Solar PV modules at a given orientation, absorb and transfer the mechanical loads to the ground properly and there should be no requirement of welding or complex machinery at site. Irrespective of design, none of the components shall be less than 1mm.

iii.

The array structure shall be so designed that it will occupy minimum space without sacrificing the output from Solar PV panels at the same time it will withstand severe cyclonic storm with wind speed up to maximum 180 Kmph.

iv.

It shall support Solar PV modules at a given orientation, absorb and transfer the mechanical loads to the ground properly. There shall be no requirement of welding or complex machinery at site and is strictly not allowed.

v.

Seismic factors for the site to be considered while making the design of the foundation/ramming etc. Or any technology. The design of array structure shall be based on soil test report of the site and shall be approved from the Owner / Consultant. Before final approvalof drawing/design pile foundation for any type of structure i.e MMS, MCR, LCR etc pile load test shall be conducted and result shall be submitted to GIPCL, GSECL&GERMI.

vi.

The Contractor has to plan for pile load test like pull out, laternal and compression of minimum 10,10,3 are required to be conducted for each floor at strategic location, immediately after recieving LoI. Based on the results of above-mentioned tests, final approval for design of pile shall be provided.

vii.

Modules shall be mounted on a non-corrosive support structures (EPDM rubber gasket is to be provided as separator) which is mandatory. The frames and leg assemblies of the array structures shall be made of hot dip Galvanized steel per ASTM A123.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 93 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

viii.

In case of galvanization of structures, specific requirement for thickness of galvanization should be at least minimum 80 microns at any point of the galvanized structure. Galvanization shall be measure with elcometer or the material can be sent for testing laboratory as and when required. No averaging is allowed for measuring the thickness of galvanization. Inner side galvanization with same specification of any hollow components of module mounting structure is mandatory.

ix.

All nuts and bolts (fasteners) shall be made very good quality stainless steel of grade SS 304 required for module fixing and for other components of MMS, superstructure or switchyard, inverter room, control room, etc. in the plant premises nuts and bolts (fasteners) shall be of MS material with minimum Grade HDG: 8.8.

x.

Modules shall be clamped / bolted with the structure properly. The material of construction shall be Al / Steel. Clamps / bolts shall be designed in such a way so as not to cast any shadow on the active part of a module.

xi.

Modules shall be isolated electrically from the MMS through EPDM sheet of appropriate thickness and all the modules shall be separately earthed through proper earthing. Module to module earthing is mandatory.

xii.

Module mounting structures shall also be earthed through proper separate earthing.

xiii.

The material of construction, structural design and workmanship shall be appropriate with a factor of safety of not less than 1.5.

xiv.

For multiple module mounting structures located in a single row, the alignment of all modules shall be within an error limit of 5 mm in vertical / horizontal line.

xv.

The Contractor shall provide to the Owner the detailed design, specifications and calculations of the MMS and take approval from the Owner /Consultant.

xvi.

The Contractor shall specify installation details of the Solar PV modules and the support structures with appropriate diagrams and drawings.

xvii.

The Module Mounting Structure design shall be certified by a chartered structural engineer and it is mandatory.

xviii.

The Contractor should design the structure height considering highest flood level at the site. The minimum clearance between the lower edge of the module and the ground shall be the higher of (i) above highest flood level at the site and (ii) minimum 500 mm.

xix.

String Cables should be passes from Pipes and Cable-ties shall be used to hold and guide the Pipes (cables/wires) from the modules to inverters or junction boxes.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 94 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xx.

The Contractor shall provide to the Owner the detailed design, specifications and calculations of the MMS.

xxi.

Curing of all piles shall be done thrice a day and be maintained for a period of seven days from the date of casting.

xxii.

The Contractor has to ensure sufficient lighting arrangement for all concreting activities during night time. Sufficient illumination should be ensured in and around areas wherever civil and construction activities take place during night time.

xxiii.

The Contractor shall specify installation details of the Solar PV modules and the support structures with appropriate diagrams and drawings.

xxiv.

The Bidder shall be permitted ramming of the module mounting structure provided that they obtain consent of EIC. EIC shall provide such consent once it is convinced that such ramming shall not in any way deteriorate the strength of the structure and shall not reduce the structure’s strength to enjoy a working life of more than 25 years. The design should be done by considering the life of the structure of 25 years.

xxv.

Civil foundation design for Module Mounting Structures (MMS) as well as control room, invertor room shall be made in accordance with the Indian Standard Codes and soil conditions, with the help of Chartered Structural Designer having substantial experience in similar work. The Successful Bidder shall submit the detailed structural design analysis along with calculations and bases/ standards in the Bid.

xxvi.

Module Mounting Structures Design is to be certified by Chartered Structure Engineer and certificate to be produced along with the design details for approval by GERMI / GIPCL/GSECL.

5.2.23 Switchyard structures / transmission line structure designs shall be strictly as per GETCO design. The structural components of Switchyard shall be HDG of minimum 80 microns.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 95 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.3

DETAILED ELECTRICAL WORK (For 2x75 MW (AC) Project)

5.3.1 Photovoltaic Modules The Contractor shall employ solar PV Module of Crystalline-Si (Poly / Multi or Mono / Single) solar technology only. The Contractor shall provide detail Technical Data Sheets, Certifications of Standard Testing Conditions (STC: defined as Standard Testing Condition with air mass AM1.5, irradiance 1000W/m2, and cell temperature 25°C) as per the latest edition of IEC 61215 and IEC 61730-2nd Edition and as tested by IEC / MNRE recognized test laboratory. The Bidder shall also specify the minimum guaranteed energy output of solar PV module as per the site condition in the RFP. i.

The PV modules to be employed shall be of minimum 72 cell configuration with rated power of module ≥300 Wp as certified for solar PV module power performance test as prescribed by latest edition of IEC 61215 and IEC 61730 and as tested by IEC / MNRE recognized test laboratory. The maximum tolerance in the rated power of solar PV module shall have maximum tolerance up to +3%. No negative tolerance in the rated capacity of solar PV module is allowed.

ii.

All modules shall be certified IEC 61215 2nd Ed. (Design qualification and type approval for Crystalline Si modules), IEC 61730 (PV module safety qualification testing @ 1000 V DC or higher).IEC 62804 Certified PV modules should be PID free, documents for the same should be submitted with conditions of the PID test should be for a humidity of 85 % and a cell temperature of 850 C at 1000Volts or higher , IEC 62716 , IEC 61701.

iii.

The certified Bill of Material (BOM) to be used in the PV Modules should be the same as used during the IEC certification of reference PV Module certified by renowned agency like TUV, UL, etc.

iv.

Minimum certified module efficiency shall be 15% for crystalline with minimun fill factor of 0.75. The permissible maximum temperature coefficient of power (Pmpp) shall be 0.43%/ 0C or better.

v.

All photovoltaic modules should carry a performance warranty of >90% during the first 10 years, and >80% during the next 15 years. Further, module shall have performance warranty of > 98% during the first year of installation. Degradation of PV module for first year shall be limited to 3.5% and shall not be more than 1% in any subsequent year.

vi.

The module mismatch losses for modules connected to an inverter should be less than 1%.

vii.

SPV module shall have module safety class-II and should be highly reliable, light weight and must have a service life of more than 25 years.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 96 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

viii.

The PV modules shall be equipped with IP67 or higher protection level junction box with min. 3 bypass diodes of appropriate rating and appropriately sized output power cable of symmetric length with twist locking connectors.

ix.

The SPV module shall be made up of high transmitivity glass & front surface shall give high encapsulation gain and the module shall consists of impact resistance, low iron and high transmission toughened glass. The module frame shall be made of corrosion resistant material, which shall be electrically compatible with the structural material used for mounting the modules.

x.

The SPV modules shall have suitable encapsulation and sealing arrangements to protect the silicon cells from environment. The encapsulation arrangement shall ensure complete moisture proofing for the entire life of solar modules.

xi.

The module frame should have been made of Aluminium or corrosion resistant material, which shall be electrolytically compatible with the structural material used for mounting the modules with sufficient no. of grounding/installation.

xii.

All materials used for manufacturing solar PV module shall have a proven history of reliability and stable operation in external applications. It shall perform satisfactorily in relative humidity up to 100% with temperature between -40°C to +85°C and shall withstand adverse climatic conditions, such as high speed wind, blow with dust, sand particles, saline climatic / soil conditions and for wind 180 km/hr on the surface of the panel.

xiii.

Modules only with the same rating and manufacturer shall be connected to any single inverter. Modules shall compulsorily bear following information in the form of ID encapsulated with solar cell in the manner so as not to cast shadow on the active area and to be clearly visible from the top.

xiv.

The Bidder shall provide to the Owner in the Bid, power performance test data sheets of all modules. The exact power of the module shall be indicated if the data sheet consists of a range of modules with varying output power.

xv.

Only those crystalline modules (above 300Wp) of the same module manufacturer which has supplied for a capacity more than 100MW in other projects in India with minimum 1 project size of 10 MW. On this account, the Contractor shall provide full information, to the satisfaction of GIPCL/GSECL, before placing final order for the modules. The Contractor shall also submit the proof of original purchase.

xvi.

GIPCL/GSECL or its authorized representative reserves the right to inspect the modules at the manufacturer’s site prior to dispatch.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 97 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xvii.

The Bidder is advised to check and ensure the availability of modules prior to submitting the Tender Document.

xviii.

The Contractor would be required to maintain accessibility to the list of module IDs along with the above parametric data for each module. Table 5-2 Information to be displayed on solar PV module Sr.

Particulars

1

Name of the manufacturer of the PV module and RFID code

2

Name of the manufacturer of solar cells

3

Month & year of the manufacture (separate for solar cells and modules)

4

Country of origin (separately for solar cells and module)

5

I-V curve for the module at standard test condition (1000 w/m2 , AM 1.5, 25oC

6

Wattage, Imp, Vmp, Isc, Voc, temperature co-efficient of power and FF for the module

7

Unique Serial No. and Model No. of the module

8

Date and year of obtaining IEC PV module qualification certificate

9

Name of the test lab issuing IEC certificate

10

Other relevant information on traceability of solar cells and module as per ISO 9001 and ISO 14001

5.3.2 Junction Box / Combiner Box i.

The Contractor shall provide sufficient no. of Array Junction Boxes / PV combiner boxes / DCDBs.

ii.

All switch boards shall be provided with adequately rated copper bus-bar, incoming control, outgoing control etc. as a separate compartment inside the panel to meet the requirements of the Chief Electrical Inspector of Government (CEIG). All live terminals and bus bars shall be shrouded. The outgoing terminals shall be suitable to receive suitable runs and size of cables required for the Inverter/Transformer rating.

iii.

The degree of protection for following equipment shall be: 

Outdoor Junction Box : IP 65 or above, with canopy

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 98 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iv.

All junction/ combiner boxes including the module junction box, string junction box, array junction box and main junction box should be equipped with appropriate functionality, safety (including fuses, grounding, etc.), string monitoring capabilities, and protection.

v.

The terminals will be connected to copper bus-bar arrangement of proper sizes to be provided. The junction boxes will have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and outgoing cables. Suitable markings shall be provided on the bus-bars for easy identification and cable ferrules will be fitted at the cable termination points for identification. The Array Junction Box shall also have suitable type-II surge protection device. In addition, over voltage protection shall be provided between positive and negative conductor and earth ground such as Surge Protection Device (SPD) or on-load DC disconnectors with shoes. All incoming & outgoing cables must be terminated in junction boxes with polyamide glands or PV connector receptacles. The rating of the Junction Boxes shall be suitable with adequate safety factor to inter connect the Solar PV array.

vi.

The Junction Boxes shall have suitable arrangement for the followings a. Provide arrangement for disconnection for each of the string / input. b.

DC disconnector for group array isolation

c. The rating of the Junction Boxes shall be suitable with adequate safety factor to inter connect the Solar PV array. vii.

The junction boxes shall be dust, vermin, and waterproof and made of thermoplastic/ metallic in compliance with IEC 62208, which should be sunlight/ UV resistive as well as fire retardant & must have minimum protection to IP 65(Outdoor) and Protection Class II or higher. Junction box shall be designed for 1000V DC or 1500V DC system as applicable.

viii.

The terminals will be connected to copper bus-bar arrangement of proper sizes to be provided. The junction boxes will have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and outgoing cables.

ix.

The current carrying rating of the Junction Boxes shall be rated with standard safety factor to interconnect the Solar PV array.

x.

Based on proven practice / design bidder may consider interconnection of maximum two strings with “ Y” connector and accordingly solar cable sizing shall be designed.

xi.

Suitable markings shall be provided on the bus-bars for easy identification and cable ferrules will be fitted at the cable termination points for identification.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 99 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xii.

Adequate capacity solar DC fuses & isolating disconnectors should be provided. Fuses and monitoring facility for each string/ input including spare terminals shall be provided.

The String Junction Box must have adequate space for maintenance and spare input terminals. For SJB with upto 25 inputs 2 inputs shall be kept in spare, for SJB with more than 25 inputs 3 inputs shall be kept in spare. xiii.

Detailed junction box specifications and data sheet shall be provided in the Technical Bid document.

xiv.

Other Sub systems and components used in the SPV power plants (Cables, connectors, Junction Boxes, Surge Protection devices, etc.) must also confirm to the relevant international /national standards for electrical safety besides that for quality required for ensuring expected service life and weather resistance. It is recommended that the interim, the cables of 1000-1800 Volts DC for outdoor installations should comply with the draft EN 50618 for service life expectancy of 25 years.

5.3.3 Inverter and Power Conditioning Unit (PCU) i.

Only those PCUs/ Inverters which are commissioned for more than 100 MW1 capacity (1000V DC) or 50 MW capacity (1500V DC) in other solar PV projects till date shall be considered for this project. The Contractor has to provide sufficient information to the satisfaction of GIPCL/GSECL before placing the final order for PCUs/Inverters. Power Conditioning Unit (PCU) shall consist of an electronic inverter with latest technology available in the market along with associated control, protection and data logging devices and must be fully communicable to SCADA with OPEN Communication Protocol. If any software required for the communication & SCADA, the same to be made available within the EPC package by the Contractor.

ii.

All PCUs should consist of associated control, protection and data logging devices and remote monitoring hardware, software for string level monitoring.

iii.

Dimension and weight of the PCU shall be indicated by the Bidder in the Bid.

iv.

Capacity of single unit of inverter shall be min. 1,000 kW.

v.

No. of inverters to be supplied shall be worked out by the Contractor based on DC rating of inverter, Pnom ratio, limit on overloading capacity.

1

This is to be noted that 100 MW capacity is for the Inverter manufacturer to test their strength and capability for supplying for this Project. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 100 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

vi.

The Bidder shall guarantee average annual power loss due to non-threshold condition to be less than 0.1% and shall support the claim with necessary document / data / graphs in the Bid.

vii.

DC Injection into the grid: This shall be avoided by using a step-up transformer at the output of the inverter. DC injection shall be limited to 1% of the rated current of the inverter as per IEC 61727.

viii.

Inverters shall be capable of operating at varying power factor preferably in between 0.85 lag to 0.85 lead and shall be able to inject or absorb reactive power.

ix.

Inverters shall operate at ambient temperature of 50°C without deration.

x.

The up-time of Inverters should be of 99% in a year, in case of failing to achieve this due to failure of any component of inverter the Contractor shall either replace the inverter or the componentat his own cost.

xi.

All inverters shall be tested for IEEE 519 &IEC 62116 standard.

xii.

DC input terminals must be in enough numbers so as each terminal is connected to dedicated single input. Two DC inputs shall not be connected on the single input DC terminal of the inverter. If adequate number of input are not available in the selected inverter by the Contractor then a DC junction box with protection devices such as fuse DC disconnects and copper busbar with rated current carrying capacity may be incorporated in to design. The Bidder has to indicate the selected parameters in the Bid.

xiii.

The minimum European efficiency of the inverter shall not be less than 98% measured at 100% load as per IEC 61683 standards for measuring efficiency. The Bidder shall specify the conversion efficiency of different loads i.e. 25%, 50%, 75% and 100% in the Bid. The Bidder should specify the overload inverter capacity in the Bid.

xiv.

The PCU shall be tropicalized and design shall be compatible with conditions prevailing at site. Provision of exhaust fan with proper ducting for cooling of PCU’s should be incorporated in the PCU’s, keeping in mind the extreme climatic condition of the site.

xv.

The inverters shall have minimum protection to IP 65(Outdoor)/ IP 21(indoor) and Protection Class II or higher.

xvi.

Nuts & bolts and the PCU enclosure shall have to be adequately protected taking into consideration the atmosphere and weather prevailing in the area.

xvii.

(Grid Connectivity) Relevant CERC/GERC regulations and grid code as amended and revised from time to time shall be complied. The system shall incorporate a uni-directional inverter and should be designed to supply the AC power to the grid at load end. The powerconditioning unit shall adjust the voltage & frequency levels to suit the Grid.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 101 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xviii.

All three phases shall be supervised with respect to rise/fall in programmable threshold values of frequency.

xix.

The inverter output shall always follow the grid in terms of voltage and frequency. This shall be achieved by sensing the grid voltage and phase and feeding this information to the feedback loop of the inverter. Thus control variable then controls the output voltage and frequency of the inverter, so that inverter is always synchronized with the grid. The inverter shall be self-commutated with Pulse width modulation technology.

xx.

This should be capable of synchronize maximum within 1 Minutes.

xxi.

The PCU shall be capable of controlling power factor dynamically.

xxii.

Maximum power point tracker (MPPT) shall be integrated in the power conditioner unit to maximize energy drawn from the Solar PV array. The MPPT should be microprocessor based to minimize power losses. The details of working mechanism and make of MPPT shall be mentioned by the Bidder in the Bid. The MPPT must have provision for constant voltage operation. The MPPT unit shall confirm to IEC 62093 for design qualification.

xxiii.

The system shall automatically “wake up” in the morning and begin to export power provided there is sufficient solar energy and the grid voltage and frequency is in range.

xxiv.

Sleep Mode: Automatic sleep mode shall be provided so that unnecessary losses are minimized at night. The power conditioner must also automatically re-enter standby mode when threshold of standby mode reached.

xxv.

Stand – By Mode: The control system shall continuously monitor the output of the solar power plant until pre-set value is exceeded & that value to be indicated.

xxvi.

Basic System Operation (Full Auto Mode): The control system shall continuously monitor the output of the solar power plant until pre-set value is exceeded & that value to be indicated.

xxvii.

The PCU shall include appropriate self-protective and self-diagnostic feature to protect itself and the PV array from damage in the event of PCU component failure or from parameters beyond the PCU’s safe operating range due to internal or external causes. The self-protective features shall not allow signals from the PCU front panel to cause the PCU to be operated in a manner which may be unsafe or damaging. Faults due to malfunctioning within the PCU, including commutation failure, shall be cleared by the PCU protective devices. In addition, it shall have following minimum protection against various possible faults. a. Earth Leakage Faults: The PCU shall have the required protection arrangements against earth leakage faults and –Ve DC directional protection.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 102 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

b. Over Voltage & Current: In addition, over voltage protection shall be provided between positive and negative conductor and earth ground such as Surge Protection Devices (SPD). c. PCU shall have arrangement for adjusting DC input current and should trip against sustainable fault downstream and shall not start till the fault is rectified. d. Galvanic Isolation: The PCU inverter shall have provision for galvanic isolation. Each solid state electronic device shall have to be protected to ensure long life of the inverter as well as smooth functioning of the inverter. e. Anti-islanding (Protection against Islanding of grid): The PCU shall have anti islanding protection. (IEEE 1547/UL 1741/ equivalent BIS standard). f. Unequal Phases: The system shall tend to balance unequal phase voltage. g. Heat Transfer / Cooling / Built in Ventilation Systems must be provided with 20% Spare capacity. Bidders to Submit Heat Rejection / Transfer calculation for Air Conditioning of Inverter Room. h. Inverter must be provided with –Ve earthing for protection of PV modules against possible “Potential Induced Degradation”.

xxviii.

Reactive Power: The output power factor of the PCU should be of suitable range to supply or sink reactive power. The PCU shall have internal protection arrangement against any sustained fault in the feeder line and against lightning in the feeder line.

xxix.

Isolation: The PCU shall have provision for input & output isolation. Each solid-state electronic device shall have to be protected to ensure long life as well as smooth functioning of the PCU.

xxx.

All inverters/ PCUs shall be three phase using static solid state components. DC lines shall have suitably rated isolators to allow safe start up and shut down of the system. Circuit breakers used in the DC lines must be rated suitably. a. Sinusoidal current modulation with excellent dynamic response. b. Compact and weather proof housing. c. Direct use in the outdoors with outdoor housing. d. Comprehensive network management functions (including the LVRT and capability to inject reactive power to the grid). e. No load loss < 1% of rated power and maximum loss in sleep mode shall be less than 0.05%.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 103 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

f. Unit wise & integrated Data logging

a. Dedicated Prefab compartment required for Ethernet for networking. b. PCU shall have protection against over current, sync loss, over temperature, DC bus over voltage, cooling fan failure (if provided), short circuit, lightening, earth fault, surge voltage induced at output due to external source, power regulation in the event of thermal overloading, xxxi.

It shall have bus communication via interface for integration, remote control via telephone model or mini web server, integrated protection in the DC and three phase system, insulation monitoring of PV array with sequential fault location. Alternatively, the same can be provided through SCADA.

xxxii.

Ground fault detector which is essential for large PV generators in view of appreciable discharge current with respect to ground.

xxxiii.

The power conditioner must be entirely self-managing and stable in operation. A selfdiagnostic system check should occur on start up. Functions should include a test of key parameters on start up.

xxxiv.

Over voltage protection against atmospheric lightning discharge to the PV array is required.

xxxv.

The power conditioner must be entirely self-managing and stable in operation. A selfdiagnostic system check should occur on start up. Functions should include a test of key parameters on start up.

xxxvi.

Standards and Compliances: The Bidder also has to confirm the PCU specifications in the Bid. Table 5-3 Detailed Specifications of PCU Sr.

Particulars

1

PCU Mounting

As per the design

2

Nominal AC Output Power

≥ 1000 kW

3

Nominal AC Output Voltage

415 Volts +15%/-10% AC / 270 V / As per design

4

Maximum Input Voltage

1000 V /1500 V DC / As per Design

5

Wave Form

Pure Sine wave

6

DC voltage range, MPPT

As per design

7

Minimum Efficiency at 100% load > 98%, measured as per IEC 61683 The rated European efficiency (Euro standard for measuring efficiency. Eta Efficiency) and peak efficiency

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Details

(Sign and Seal of Bidder)

Page 104 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

* Inverter No Load / Full Load Loss Calculation must be submitted by the Bidder. 8

Output frequency

50 Hz +3% to - 5% Hz

9

Power Factor

0.85 lag- 0.85 lead

10

Max. THD at rated power

Less than 3 %

11

Ambient dry bulb temperature range

0 to 50˚ deg C

12

Humidity

15% to 95 % non- condensing

13

Enclosure

IP 21/ IP 65 (Indoor/ Outdoor rated) IEC-60068-2 (environmental)

14

Protection rating (as per IEC-60721- Classification of chemically active 3-3) substances: 3C2 Classification of chemically active substances: 3S2

15

Grid Specifications

IEC 61727, VDE 0126

16

Nominal Voltage & Frequency

415 Volts & 50 Hz

17

Voltage Tolerance

+ 10% and -10% or better than that

a. PCU shall confirm to IEC 60068-2 standards for Environmental Testing. b. All inverters shall be IEC 61000 compliant for electromagnetic compatibility, harmonics, etc. c. All inverters shall be safety rated as per IEC 62109 (1 &2), EN 50178 or equivalent DIN or UL standard. d. Each PCU shall be compliant with IEEE standard 929 – 200 or equivalent. The Bidder should select the inverter (Central / String) as per its own system design so as to optimize the power output. xxiii.

Display a. The PCU shall have local LCD (Liquid crystal display) and keypad for system control, monitoring instantaneous system data, event logs, data logs and changing set points. Control and read-out should be provided on an indicating panel integral to the Inverter. Display should be simple and self-explanatory. Display to show all the relevant parameter relating to PCU operational data and fault condition in form of front panel meters/ LEDs or two line LCD Display. b. PCU front panel shall be provided with display (LCD or equivalent) to monitor the following

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 105 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Instantaneous DC power input

DC input voltage

DC Current

Instantaneous active AC power output

Instantaneous reactive AC power output

AC voltage ( all the 3 phases and line)

AC current ( all the 3 phases and line)

Power Factor

kWh Produced during entire day

Total kWh produced during its life time

Thermal loading (percentage)

PCU must be provided with display and also the same has to be made available at the SCADA monitoring & controlling desk installed in Main Control Room through Universal Open Protocol of Communication. xxiv.

Documentary Requirements & Inspection. a.

The bill of materials associated with PCUs should be clearly indicated while delivering the equipment.

b.

The Contractor shall provide to GIPCL/GSECL data sheet containing detailed technical specifications of all the inverters and PCUs. Operation & Maintenance manual should be furnished by the Bidder before dispatch of PCUs.

Note:The Owner or its authorized representative reserves the right to inspect the PCUs/ Inverters at the manufacturer’s site prior to dispatch. 5.3.4 Cables and Wires i.

All cables and connectors for use for installation of solar field must be of solar grade which can withstand harsh environment conditions for 25 years and voltages as per latest IEC standards. (Note: IEC standards for DC cables for PV systems is under development, the cables of 600- 1800 volts DC for outdoor installations should comply with the draft EN 50618 for service life expectancy of 25 years). DC Cable of Positive & Negative must be colour coded as per draft EN50618.

ii.

Wires with sufficient ampacity and parameters shall be designed and used so that average voltage-drop at full power from the PV modules to inverter should be maximum2%

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 106 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

(including diode voltage drop). PV Modules should be connected with USE-2/RHW-2 cables array to junction box conductors and junction box to photovoltaic disconnector with the THHN/THWN-2 sunlight resistant with 90ºC wet rated insulation cable.Due consideration shall be made for the de-rating of the cables with respect to the laying pattern in buried trenches / on cable trays, while sizing the cables. The Contractor shall provide voltage drop calculations in excel sheet.

iii.

All cables shall be supplied in the single largest length to restrict the straight-through joints to the minimum number. Only terminal cable joints shall be accepted. No cable joint to join two cable ends shall be accepted. All wires used on the LT side shall conform to IS and should be of appropriate voltage grade. Copper conductor wires of reputed make shall be used. Armoured Aluminium cable connecting SMB and Inverter and also for lT applications are allowed.

iv.

All cables shall be armoured except Solar Cables. Solar cable shall be laid through MMS / DWC Conduits.

v.

OFC cable shall be laid in DWC conduits.

vi.

Ethernet cables shall be CAT-6.

vii.

All wires used for connecting the modules and array should conform to the NEC standards. Modules should be connected with USE-2/RHW-2 cables array to junction box conductors and junction box to photovoltaic disconnector with the THHN/THWN-2 sunlight resistant with 90ºC wet rated insulation cable.

viii.

All high voltage cables connecting the main junction box/string inverters to the transformers should be XLPE insulated grade conforming to IS 7098-Iand cables shall also conform to IEC 60189 for test and measuring the methods.

ix.

Irrespective of utilization voltage and current rating all type of power cables shall be minimum of 1100 V/1500V grade XLPE insulated conforming to IS 7098& IS 1554/ IS 694 for working voltage less than 150 V control cable shall be of minimum 500 V grade, the control and power cable has to be laid separately. All LT XLPE cables shall confirm to IS: 7098 Part I & II. All HT XLPE Cables (up to 33kV) Shall confirm IS: 7098 PART-3 & IEC -60287, IEC-60332 and the Contractor to submit technical data sheet, Voltage drop calculation, Power Loss Calculation and type test report for the approval of client / consultants.

x.

The cables shall be adequately insulated for the voltage required and shall be suitably colour coded for the required service. Bending radious for cables shall be as per manufacturer's recommendations and IS: 1255.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 107 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Table 5-4 Relevant Codes & Standards for Cable Sr.

Item

Relevant IS

Relevant IEC

1

Conductors of Insulated Cables

IS: 8130 - 1984

IEC: 228

2

Impulse tests on cables and their accessories

IEC: 230

3

Extruded solid dielectric-insulated power cables for rated voltage from 1 KV upto 30 KV.

IEC: 502

4

Test methods for insulations and sheaths of electric cables and chords.

IEC: 540

5

Test on cable over a sheath which has special protective functions and are applied by extrusion.

IEC: 229

6

Calculations of continuous current rating of cables (100% load factor).

IEC: 287

7

Cross-linked polyethylene insulated PVC sheathed cable for voltage from 3.3 KV upto 33 KV.

IS: 7098 (Part II& III)

8

PVC insulation & sheath of electrical cables.

IS: 5831 - 1984

9

Mild steel wires, formed wires and tapes for armouring of cables.

IS: 3975

10

Electrical test methods for electric cables partial discharge test.

11

Methods of test for cables.

12

Common test methods for insulating and sheathing materials of electric cables.

IEC: 811

13

Impulse test on cables & other accessories

IEC: 230

14

Cable termination for gas insulated switchgear.

IEC: 859

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

IEC: 885(2) 1987 (Part II) IS: 10810

(Sign and Seal of Bidder)

Page 108 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.3.5 Technical Specification of LT XLPE Cables General Constructional Features The medium voltage cables shall be supplied, laid, connected, tested and commissioned in accordance with the drawings, specifications, relevant Indian Standards specifications, manufacturer’s instructions. The cables shall be delivered at site in original drums with manufacturer’s name, size, and type, clearly written on the drums. A. Material: Medium voltage cable shall be XLPE insulated. PVC sheathed, aluminium or copper conductor, armoured conforming to IS: 7098 Part I. B. Type: The cables shall be circular, multi core, annealed copper or aluminium conductor, XLPE insulated and PVC sheathed, armoured. C. Conductor: Uncoated, annealed copper, of high conductivity upto 4 mm² size, the conductor shall be solid and above 4 mm², conductors shall be concentrically stranded as per IEC: 228. D. Insulation: XLPE rated 90° C. extruded insulation. E. Core Identification: Two core Three core Four core Single core

: : : :

Red and Black Red, Yellow and Blue Red, Yellow, Blue and Black Green cable with Yellow strips for earthing

Black shall always be used for neutral. F. Assembly: Two, three or four insulated conductors shall be laid up, filled with non-hygroscopic material and covered with an additional layer of thermoplastic material. G. Armour: Galvanised steel flat strip / round wires applied helically in single layers complete with covering the assembly of cores. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 109 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

For cable size upto 25 Sq. mm. : Armour of 1.4 mm dia G.I. round wire

For cable size above 25 Sq. mm. Armour of 4 mm wide 0.8 mm thick G.I strip

H. Sheath: The cable shall be rated extruded for XLPE 90 deg.c. Inner sheath shall be extruded type and shall be compatible with the insulation provided for the cables. Outer sheath shall be of an extruded type layer of suitable PVC material compatible with the specified ambient temp 50 deg. C and operating temperature of cables. The sheath shall be resistant to water, ultraviolet radiation, fungus, termite and rodent attacks. The colour of outer sheath shall be black. Sequential length marking required at every 1.0 meter interval on outer sheath shall be available. The contractor has to furnish resistance / reactance / capacitances of the cable in the technical datasheet. I. Rating: 1100 Volts or higher. 5.3.6 Technical Specification of HT XLPE Cables General Constructional Features A. Conductors: The conductor shall be of circular stranded Aluminium confirming to IS: 8130 & IEC: 228. It shall be clean, reasonably uniform in size & shape smooth & free from harmful defects. Any other form of conductor may also be accepted if in line with modern trends. B. Semi-Conductor Barrier Tape/Tapes: The semi-conducting barrier tape/tapes shall be provided over the conductors. C. Conductor Screen: The conductor screen shall consist of an extruded layer of thermosetting semi-conducting compound which shall be extruded simultaneously with the core insulation. D. Insulation: The insulation shall be super clean XLPE compound applied by extrusion and vulcanized to form a compact homogenous body. E. Insulation Screen: a. Each insulation have an insulation screen in two parts consisting of:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 110 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

b. A water barrier tape/Non-metallic semi-conducting swellable tape part and a metallic screen part. c. The non-metallic part shall be directly applied upon the insulation of each core and may consist of an impregnated but nylon/PVC tape or a similar approved material or, an extruded semi-conducting material extruded simultaneously with the conductor screen and insulation (triple extrusion). d. The semi-conductor shall be readily strippable and must not be bonded in such a manner that it has to be shaved or scraped to remove. e. The metallic part shall consist of a copper tape helical applied with a 30% overlap over the water barrier tape/blocking tape. A binder tape of copper shall be applied over the copper wire metallic screen.

F. Laying Up: a. The cores shall be identified on the non-metallic part of the insulation screen by legible printing on the length of each conductor or, by the inclusion of a marker tape. b. The cores shall be laid up with a right hand direction of lay. c. Binder tape/Moisture barrier: During layup, a suitable open spiral binder may be applied, at the manufacturer's discretion, before the application of an extruded inner covering. G. Fillers: Fillers shall be polypropylene. H. Inner Covering/Sheath: The inner covering shall be extruded over the laid up cores to form compact and circular bedding for the metallic layer. I. Metallic Layer: The metallic layer shall be galvanised steel wire. J. Outer Sheath: The tough outer sheath, black coloured best resisting PVC polyethylene compound type ST-2 as per IS: 5831 for the operating temperature of the cable shall be provided over the armour as specified in relevant standards by extrusion process. K. Cable Marking: a. Embossing on outer sheath: The following particulars shall be properly legible embossed on the cable sheath at the intervals of not exceeding one meter throughout the length of the cable. The cables with poor and illegible embossing shall be liable for rejection. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 111 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xi.

GIPCL/GSECL SPVPP

Voltage grade

Year of manufacture

Manufactures name

Successive Length

Size of cable

ISI mark

Packing and marking shall be as per clause No. 18 of IS 7098 (part I)/1988 amended up to date.

xii.

Cables inside the control room and in the switchyard shall be laid in Galvanized Cable Trays mounted on mild steel supports duly painted, in constructed trenches with RCC raft and brick sidewalls and provided with removable RCC covers.

xiii.

Cable terminations shall be made with suitable cable lugs & sockets etc, crimped properly and passed through brass compression type cable glands at the entry & exit point of the cubicles.

xiv.

All cable/wires shall be provided with Punched Aluminium tags only. The marking on tags shall be done with good quality letter and number ferrules of proper sizes so that the cables can be identified easily.

xv.

The wiring for modules interconnection shall be in the GI pipe /HDPE/ DWC Pipe of approved make.

xvi.

Data sheets of individual cable sizes (HT & LT) shall be submitted for approval by the Owner. Drum numbers and drum length details shall be submitted with each consignment.

xvii.

Cable end terminations and joint kits shall comply with the latest version of the relevant IS standard.

xviii.

The cable ends shall be terminated with adequate size copper/ Aluminum/ Bimetallic lugs and sockets etc, single/double compression cable glands. Cable glands shall be of robust construction capable of clamping cable and cable armor (for armored cables) firmly without injury to insulation. The metallic glands shall be earthed at min onelocation. Suitable lock type crimping lugs shall be used for cable end terminations. Where cables are raising from ground, suitable PVC pipe guarding shall be provided for cable raising with sealing of the guarding PVC pipe including a suitable clamp.

xix.

HT cable termination kits and straight through joints shall be selected as per the cable specifications. Installation shall be as per the instructions given in the manufacturer’s manual. Heat shrinkable type kits only shall be used for HT and LT cables.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 112 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xx.

Data sheets of the joints and kits shall be submitted for approval by GIPCL/GSECL.

5.3.7 Clamps and Connectors i.

The bus-support clamps, spacers, T-connectors and various equipment connectors shall be supplied as per the enclosed drawings. The material to be used for these items shall be generally as per the Table 5-5.

ii.

The materials shall be of the best workmanship, and all the sharp edges and corners shall be rounded off. The thickness of tinning, wherever applicable, shall be not less than 10 microns. The minimum thickness of pads made of copper shall be 10 mm and those made out of Aluminium/Aluminium Alloy, shall be 12 mm, unless otherwise indicated in the specifications.

iii.

All the clamps and connectors shall be designed to carry a continuous current not less than 125% of the rated current of the conductor (twin/single as the case may be)/equipment terminal to which these are to be connected. Temperature rise of the connector under the above condition shall not be more than 50% of the temperature of the main conductor/equipment terminal. Table 5-5 Clamps & Connectors Sr. 1. 2.

Application Bolted type connection For connection to ACSR/AAAC/

Aluminum Alloy conforming to

Aluminum terminal

designate A6 as per IS 617

For connection to copper terminals, 3.

with crimping facility to connect ACSR/AAAC jumper

4. 5.

iv.

Material

Electrolytic grade copper, forged and tinned

Crimping type connection For connection to ACSR/AAAC jumper

Electrolytic grade aluminum

All the fasteners (i.e. nut-bolts, washers, check-nuts, etc.) used in the clamps and connectors shall be of non-magnetic stainless steel. The straight bolts shall be fully threaded, and the Ubolts shall be threaded up to 30 mm from the ends. For connectors made out of

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 113 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Aluminium/Aluminium Alloy, the bolts shall be of 12 mm diameter, and for copper connectors the bolts shall be of 10 mm diameter.

v.

The clamps and connectors meant for ACSR and AAAC shall have the same crimping dimensions. It shall be possible to use the same clamp/connector for ACSR or AAAC, as would be required, without any modification/change at site.

vi.

The length of bolt shall be chosen such that after fully tightening the nut and check-nut, minimum 5 (five) threads of the bolt shall project outside the nut/check-nut.

vii.

As an alternative to the various types of clamps and connectors detailed under 2.0 above, the Contractors may offer connectors of Power Fired Wedge Pressure Technology (PFWPT). However, the same needs to be specified in the Bid.

viii.

Connectors of PFWPT type shall meet the general requirements for various connections/joints as indicated in the relevant drawings.

ix.

PFWPT type connectors shall comprise of: a.

Tapered `C' - shaped spring member

b.

Wedge for connecting solid/stranded conductor along with handle, suitable for connection between:

i.

Aluminium & Aluminium

Copper & Copper

Aluminium & Copper

Aluminium & Al. Alloy

Copper & Al. Alloy

Al. Alloy & Al. Alloy

Components of the PFWPT type connectors shall be made of Aluminium Alloy suitably heat-treated to ensure that the required Mechanical & Electrical parameters are in line with ANS 1 specification no. C 119.4-1991. The connectors shall have `self-cleaning' capability during application. The connector shall ensure stable and low contact resistance under varying load conditions and the thermal cycling effects.

ii.

The special tools and tackles required for installation of the PFWPT type connectors shall be identified in the offer. One set of these bolts and tackles shall be included in the scope of supply.

iii.

The Contractor shall furnish the following information in their bill of material:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 114 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

a.

Availability of the PGWT connectors indigenously.

b.

Unit rate of each item

c.

Not-withstanding anything stated above, the final decision regarding acceptance of the type of clamps and connectors (conventional/PFWPT type) shall rest with GIPCL/GSECL

5.3.8 Structural Steel Work i.

The structural steelwork required for termination incoming 66 kV line/ Cable, equipment supports, lighting masts and for shielding towers together with all foundation bolts shall be included by the Bidder in its scope of work. The steel work shall be fabricated from galvanized structural sections. The height of structures for incoming line shall be as per the design developed by the Bidder and drawings submitted.

ii.

The incoming line gantry shall be designed on the basis of ACSR conductor/Cable considered in the design and also considering that GETCO terminal tower will be located at a distance of not more than 100 meters from the incoming gantry at SPV power station switchyard. The Bidder shall take into account wind load, temperature variation etc. while designing the gantry structure. The column shall be provided with step bolts and anticlimbing devices.

iii.

The entire structural steel work shall conform to IS: 802. The Bidder shall furnish design calculations for approval by Owner before procuring the material.

iv.

The design of the switchyard towers, gantries and equipment structures shall also be designed in conformity with the standards followed by the Owner. Approval from the Owner also shall be obtained by the Bidder if required.

5.3.9 Hardware i.

Metal fittings of specified material for string hardware meant for power conductor and earth wire shall have excellent mechanical properties such as strength, toughness and high corrosion resistance. The suspension and tension clamps shall be made from aluminum alloy having high mechanical strength. Suspension and tension clamps offered shall be suitable for ACSR / AAAC conductor as per design.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 115 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

ii.

All hooks, eyes, pins, bolts, suspension clamps and other fittings for attaching insulators to the tower or to the power conductor shall be so designed as to reduce (to a minimum) the damage to the conductor, insulator or the fitting arising from conductor vibration.

iii.

All drop-forged parts shall be free-from flaws, cracks, or other defects and shall be smooth, close-grained and of true forms and dimensions. all machined surfaces shall be true, smooth and well-finished. The thickness of all structural steel of Switchyard shall be minimum 80 microns measured at all points of the structure member when measured. No averaging is allowed. The gap between base plate of structural members and concrete top of foundation shall be filled with GP-2 grouting material of reputed make. The material of all J-bolts shall be of 8.8 Class.

iv.

All ferrous parts of hardware shall be galvanized in accordance with IS 2629. The galvanization shall withstand four dips of 1-minute duration each in copper-sulphate solution as per the test procedure laid down in the relevant ISS.

v.

The threads in nuts and tapped holes shall be cut after galvanizing, and shall be welllubricated/greased. All other threads shall be cut before galvanizing.

vi.

Both the suspension and the tension hardware shall be of ball and socket type, and shall be with `R' and `W' type security clip of stainless steel or phosphor Bronze conforming to IS 2486. The tension clamps of both compression type and bolted type as shown in the relevant drawings shall be offered. Arcing horns shall be provided on the line side for both the suspension type and compression type hardware. a. Danger Plates

vii.

Size of each Danger Notice plates shall be 200 mm x 150 mm made of mild steel sheet and at least 2 mm thick, and vitreous enameled white on both sides and with inscription in signal red colors on front side as required. The inscriptions shall be in Gujarati and English.

viii. ix.

Fire Extinguishing System. The installation shall meet all applicable statutory requirements, safety regulations in terms of fire protection.

x.

Liquefied CO2 fire extinguisher shall be upright type of capacity 10 kg having IS: 2171. 7 IS: 10658 marked. The fire extinguisher shall be suitable for fighting fire of Oils, Solvents,

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 116 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Gases, Paints, Varnishes, Electrical Wiring, Live Machinery Fires, and All Flammable Liquid & Gas. Bidder shall provide portable fire extinguisher as given below: DCP Type (ABC type) (10 kg Cap) 1

xi.

CO2 Type Hand 9 kg 1

Foam Type Hand 9 kg 1

The minimum 1 no. of fire extinguishers shall be required for each inverter rooms and as per CEA and safety guidelines required numbers of fire extinguisher shall be kept at switchyard and control room. For outdoor installations type AB fire extinguishers can be used and for all indoor applications type ABC fire extinguishers shall be used.

xii.

Sand bucket should be wall mounted made from at least 24 SWG sheet with bracket fixing on wall conforming to IS 2546.

5.3.10 Lightning Protection for PV Array i.

The source of over voltage can be lightning or other atmospheric disturbance. Main aim of over voltage protection is to reduce the over voltage to a tolerable level before it reaches the PV or other sub-system components as per IS: 2309 – 1989 (Reaffirmed – 2005), Edition 3.1 (2006-01).

ii.

Necessary foundation / anchoring for holding the lightning conductor in position to be made after giving due consideration to shadow on PV array, maximum wind speed and maintenance requirement at site in future. Lightning arresters shall be equipped with lightning counters.

iii.

The lightning conductor shall be earthed through flats and connected to the earth mats as per applicable Indian Standards with earth pits. Minimum two earth pits shall be provided for each lightening arrestor. Each lightning conductor shall be fitted with individual earth pit as per required Standards including accessories, and providing masonry enclosure with cast iron cover plate having locking arrangement, watering pipe using charcoal or coke and salt as required as per provisions of IS & Earth Resistance of Lightening System must be less than one (1) Ohm. a. If necessary more numbers of lightning conductors may be provided. The Contractor is also free to provide franklin rod / Early Streamer type of lightning arrestors on the MMS structure designed in such a way not to cast shadow on the next raw of solar PV modules. The Contractor to submit necessary calculations based upon rolling sphere method for the Lightening protection system.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 117 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iv.

The Contractor shall submit the drawings and detailed specifications of the PV array lightning protection equipment to GIPCL/GSECL for approval before installation of system.

5.3.11 AC Network i.

AC converted by the inverter is transmitted through the appropriate cables from the Inverter to appropriately sized Inverter transformer. In case of more than one Inverter transformer in a block, RMU shall be provided. Each individual block shall be connected to HT panel at MCR through AC cable. RMU panel should consist of adequate size indoor AC bus/ cable, which can handle the current and the voltage safely as per the relevant, IS standards. RMU panel should be equipped with adequate protection relays, fuses, annunciations and remote operating and controlling facility from the Main Control Room. Relevant national & international codes to be follows :Table 5-6 Relevant National & International Code Sr.

ii.

Item

Relevant IS

Relevant IEC

1

Power transformer

IS 2026

2

Fittings & Accessories

IS 3639

3

Climate Proofing

IS 3202

IEC 354

4

Loading of Transformer

IS 6600

IEC 296

5

Oil

IS 335

IEC 137

6

Bushings

IS 20650

IEC 144

7

Degree of Protection

IS 2147

IEC 76

8

Testing, Tolerances on guaranteed Particulars

IS 2026

IEC 76

9

Buchholz Relay

IS 3637

10

Electrical Insulation

IS 1271

IEC 76

IEC 85

RMU panel or radial scheme through VCB panel is acceptable but RMU is to be used for connecting inverter room and main control room. It shall have circuit breaker of suitable rating for connection and disconnection of PCU from grid. The busbar shall connect the AC distribution board to the transformer. It shall have provision to measure bus voltage, current and power of the transformer. Outdoor inverter & RMU panel with IP65 or above are acceptable. Inverter station should be properly provided with canopy structure and working platform.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 118 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iii.

Bus-bars shall be of high conductivity Aluminium alloy or Copper of adequate size. The bus-bars shall be adequately supported by non-hygroscopic, non-combustible track resistant and high strength type polyester fibre glass moulded insulators. Separate supports shall be provided for each phase and neutral busbar. The bus-bars joints shall be provided with high tensile steel bolts, Belleville washers and nuts, so as to ensure good contacts at the joints. The bus-bars shall be colour coded as per IS 375.

iv.

The Bidder shall submit the detailed specifications of the AC bus and panel in the Bid.

v.

The RMU panel with thermal over current and earth fault releases. The incomer shall be selected one size higher than the required rating as per Type 2 selection chart. RMU shall be provided with metering facility i.e. ampere meter and volt meter irrespective of voltage presence indications.

vi.

Removable gland plates with gaskets shall be provided in the cable alleys for glanding the power and control cables. The distance between the gland plate and the incomer terminals shall not be less than 450 mm.

vii.

The Contractor should submit theoretical design calculations and detailed explanations along with drawings shall be provided and approved by the Owner. HV SUBSTATION BLOCK:

5.3.12 Step-Up Transformer i.

The Contractor shall provide the complete turnkey design, supply, erection, testing and commissioning of transformers and transformer substation to first step-up the output of the inverter to HV at the location of the inverter. Inverter Transformer must be protected with HV VCB Panel / RMU Capacity of each inverter block. Capacity of LCR (Inverter Block) shall not exceed more than 5 MW. Hence, total 75MW capacity of the solar plant with provision of rated 11kV or 33 kV HV Vacuum Circuit Breaker panel shall be connected upto 66 kV substation of the plant.

ii.

3 phase, Oil Filled, 11 or 33 kV, 50 Hz, Inverter Transformers of the selected inverter rating and associated Switchgear of approved make should be utilized as per IS 6600. Inverter transformers can be off-load tap change type. The transformers shall be suitable for outdoor installation in which the neutral can be kept floatedand they should be suitable for service under fluctuations in supply voltage up to plus 5% to minus 10% in step of 2.5% for inverter transformer.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 119 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iii.

Each 75 MW (AC) plant shall have minimum 2 nos. (50MVA & 25MVA) of 66 kV power transformer, For 50 MW capacity minimum capacity of transformer shall be 36/60 MVA of ONAF and for 25 MW capacity minimum capacity of transformer shall be 18/30 MVA of ONAF cooling for temperature rise of 55 Degree Celcius / 65 Degree Celcius as a temperature rise units..

iv.

Cumulative loss shall be as per IGBC / CBIP guidelines. All electrical equipment and installation shall confirm to the latest Indian Electricity Rules as regards safety, earthing and other essential provisions specified for installation and operation of electrical plants.

v.

Relevant national and international standards in this connection are mentioned in Table 5-7General Standards for Transformers.

vi.

All working parts, insofar as possible, are to be arranged for convenience of operation, inspection, lubrication and ease of replacement with minimum downtime. All parts of equipment or of duplicate equipment offered shall be interchangeable.

vii.

The quality of materials of construction and the workmanship of the finished products/ components shall be in accordance with the highest standard and practices adopted for the equipment covered by the specification.

IS: 2026 (Part 1 to 4)

Table 5-7General Standards for Transformers Specifications for Power Transformer

IS: 2099

Bushings for alternating voltage above 1000 V

IS: 3639

Fittings and accessories for power transformer

IEC: 60076 (Part 1 to 5)

Specifications for Power Transformer

IS: 9921 Part 1 to 5

Alternating currents disconnectors (isolators) and earthing switches rating, design, construction, tests etc.

IS: 2705 Part 1 to 4 & IEC: 185

Current transformer

IS: 3156 Part 1 to 4

Voltage Transformer

IS: 3070 part 1 to 3

Lightning arrestors

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 120 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

viii.

IS: 2544

Porcelain insulators for system above 1000 V

IS: 5350

Part III – post insulator units for systems greater than1000 V

IS: 5621

Hollow Insulators for use in electrical equipment

IS: 5556

Serrated lock washers – specification

IEC: 186

Voltage transformer

All items of equipment and materials shall be thoroughly cleaned and painted in accordance with relevant Indian Standards. The finish paint shall be done with two coats of epoxy based final paint of colour Shade RAL 7032 of IS:5 for indoor equipment

ix.

Any fitting or accessories which may not have been specifically mentioned in the specification but which are usual or necessary in the equipment of similar plant or for efficient working of the plant shall be deemed to be included in the contract and shall be provided by the Contractor without extra charges. All plant and apparatus shall be complete in all details whether such details are mentioned in the specifications or not.

x.

All equipment shall be designed for operation in tropical humid climate at the required capacity in an ambient air temperature of 50°C. Equipment shall be suitable for an ambient temperature of 50°C. Maximum relative humidity of 100% shall also be taken into consideration for design of equipment.

xi. xii.

The reference ambient temperatures for which the transformers are to be designed are as mentioned in Table 5-8. The rating and electrical characteristics of the Outdoor type inverter transformer (typical) shall be as mentioned in Table 5-8 Table 5-8 Reference Weather Conditions for Transformer Design Sr.

Particulars

Specifications

1.

Maximum ambient temperature

50 degree C

2.

Maximum daily average ambient temp Maximum yearly weighted average ambient temp Minimum ambient air temperature: (Cooling medium shall be Air) Climatic Conditions :

45 degree C

3. 4.

5.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

40 degree C Minus 5 degree C

(Sign and Seal of Bidder)

Page 121 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.1

Maximum relative humidity

100%

5.2

Varies from 30 to 50

5.3

Yearly average number of thunder storms Average no. of rainy days per annum

5.4

Fog

5.5 5.6

Number of months during which tropical monsoon conditions prevail Dust storms

The atmosphere is subject to fog for two month in winter 3 months

5.7

Average annual rainfall

60 cms

5.8

Maximum wind speed

180 kmph

60 days

occur at frequent intervals

5.3.13 Technical Data of Inverter Transformer 5.3.13.1 The rating and electrical characteristics of the outdoor type inverter transformer (typical) shall be as under: Table 5-9 Rating and electrical characteristics of Inverter Transformer Sr.

Particulars

Inverter Transformer (Outdoor type)

1

Continuous kVA ratings

As per design

2

Type

Oil immersed

3

Frequency

4

Type of cooling

5

No. of phases

6

Rating voltage H.V. side

7

Highest System voltage on H.V.

50 Hz Oil Natural Air Natural Three 11 / 33 kV 12 kV/ 36 kV

side 8

Rated voltage on L.V. side

9

Vector Group

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Output of solar inverter Dy5/ Dy11

(Sign and Seal of Bidder)

Page 122 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

10

11

Connections a) H.V. Winding

Delta

b) L.V. winding

Star

On load taps on H.V. Side (for H.V.

+ 5 to – 10.0 % (in steps of 2.5%)

Variation) 12

4%

Impedance voltage (%)as per IS 2026

13

Minimum Creepage distance

14

Transformer connections

31mm/ kV LV side – Bus Duct/ Busbar with weather proof enclosure, HV Side –Bushing with enclosure

5.3.14 Technical Data Sheet of 66/11 or 33kV Step UP Power Transformer Sr. 1

Particulars Type of transformer

66/11 or 33 kV Step UP Power Transformer ONAF cooled, Three phase, 66/11or 33KV Step Up Power Transformer, Double Limb wound, Core type for OUT DOOR application. Mounted on Rails with wheels.

2

Three phase type of windings for HV Interleaved type / Disc type with static end rings at both ends with uniformly insulated,

3

Three phase type of windings for LV Continuous disc type / layer type with uniformly insulated.

4

Vector Grouping

D-Y n 11 / YNyn0 (as per IS: 2026 part-IV) or as per Design

5

Type of insulation

Uniformly insulated as per IS: 2026 Part III

6

Winding Material

Electrolytic grade copper

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 123 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7

Winding Insulation

Class-A

8

System frequency

50Hz ± 3%

9

Rated Capacity

10

Rated Primary Voltage

11

Rated Secondary Voltage

12

Maximum

value

As per IS 6600 for Power Transformer

of

11kV or 33 kV 66 kV percentage

11.76% or As per IS without positive tolerance

Impedance at the (Normal working) principle tap position at 36 /60 MVA &/ or 18/30 MVA ONAF

Table 5-10 Rating and electrical characteristics of Step UP Power Transformer Non-cumulative over load capacity after the transformer has reached steady temperature on continuous operation at rated load i.e. At rated power) 110% for continuous, 125% for 15 minute, 140% for 5 min Tapings (On load Tap Changer) OLTC shall be of minimum 72 KV Voltage class and shall have maximum rated through current not less than 300 Amps at normal tap, short circuit withstand current not less than 8kA for 3 Seconds and shall be of High Speed Resistor type, housed in a separate tank outside the main tank.: Min.17 Taps in step of 1.25%. The maximum losses during ONAF condition to be considered for the evaluation and the same must be as per latest IS. Transformer Losses

:

As per IS

Insulating medium Transformer oil as per IS: 12463 Nitrogen Injection Fire Protection System (NIFPS): NIFPS to be provided for all power transformer rating more than 10 MVA. NIFP system shall be provided with automatic control for fire prevention and fire extinction. The system shall be tested by UL, FM, LPCB or national testing body of BIS accredited laboratory’s Test Report required. 5.3.15 Instrument Transformer (66 kV Switchyard) i.

The instrument transformers i.e. current and voltage transformers shall be single phase transformer units and shall be supplied with a common marshaling box for a set of three single phase units. The tank as well as top metallics shall be hot dip galvanized or painted Grey color as per RAL 9002.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 124 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

ii.

The instrument transformers shall be oil filled hermetically sealed units. The instrument transformers shall be provided with filling and drain plugs.

iii.

Polarity marks shall indelibly be marked on each instrument transformer and at the lead terminals at the associated terminal block. The insulators shall have cantilever strength of more than 500 kg.

iv.

Current Transformer, Voltage Transformer, Circuit Breaker and Relays should match –Local distribution GIPCL/GSECL requirements.

5.3.16 Current Transformer (66 kV Switchyard) i.

Current transformers may be either of the bushing type or wound type. The bushing types are normally accommodated within the transformer bushings and the wound types are invariably separately mounted. The location of the current transformer with respect to associated circuit breaker has an important bearing upon the protection scheme as well as layout of, substation. Current transformer class and ratio is determined by electrical protection, metering consideration.

ii.

Technical specifications – Current ratings, design, Temperature rise and testing etc. should be in accordance with IS: 2705 (part I to IV). Type and Rating a. The current transformer should be of outdoor/ indoor type, single phase, oil immersed, selfcooled and suitable for operation in 3 phase solidly grounded system. b.Each current transformer should have the following particulars under the site conditions for the system under design (typical values for 66 kV systems are given). c. General Parameters: 66 kV CT. d.Each current transformer should have the following particulars under the site conditions for the system under design (typical values for 66 kV system are given). Table 5-11 General parameters for 66 kV CT Sr.

Particulars

1

Highest system Voltage (Um)

2

Rated frequency

3

System Neutral Earthing

4

Installation

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Details 72 kV rms 50 Hz Effective earthed Outdoor/indoor(IP 65)

(Sign and Seal of Bidder)

Page 125 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5

Rated short time thermal current 25 kA for 3 sec or appropriate thermal current as per design calculations

6

Rated dynamic current

7

Rated min power frequency withstand voltage (rms value)

140 kV

8

Rated lightning impulse withstand voltage (peak value)

340 kV

10

Minimum Creepage distance

11

Temperature rise

As per -IS 2705/1992

12

Type of insulation

Class A

13

Number of cores

For Transformer : Three (3) with One (1) protection core and One (1) metering core (1) Diff. Protection of Transformer

63 kA (Peak) appropriate dynamic current as per design calculations

31mm/kV

For ABT Meter Line Side : Three (3) with One (1) protection core and One (2) ABT metering core Main & Check 14

CT secondary current

Protection cores – 1 Amp. Metering Core – 1 Amp (With Highest Accuracy Class)

15

Number of terminals in marshalling box

16

CT ratio & Rated VA Burden, short time thermal rating ,class of accuracy

All terminals of control circuits wired up to marshalling box plus 20 terminals spare Minimum burden required (As per GETCO requirement) : 1. Metering core – 5VA min. 2. Protection core – 10VA min.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 126 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.3.17 General Parameters of 66 kV VT

The Bidder has to furnish the specifications of 66 kV VT with the Bid. Table 5-12 General parameters for 66 kV VT Sr. 1 2 3 4 5 6 7

8 9 10 11

12

13 14

Particulars Highest system voltage (Um) System neutral earthing Installation System fault level Rated min power frequency withstand voltage (rms value) Rated lightning impulse withstand voltage (peak value) Standard reference range of frequencies for which the accuracy are valid Rated voltage factor Class of Accuracy Minimum Creepage distance Stray capacitance and stray conductance of LV terminal over entire carrier frequency range One Minute Power frequency Withstand voltage for secondary winding Temp. rise over an ambient temp. of 50 deg. C Number of terminals in control spare.

15 16

Rated total thermal burden Number of cores

17

Rated Output, insulation level, transformation ratio, rated voltage factor

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Details 72 kV effective earthed Outdoor (IP 65) Appropriate 140 kV 340 kV 96% to 102% for protection and 99% to 101% for measurement 1.2 continuous & 1.9 for 30 sec 0.5 / 3P, IS3156/1992 31 mm/kV As per IEC:358

3 kV rms

As per IS 3156/1992 All terminals of control circuits wired Cabinet up to marshalling box plus 10 terminals 300 VA min. 2 (two) – 1 for protection and one for metering with 0.5 class accuracy. Should be provided by the Contractor.

(Sign and Seal of Bidder)

Page 127 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.3.18 Circuit Breaker (66 kV) i.

The circuit breakers shall be capable of rapid and smooth interruption of currents under all conditions completely suppressing all undesirable phenomena even under the most severe and persistent short circuit conditions or when interrupting small currents or leading or lagging reactive currents. The circuit breakers shall be ‘Restrike-Free’ under all operating conditions. The details of any device incorporated to limit or control the rate of rise of restriking voltage across, the circuit breaker contacts shall be stated. The over voltage across, the circuit breaker contacts shall be stated. The over voltage caused by circuit breaker while switching inductive or capacitive loads shall not exceed 2.5 times the highest phase to neutral voltage. The actual make and break times for the circuit breakers throughout the ranges of their operating duties shall be stated in the offer and guaranteed.

ii.

The arc quenching chambers shall have devices to ensure almost uniform distribution of voltage across the interrupters.

iii.

Appropriate & adequate Capacity AC& DC power supply shall be provided as per the IEC 60898 / IEC 62271 – 100 or equivalent Indian Standards for control circuit and protection relay circuit, fuses, annunciations and remote operating and controlling facility from the Main Control Room.

iv.

Circuit breaker shall be C2/Ml class under all duty conditions and shall be capable of performing their duties without opening resistor. The circuit breaker shall meet the duty requirement of any type of fault or fault location and shall be suitable for line charging and dropping when used on 6 kV effectively grounded or ungrounded systems and perform make and break operations as per the stipulated duty cycles satisfactorily.

v.

The circuit breaker shall be capable for breaking the steady & transient magnetizing current corresponding to 66 kV transformers. It shall also be capable of breaking line charging currents as per IEC- 62271-100 with a voltage factor of 1.4.

vi.

The rated transient recovery voltage for terminal fault and short line faults shall be as per IEC: 62271-100.

vii.

The Bidder shall indicate in the Bid, the noise level of breaker at distance of 50 to 150 m from base of the breaker.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 128 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

viii.

The Bidder may note that total break time of the breaker shall not be exceeded under any duty conditions specified such as with the combined variation of the trip coil voltage, pneumatic pressure etc. While furnishing the proof of the total break time of complete circuit breaker, the Bidder may specifically bring out the effect of non-simultaneity between same pole and poles and show how it is covered in the guaranteed total break time.

ix.

While furnishing particulars regarding the D.C. component of the circuit breaker, the Bidder shall note that IEC-62271-100 requires that this value should correspond to the guaranteed minimum opening time under any condition of operation.

x.

The critical current which gives the longest arc duration at lock out pressure of extinguishing medium and the duration shall be indicated.

xi.

All the duty requirements specified above shall be provided with the support of adequate test reports.

xii.

Circuit breaker shall be SF6 with electrically spring charged mechanism. The operating mechanism shall be anti-pumping and trip free (as per IEC definition) electrically under every method of closing. The mechanism of the breaker shall be such that the position of the breaker is maintained even after the leakage of operating media and / or gas. The circuit breaker shall be able to perform the duty cycle without any interruption.

xiii.

Electrical tripping shall be performed by shunt trip coil. Provision shall also be made for local electrical control. 'Local / remote' selector switch and close & trip push buttons shall be provided in the breaker central control cabinet. Remote located push buttons and indicating lamps shall also be provided. The SF6 coil DC supply through appropriately rated battery bank and charger to be supplied by the Contractor.

xiv.

Operating mechanism and all accessories shall be in local control cabinet. A central control cabinet for the three poles of the breaker shall be provided along with supply of necessary tubing, cables, etc.

xv.

Mounting and supporting structure for Circuit Breaker. The circuit breakers should be selfsupporting type. However, if necessary for the purpose of minimum ground clearance the circuit breakers should be mounted on raised steel structures which should be included in the scope of supply of circuit breaker.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 129 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xvi.

Following information and data for design of foundations from the supplier of the circuit breaker be obtained. a.

Dead weight per pole for complete circuit breaker

b.

Static bending moments above the feet of each pole and for complete circuit breaker.

c.

Static shear force at the foot of each pole and for complete circuit breaker

d.

Maximum height of the steel supporting structure

e.

Maximum diameter of the pole

f.

Maximum horizontal force acting at upper terminal of each pole due to impact of closing/opening of the circuit breaker

g.

Max. Impact loading in terms of equivalent static load both compression and upward due to opening/closing of the breakers. It shall be clearly stated whether these forces shall act simultaneously or at different timing.

h.

No. of steel supporting columns provided for mounting the equipment.

i.

The above data should represent static reactions for the worst windage or operation conditions. Circuit breakers whether of self-supporting type or on raised steel structure should ensure minimum sectional clearance (say 3500 mm for 66 kV)

j.

Necessary connecting materials such as clamps, bolts, nuts, washers etc. and fixing bolts for mounting the equipment on the supporting structures wherever required should be obtained from the circuit breaker supplier.

xvii.

Applicable Standards: The materials shall conform in all respects to the relevant Indian Standard Specifications/ IEC Standards, with latest amendments indicated below in Table 5-. Table 5-13 Applicable Standards for Circuit Breakers Indian Standard

ISS-13118/1991 ISS-2705/1992 ISS-2099/1986

International & Internationally recognized standard General requirements for Circuit breakers IEC 62271-100for voltage above 1000 V 1/2001 Current Transformers Bushings for alternating voltages above 1000 V

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Title

(Sign and Seal of Bidder)

Page 130 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

ISS-2633/1964 ISS-3231/1986 ISS-1248/1983 ISS-335/1983 ISS-2147/1962

xviii.

Methods of testing uniformity of coating of zinc coated articles Electrical relays for power system protection Specification for Ammeters & Voltmeters New insulating oils Electrical Clearances IEC 71 (For oils in CTs) Degree of protection provided by enclosures for low voltage switchgear & control gear

General Parameters of Circuit Breaker:General parameters: Outdoor/ Indoor Vacuum type Circuit Breaker. Table 5-14 General Parameters for 66 kV Circuit Breakers Sr.

Particulars

Details

1

Type of circuit breaker

SF6 type

2

Highest System Voltage

72 kV

3

Rated operating voltage

66 kV

4

Rated frequency

50 Hz (+3% to -5%)

5

Number of poles

Three (3)

6

Rated/minimum power frequency Withstand voltage

140 kV

7

Rated lightning impulse Withstand voltage

340 kV

8

Minimum Creepage distance

9

Rated operating duty cycle

10

Rated line charging breaking

11

Reclosing

12

Maximum fault level

13

Auxiliary contacts

14

Noise level

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

31 mm/kV 0 - 0.3 sec. - CO – 3 min. – CO As per IEC Single and three phase high speed auto reclosing 25 kA (rms) for 3 sec. As required plus 6NO and 6NC contacts per pole as spare. Maximum 140dB at 50m distance from base of circuit breaker

(Sign and Seal of Bidder)

Page 131 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Seismic acceleration

15

xix.

0.4g horizontal

General Parameters of SF6 Insulated Ring Main Unit (RMU): Table 5-15 General Parameters for SF6 Type RMU Sr.

Particulars

Details

1

Type of Ring Main Unit

Metal enclosed, compact module, panel type, IEC 62271200. Transformer Breaker must be VCB.

2

Highest System Voltage

11/33 kV

3

Rated operating voltage

12/36 kV

4

Rated frequency

50 Hz (+3% to -5%)

5

Number of poles

Three (3)

6

Rated / minimum power frequency Withstand voltage

28/70kV

7

Rated lightning impulse Withstand voltage

170 kV

8

Rated Current Busbar

9.

Insulation Gas

10

Minimum Creepage distance

11

Rated operating duty cycle

12

Rated line charging breaking

13

Reclosing

14

Maximum fault level

15

Rated Making Capacity

52 kA

16

Rated Breaking Capacity

21 kA

17

Auxiliary contacts

18

Noise level

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

630A SF6 31mm/kV 0 - 0.3 sec. - CO – 3 min. – CO As per IEC Single and three phase high speed auto reclosing 21 kA (rms) for 1 sec. Or appropriate as per design

As required plus 6NO and 6NC contacts per pole as spare. Maximum 140dB at 50m distance from base of circuit breaker (Sign and Seal of Bidder)

Page 132 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xx.

Circuit Breaker protection against 

Over Current

Earth fault

Under voltage & over voltage protection

Under frequency & over frequency

SF6 gas pressure low (where applicable)

DC supply failure

5.3.19 Protective Relays i.

The Solar PV system and the associated power evacuation system interconnections should be protected as per IEC 61727 Ed.2, norms. Over current relays, reverse power relays, differential protection relays and earth fault relays have to be essentially provided. All relay should be numerical type & should be remote operating and controlling facility from the control room.

ii.

The numerical relays shall have RS 485 port for communication.

iii.

The operating voltage of the relays shall be 110 V DC/220 V DC as per battery bank rating.

iv.

Detailed Design calculations shall be provided on fault power computations and the philosophy of protective relaying with respect to short circuit kA calculations. Design, drawing and model of protection relay shall be approved by the Owner /Electricity Authority ( GETCO).

5.3.20 Earthing for PV Array i.

The photovoltaic modules, BOS and other components of power plant requires adequate earthing for protecting against any serious faults as guided by IEC 60364.

ii.

The earthing system shall be designed with consideration of the earth resistivity of the project area. The earth resistivity values shall be measured prior to designing the earthing system. Unless otherwise specified, earthing system shall be in accordance with IS: 3043 and IEEE 80, Indian Electricity Rules, Codes of practice and regulations existing in the location where the system is being installed.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 133 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iii.

The permissible system fault power level at all the voltage shall be kept in consideration while designing the earthing system. Each array structure of the PV yard, LT power system, earthing grid for switchyard ,all electrical equipment ,control room ,PCU, All junction boxes, ACDB& DCDB ,all motors and pumps etc .shall be grounded properly as per IS 3043 - 1987. All metal casing / shielding of the plant shall be thoroughly grounded in accordance with Indian electricity act / IE Rules.

iv.

The earthing for array and LT power system shall be made of 3 meter long 16 mm2Copperrod with chemical compound filled, double walled earthing electrodes including accessories, and providing masonry/ precast enclosure with cast iron cover plate/ Precast, chemical compound mix as required as per provisions of IS: 3043.

v.

Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance.

vi.

Each string/ array and MMS of the plant shall be grounded properly. The array structures are to be connected to earth pits as per IS standards. Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance.

vii.

The complete earthing system shall be mechanically & electrically connected to provide independent return to earth.

viii. ix.

For each earth pit, a necessary test point shall be provided. In compliance to Rule 11 and 61 of Indian Electricity Rules, 1956 (as amended up to date), all non-current carrying metal parts shall be earthed with two separate and distinct earth continuity conductors to an efficient earth electrode.

x.

The Contractor should submit the earthing system design calculations along with the system layout for the Owner’s approval prior to the installation of the system

xi.

Unless otherwise specified, the earthing system primary and secondary grid conductors, equipment connections shall be constructed with galvanized iron flat. However the earthing of transformer neutrals, plc and inverter terminals and electronic earthing shall be provided using copper earthing conductor only.

xii.

Earthing Mesh is to prepared and installed in entire power plant.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 134 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.3.21 Lightening Protection for PV Plant & Earthing

i. The source of over voltage can be lightning or other atmospheric disturbance. Main aim of over voltage protection is to reduce the over voltage to a tolerable level before it reaches the PV or other sub-system components as per IEC 60099 / IS: 2309 – 1989 (Reaffirmed – 2005), Edition 3.1 (2006-01). Lightening Protection System required for Solar PV Plant, Inverter Room, and Substation Structure & Control Room within the EPC scope of work. The intent of specification can be conventional as per IS : 2309 or can be Early Streamer Emission Type depending upon Area, Protected Equipment & Technical feasibility.Necessary concrete foundation for holding the lightning conductor in position to be made after giving due consideration to shadow on PV array, maximum wind speed and maintenance requirement at site in future. We recommended going with Early Stream Emission Air Terminal Technology as per NFC 17-102 / IEC 62305-2. Level of Protection must be defining as per Rolling Sphere Method LPL-I, LPL-II, LPL-III & LPL-IV where the radius shall be of 20mtr, 30mtr, 45mtr & 60mtr respectively. ii. Rp(h) : Protection radius at a given height (h) Rp(h) = √ 2rh - h2 + Δ(2r + Δ) (for h ≥ 5 m) For h < 5 m, refer to the table below h : Height of the OPR tip above the surface(s) to be protected r(m) : Standardized striking distance ∆(m) = 106 .ΔT (OPR efficiency)

ii.

The lightning conductor shall be earthed through flats and connected to the earth mats as per applicable Indian Standards with earth pits. Each lightning conductor shall be fitted with individual LA counter and earth pit as per required Standards including accessories, and providing masonry enclosure with cast iron cover plate having locking arrangement, chemical compound as per provisions of IS.

iii.

If necessary more numbers of lightning conductors may be provided as per design calculation

iv.

The Contractor shall submit the drawings and detailed specifications of the PV array lightning protection equipment.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 135 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

v.

The design, manufacture, inspection, testing and performance of Lightning Arrester shall comply with all currently applicable statutes, safety codes, provision of latest Indian Electricity Act, Indian Electricity Rules and Regulations of Statutory Authorities.

vi.

Contractor shall provide dedicated two earth pits for Lightening Arrestor as per relevant IS standard.

5.3.22 Isolators cum Earthing Switches, Contacts, Insulators, Busbars i.

This specification covers design, manufacture, testing and supply of. Manually operated 66 KV, 800 Amps Upright mounting type with manually operated with earth switch Isolators. The Isolators and Isolator-cum-Earthing Switched shall comply with the requirements of the IS: 9921 and IEC: 129 (latest edition) except specified herein. The Insulators shall comply with the requirements of IS : 2544 and IEC : 168-1988 (latest edition) for 66 kV pole mounted structure wherever required. 66 kV pole mounted structure would be supplied, installed and commissioned by the Contractor wherever required.

ii.

The isolator shall be of the manual operated type with earthing switches and shall complete with all parts and accessories including insulator operating rods, mounting attachments, necessary for their efficient operation. The equipment shall confirm in all respect to high standards of engineering Equipment shall capable of performing in continuous commercial operation up to the suppliers guarantee in a manner acceptable to the client, The equipment offered shall be complete with all components necessary for its effective and trouble free operation along with associated equipments, interlock, protection schemes, etc. Such components shall be deemed to be within the scope of the Contractor's supply irrespective of whether those are specifically brought out in this specification or not. All similar parts particularly removable ones shall be interchangeable.

iii.

Each pole shall have three Pedestal type of Insulator’s stacks. Necessary arrangements shall be provided for proper alignment of the contacts. Ganged operated links shall be so designed that all phases shall make and break simultaneously.The design of Isolators and Isolatorcum-Earthing Switches shall be provided for positive control of blades in all positions with minimum mechanical stress on the Insulators. Fixed guides shall be so provided that proper setting of contacts shall be obtained, when a blade is out of alignment even by 25mm in either direction. All movable parts which may be in current path shall be shunted by flexible copper

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 136 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

conductor of adequate cross-section and capacity, which shall be furnished under bill of material.

Service Condition: The 66 kV triple pole air break isolators are intended to be used primarily for sectionalizing 66 kV UG cable portion of the line with 66 kV overhead portion of the line. Isolator shall confirm IS: 9921(Part 1 to 4) & IEC 600 - 129 "alternating current disconnects (Isolators) and earthing switches", and IS 9921 (Part-I to IV) "Specification for alternating current disconnects (isolators) and earthing switches for voltages above 1000V” a. The moving & fixed contacts shall be made of hard drawn electrolytic grade copper strips and shall be heavy duty self- aligning & high pressure type preferably which applies pressure to the contact surfaces after the blades are fully closed and release the pressure before they start to open. High pressure type contacts shall wipe the contact surfaces, while opening and closing. The contacts shall be so designed that wiping, action shall not cause securing or abrasion on the contact surfaces. The wiping action shall be sufficient to remove oxide film, formed during the operation of the switches. The pressure shall be developed by rotation of the entire blade. b. The temperature rise of contacts due to the flow of rated short circuit current for a period of 3 seconds shall not cause any annealing or welding of contacts. c. The moving contacts, if provided, shall close first and open last so that no damage is caused due to arcing whatever to the main contacts. The Successful Bidder shall give full details of such contacts with necessary drawings. d. The arcing contacts, if provided shall close first and open last so that no damage is caused due to arcing whatever to the main contacts. The Contractor shall give full details of such contacts with necessary drawings. e. The female contact and its tensioning by spring shall be such that there will, always, be a positive contact with adequate pressure to give enough contact surface for the passing of current. The springs provided should not go out of alignment or get entangled with the male contact during operation. The details of springs shall be furnished on the G.A. drawing.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 137 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

INSULATORS: The isolator shall be provided with solid core insulators.

i.

These shall be of stacking type to be used. The dimensions and other parameters unless otherwise specified shall generally conform to IS - 5350-Part-11 & IEC 273.

ii.

The cylindrical type post insulators shall be of solid core type. Insulators of similar type shall be interchangeable. The mechanical strength class for outdoor cylindrical post insulators shall be of strength class 6, corresponding mechanical strength in tension, compression and torsional shall be as per IS : 53550 Part - II. When operated at maximum system voltage, there shall be no electrical discharge. Shielding rings, if necessary shall be provided.

iii.

The parameters of the insulators required shall conform to IS : 0350 - Part - II - 1973 or IEC 273.

iv.

The cylindrical post insulators shall consist of single unit only.

v.

The insulator shall be provided with a completely galvanized steel base designed for mounting on the support. The base and mounting arrangement shall be such that the insulator shall be rigid and self-supporting and no guying or cross bracing between phase shall be necessary.

vi.

Porcelain of the insulator: a. The porcelain used for the manufacture of the insulators shall be homogenous, free from laminations and other flaws or imperfections that might effect the mechanical or dielectric quality and shall be thorough vitrified, tough and impervious to moisture. The glazing of the porcelain shall be uniform brown colour, with a smooth surface arranged to shade away rain water and free from blisters, burns and other similar defects. Insulators shall be interchangeable. b. The porcelain and metal parts shall be assembled in such a manner and with such materials that any differential thermal expansion between the metal and porcelain parts throughout the operating temperature range will not loosen the parts or electrical strength or rigidity. The assembly shall not have excessive concentration of electrical stress in any section or across leakage surfaces. The cement used shall not give rise to chemical reaction with metal fittings. The insulator shall be suitable for water washing by rains or artificial means in service conditions. Further the insulators to be supplied shall be of high- quality and should not result in mismatch and misalignment of stacks during erection and operation. c. Each cap shall be of a high grade cast iron or malleable steel casting or steel forging. Cap and base insulators shall be interchangeable with each other. The insulator shall conform to

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 138 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

the requirement of the latest edition of IS: 2544,or any other equivalent standard. The Bidder should furnish the characteristics of insulators in the Bid.

Busbars i.

The outdoor bus-bars and equipment connections shall be with ACSR conductor (Panther /suitable size as per design).

ii.

The bus-bars and the connection jumpers shall be supported on post insulators wherever required.

iii.

The ACSR bus bars are an underground system of wires strung between two supporting structures and supported by strain type insulators. The stringing tension may be limited to 500-900 kg. depending upon the size of the conductor used. These types of bus bars are suitable for earthquake prone areas.

iv.

Bus bar Material – The materials in common use for bus bars and connections of the strain type are ACSR conductor.

v.

Since aluminum oxides rapidly great care is necessary in making connections. In the case of long spans expansion joints should be provided to avoid strain on the supporting insulators due to thermal expansion or contraction of pipe.

vi.

The bus bar sizes should meet the electrical and mechanical requirements of the specific application for which they are chosen.

vii.

The isolator shall be provided with padlocking device to permit locking of the isolator in both fully open and fully closed positions.

5.3.23 Control & Relay Panel Specifications i.

The control & relay panel shall be free standing, simplex type, floor mounting type, fabricated from 2 mm thick MS sheet for main enclosure and 1.6 mm thick MS sheet for internals and partitions. The main enclosure shall be mounted on a base frame fabricated out of 100x50 ISMC mild steel section.

ii.

The enclosure external finish color shade shall be decided by the Owner, The internal surface shall have a glossy white finish all over.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 139 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iii.

The control & relay panel shall contain the following metering and protection devices: 

Metering, Indications & Controls

Ammeter – 0 – …….. A

Ammeter selector switch

Voltmeter – 0 – 12/36 kV

Voltmeter selector switch

Load manager to display the following parameters : MW, MVA, MVArh, MVAr Cos Ø, Hz,

Indication lamps for R, Y, B phases, Breaker ‘ON’ (R), Breaker ‘OFF’ (G), Breaker ‘TRIP’ (A), Spring charged (W), Trip Circuit Healthy (B)

TNC switch, spring return to neutral position shall be provided for circuit breaker operation.

Local / Remote selection switch for circuit breaker operation

Semaphore indicators (LED type) for CB and Isolator ‘Open’ & ‘Close’ positions

Mimic diagram for the 66 kV systems with aluminum strips and ‘ON’ ‘OFF’ indications for isolators

5.3.24 Low Voltage Switchgear i.

This specification is for the 415V TP&N Power Control Centre (PCC).

ii.

The PCC shall be rated for the maximum output of the supply transformer feeding the system.

iii.

The short circuit withstand rating (1 sec) at rated voltage of the switchgear shall be minimum of 20 kA (rms) and corresponding dynamic rating shall be 50 kA (peak).

iv.

The configuration of the PCCs shall be as per the Single Line Diagram of the system.

5.3.25 Execution i. Single front / compartmentalized, modular design, degree of protection IP52 with provision of extension on both sides. ii. Incomer feeders: mains incomer - Electrically operated draw out type Air Circuit Breakers (ACBs). iii. Outgoing feeders : Electrically operated draw out type Air Circuit Breakers (ACBs) / Moulded Case Circuit Breakers (MCCBs)

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 140 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iv. The color finish shade of switchgear enclosure for interior shall be glossy white & for exterior it shall be light grey, semi glossy shade 631 of IS: 5. If a different exterior shade is desired by the PURCHASER, the same shall be intimated to the supplier. v. The PCC shall be fabricated out of CRGO sheet steel; 2 mm thick for the outer shall allround. The internal walls and separators shall be of 1.6 mm thick CRGO sheet steel. vi. The gland plates shall be 3 mm thick.

5.3.26 Control & Relay Panel Specifications for 415 V TP&N Power Control Centre (PCC) i. This specification is for the 415V TP&N Power Control Centre (PCC). ii. The PCC shall be rated for the maximum output of the supply transformer feeding the system. The short circuit withstand rating (1 sec) at rated voltage of the switchgear shall be minimum of 20 kA (rms) and corresponding dynamic rating shall be 50 kA (peak) iii. The configuration of the PCCs shall be as per the Single Line Diagram of the system. Execution Power Control Centres (Construction) a. Single front / compartmentalized, modular design, degree of protection IP52 with provision of extension on both sides. b. Incomer feeders: mains incomer - Electrically operated draw out type Air Circuit Breakers (ACBs). c. Outgoing feeders : Electrically operated draw out type Air Circuit Breakers (ACBs) / Moulded Case Circuit Breakers (MCCBs) d. The colour finish shade of switchgear enclosure for interior shall be glossy white & for exterior it shall be light grey, RAL 7032 of IS: 5. If a different exterior shade is desired by the PURCHASER, the same shall be intimated to the supplier. e. The PCC shall be fabricated out of CRGO sheet steel; 2 mm thick for the outer shall all-round. The internal walls and separators shall be of 1.6 mm thick CRGO sheet steel f. The gland plates shall be 3 mm thick Control Circuit a. Control supply for breaker closing / tripping - 110V DC b. Air Circuit Breaker spring charge motor – 240 V AC, 1 phase GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 141 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

c. Moulded Case Circuit Breakers – 240 V AC, 1 phase d. Indications, annunciation – 110V DC e. Space heater, sockets, etc. – 240 V AC, 1 phase

Busbar and Cable Cavity a. The material for main bus bars and tap off bus bars shall be electrolytic grade aluminum with HR PVC sleeved insulation b. Bus bars shall be suitable for short circuit rating and current suitable for all connected load. c. Bottom cable entry for incoming and outgoing cables d. A suitable gland plate shall be supplied for termination of power, control and instrumentation cables. e. Whenever feeders are housed in multi-tier configuration, these tiers shall be segregated by sheet metal barriers 5.3.27 Control Room Electrical Wiring i.

Electrification of building shall be carried out as per IS 732-1989, IS 46481968 and other relevant standards. Suitable AC Distribution Board should be designed to Supply AC power in Control room.

ii.

Control room AC distribution Board theoretical design, calculations and detailed explanations along with drawing shall be provided and approved by GIPCL/GSECL.

5.3.28 Auxiliary Power Supply i.

The Contractor shall install a separate minimum100 kVA, 11 kV / 415 V step down transformer to supply power for internal equipment such as power for control equipment, area lighting, water pumps, oil filtration and conference room fixtures, control room lighting and air-condition, etc.

ii.

This auxiliary power should be utilized directly from the grid through a separate meter and should not interfere with accounting of solar electricity fed into the grid.

5.3.29 DC Battery & Charger i.

Adequate capacity DC battery Bank should be provided for emergency control supply of inverters, control / protection system & emergency lighting. A appropriate

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 142 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

capacity battery charger with relevant IS/IEC standards & protection and automatic change over system should be provided to charge the battery bank along with relay circuit, fuses, annunciations and remote operating and controlling facility from the Main Control Room.

ii.

A DC power supply Distribution panel/board should be supplied along with the Charger as per relevant IS standards. Control room DC Battery Bank & DC supply system theoretical design, calculations and detailed explanations along with drawing shall be provided and approved by GIPCL / GSECL / GETCO.

iii.

iv.

All DC Batteries the batteries shall have the following specifications

a.

Type

: Tubular Lead Acid type,

b.

Rating

:

110 V D.C., Minimum 80 Ah at 8 Hour rate of discharge

c.

Standard

:

IS 1651 – 1979 ; performance as per IS 8702

d.

Container

:

Plastic Resin, ABS

e.

Terminal Post

:

Designed suitably to connections

accommodate

external

bolted

The battery shall be provided with epoxy paint coated exhaust fan for removal of gasses released from the battery cells.

v.

The data sheet for the battery shall be submitted along with the Bid for evaluation.

5.3.30 Earthing i.

Earthing bus bar shall be terminated at both ends of the switchgear to suit the connections to outside earthing conductor. All components inside the module are required to be earthed individually and are to be looped and connected to the horizontal earth bus. Terminals a. CT circuit - Isolating link type terminals with shorting facility b. PT circuit – clip on type terminals c. Spare contacts shall be wired up to terminal block. 10% spare terminals shall be provided for each module Specific Requirements

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 143 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

1.

All ACBs shall be 4 pole, electrically operated, draw-out type, with closing coil, spring charge motor, trip coil, TNC switch for close and trip, manual closing and tripping push buttons, door I/L, test and service position micro switches, emergency P.B., safety shutters, etc. The circuit breaker shall be provided with anti-pumping feature.

2.

ACBs shall be complete with microprocessor release and shall be provided with over current, short circuit and earth fault protections.

3.

Minimum10% spare feeders of each rating shall be provided in the switchgear. No spare feeder is required for 11kV VCB panel and SMB.

4.

All current transformers shall have 5/1A secondary and all meters shall be suitable for 5/1 A operation.

5.

All indicating lamps shall be of LED cluster type. ACB feeders shall be provided with ON, OFF, AUTOTRIP, SPRING CHARGED, TEST, SERVICE, TRIP CIRCUIT HEALTHY indications

6.

All indicating instruments shall be flush mounting, Digital, 96 sq.mm size.

7.

Window annunciator with hooter and accept, test, reset button shall be provided. Necessary auxiliary relays for contact multiplication shall be provided in the panel.

8.

The maximum temperature of the bus bars, droppers and contacts at continuous current rating under site reference ambient temperature of 50º C shall not exceed 105º C. Instrumentation: Switchgear instrumentation shall be provided as follows: a. Mains Incomer – Voltmeter with selector switch b. Ammeter with selector switch c. Power Factor meter d. Frequency meter e. TVM + MD meter f. Potential indicating lamps g. Outgoing Feeders h. Ammeter with selector switch on all feeders

5.3.31 General Technical Specifications of Control Panel i.

The panel shall be self-supporting, free standing, floor mounted, modular type with construction having degree of protection of IP 54 as per IS 2147.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 144 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

ii.

The panel shall be fabricated from 14 SWG CRCA sheet steel for frame & load bearing surfaces. Partitions may be fabricated from 16 SWG CRCA if no components are mounted on them.

iii.

The panel shall be painted with 2 coats of primer after pre-treatment and 2 coats of Polyurethane / epoxy paint with shade as decided by the Owner.

iv.

Stiffeners shall be provided at corners & between modules to make panel rugged. The stiffeners will necessarily be required for relay compartments or doors where heavy components are mounted.

v.

The openable covers shall be provided with lift off type hinges, quarter turn door locks and flexible copper wire for earth connection.

vi.

The panel shall be dust and vermin proof. Synthetic or neoprene gaskets shall be provided at all openings.

vii.

The panel shall be of dead front construction suitable for front operated and back maintained functioning.

viii.

Panel shall be provided with fl. lamp of 20 w capacity operated by door operated limit switch. Panel shall also have space heaters and thermostat arrangement.

ix.

Panel shall be provided with 5pin switch socket combined unit of 5/15 Amp capacity.

x.

Lifting hooks shall be provided at the top of the panel.

xi.

The hardware components used in the panel shall be hot dipped galvanized.

xii.

The control components shall be fixed on mounting plate by drilling & tapping.

xiii.

Aluminum anodized legend plates shall be provided for all the components. For components mounted on front face, legend plate from inside shall also be provided.

xiv.

Pretreatment by 7 tank process shall be done before painting / powder coating the panel.

xv.

Panel shall have provision of drawing pocket.

xvi.

The panel shall be designed to ensure maximum safety during operation inspection, connection of cables and maintenance. Inside panel, checking and removal of components shall be possible without disturbing other units.

xvii.

Cable entries will be from bottom. The opening of cable entry shall be covered by 3 mm thick gland plates.

xviii.

The panel shall be provided with all necessary components / devices and instruments as per the enclosed schematic diagram and functional requirements.

xix.

The components such as protective relays, auxiliary relays, push buttons, switches, instruments shall be flush mounted on the front side of a panel.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 145 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xx.

The control wiring shall be done with PVC insulated flexible copper wire. For CT secondary circuits 2.5 sq.mm. wire shall be used. For control wiring 1.5 sq.mm. wire shall be used.

xxi.

Earthing busbar of suitable cross section shall be provided throughout the length of panel.

xxii.

The panel shall be fully wired all the terminals shall be brought out for cable connections. 10% spare terminals shall be provided on each terminal block. Separate terminal block shall be provided for different voltages. All wire shall have P.V.C. ferrules as per wiring diagram.

xxiii.

Proper shrouding to incoming and outgoing terminals shall be provided to ensure safety during operation, inspection and maintenance.

xxiv.

Indicating lamps shall be with multiple LEDs & shall be suitable for the voltage specified.

xxv.

All the components in the panel shall be properly labeled. The labels shall be made of nonrusting metal or engraved PVC material properly fixed by screws.

xxvi.

The panel layout shall be made in such a way that it will always facilitate easy removal and reconnection of control cables without disturbing other wiring.

xxvii.

Centre lines of control switches, push buttons and indicating lamps shall be matched so as to give neat appearance. Similarly top lines of indicating instruments and relays shall also be matched.

xxviii.

The panel shall be provided with electrolytic grade aluminum busbar of suitable cross section so as to maintain max current density of 0.8 AMP/ Sq.mm.

xxix.

Bus bars shall be provided with color coded heat shrinkable sleeves.

xxx.

Bus bars shall be supported by high quality epoxy insulators provided at specified distances so as to withstand to the given fault level.

xxxi.

The busbar chambers shall be provided with suitable ventilation arrangements so as to limit the maximum temperature of 85°C while carrying rated current.

xxxii.

Proper clearance of minimum 25 mm shall be maintained between phase bus bars and between bus bars.

xxxiii.

The panel shall be inspected at manufactures works before dispatch to site at the discretion of GIPCL/GSECL.

xxxiv.

All routine tests shall be carried out on the panel in presence of the Owner / its representative. These tests shall include following: a. Verification of components ratings and operation. b. High voltage measurement test. c. Insulation Resistance measurement.

xxxv.

Control testing.

xxxvi.

Approval on following drawings shall be obtained before manufacturing the panels

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 146 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

a. General arrangement drawing. b. Wiring Diagram.

xxxvii.

Detail bill of material.

xxxviii.

66 kV Under Ground Cable The Contractor shall provide 66 kV Under Ground Cable along with bay and metering on Turnkey basis as per client’s requirementat Charanka GETCO substation. The Bidder shall confirm the same in the Bid.The Underground cable shall also be approved registered supplier in GETCO for Gujarat Solar Park at Charanka, Gujarat.

5.3.32 Metering System i.

ABT energy meter shall be provided as approved by GETCO to measure the delivered quantum of energy to the grid for sale. The responsibility of arranging for the meter, its inspection/calibration/testing charges etc. rests with the Contractor. All charges incurred on Meter testing, shall be borne by the Contractor. ABT energy metering system is to be approved by GETCO.

ii.

Meter must be provided with the necessary data cables.

iii.

Separate metering system has to be provided for L.T. (incoming) and H.T. (outgoing) supply.

iv.

The Bidder shall provide ABT compliant meters at the interface points. Interface metering shall conform to the Central Electricity Authority (Installation and Operation Meters) Regulation 2006 and amendment thereof Commercial settlement of solar Photovoltaic Grid Interactive based power project shall be in accordance with the GERC relevant order. Meter shall be suitable for interfacing for synchronizing the built-in clock of the meter by GPS time synchronization equipment existing at the station either through a synchronization pulse received from the time synchronization equipment or through a remote PC synchronized to GPS clock shall also be in the scope of Bidder.

v.

All charges for testing and passing of the meter with relevant government agency shall be borne by Bidder, GIPCL/GSECL will assist Bidder for necessary document as and when required.

vi.

ABT compliant Energy Meters shall have technical specification as given below (not limited to specified requirement, Bidder can provide Meter with latest facilities):

vii.

Shall be microprocessor-based conforming to IEC 60687 / IEC 6205211/ IEC 62053-22 / IS 14697

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 147 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

viii.

Shall carry out measurement of active energy (both import and export) and reactive energy (import) by 3-phase, 4 wire principle suitable for balanced/ unbalanced 3 phase load.

ix.

Shall have an accuracy of energy measurement of at least Class 0.2 for active energy and at least Class 0.5 for reactive energy according to IEC 60687, and shall be connected to Class 0.2S CT cores and Class 0.2S VT windings.

x.

The active and reactive energy shall be directly computed in CT & VT primary ratings.

xi.

Shall compute the net MWh and MVARh during each successive 15-minute block metering interval along with a plus/minus sign, instantaneous net MWh, instantaneous net MVARh, average frequency of each 15 minutes, net active energy at midnight, net reactive energy for voltage low and high conditions at each midnight.

xii.

Each energy meter shall have a display unit with a seven digit display unit. It shall display the net MWh and MVARh with a plus/minus sign and average frequency during the previous metering interval; peak MW demand since the last demand reset; accumulated total (instantaneous) MWh and MVARh with a plus/minus sign, date and time; and instantaneous current and voltage on each phases.

xiii.

All the registers shall be stored in a non-volatile memory. Meter registers for each metering interval, as well as accumulated totals, shall be downloadable. All the net active/reactive energy values displayed or stored shall be with a plus /minus sign for export/import.

xiv.

At least the following data shall be stored before being over-written for the following parameters: Table 5-16 Co-ordination Parameters Sr.

Parameters

Details

Min No of Days.

1

Net MWh

15 min Block

90 days in meter

2

Average Frequency

15 min Block

90 days in meter

3

Net MVARh for > 103 %

15 min Block

90 days in meter

4

Cumulative Net MWh

At every Mid-night

5

Cumulative Net MVARh for v At every Mid-night > 103 %

30 days in meter / 90 days in PC 30 days in meter / 90 days in PC

6

Date and time blocks of VT failure on any phase

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 148 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xxxix.

Shall have a built in clock and calendar with an accuracy of less than 15 seconds per month drift without assistance of external time synchronizing pulse.

xl.

Date/time shall be displayed on demand. The clock shall be synchronized by GPS time synchronization equipment existing at the station provided by Bidder.

xli.

The meter shall be suitable to operate with power drawn from the VT supplies. The burden of the meters shall be less than maximum 2 VA.

xlii.

The power supply to the meter shall be healthy even with a single-phase VT supply. An automatic backup, in the event of non-availability of voltage in all the phases, shall be provided by a built in long life battery and shall not need replacement for at least 10 years with a continuous VT interruption of at least 2 years. Date and time of VT interruption and restoration shall be automatically stored in a non-volatile memory.

xliii.

Even under the absence of VT input, energy meter display shall be available and it shall be possible to download data from the energy meters.

xliv.

Shall have an optical port on the front of the meter for data collection from either a hand held meter reading instrument (MRI) having a display for energy readings or from a notebook computer with suitable software.

xlv.

The meter shall have means to test MWh and MVARh accuracy and calibration at site insitu and test terminal blocks shall be provided for the same.

xlvi.

The meter shall have a unique identification code provided by the Company and shall be permanently marked on the front of the meter and stored in the non-volatile memory of the meter.

xlvii.

The Owner shall have the right to carry out surprise inspections of the Metering Systems from time to time to check their accuracy.

5.3.33 SCADA and Remote Monitoring System 5.3.33.1 Scope of work for each 75 MW block SCADA system shall cover: i.

Design & Engineering, submission of drawings/documents, manufacture, Factory Acceptance Test (FAT), packing & forwarding, loading, Insurance, transportation, delivery of the SCADA system with HMI system and associated items at each block, supply of mandatory spares, Erection, testing, commissioning of SCADA system and acquisition of solar plant data as well as to provide data in open protocol to central PC / Server for viewing of 75 MW(AC) solar blocks data at each Main Control Room, Stabilization of SCADA

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 149 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

system, providing data to GUVNL as per requirements, training to GIPCL/GSECL engineers, Warranty / Defect Liability Period services, submission of As-built documents.

ii.

The plant shall be automatically operated and shall be controlled by microprocessor based control system SCADA. There shall be simultaneous data logging, recording and display system for continuous monitoring of data for different parameters of different sub systems, power supply of the power plant at DC side and AC side.

iii.

An integrated SCADA shall be supplied which should be capable of communicating with all inverters and provide information of the entire Solar PV Grid interactive power plant.

iv.

Computer-aided data acquisition unit shall be a separate & individual system comprising of different transducers to read the different variable parameters, A/D converter, multiplexer, de multiplexer, interfacing hardware & software, which will be robust & rugged suitable to operate in the control room Environment.

v.

Reliable sensors for solar insolation, temperature, and other weather and electrical parameters are to be supplied with the data logger unit.

vi.

The data acquisition system shall measure and continuously record electrical parameters at inverter output,11kV/33 kV terminal, 66 KV terminal, 66 kV ABT meter at evacuation point, ambient temperature near array field, control room temperature, AC and DC side electrical parameters of each inverter, power characteristics of the HT side.

vii.

All data shall be recorded chronologically date wise. The data file should be MS Excel compatible. The data logger shall have internal reliable battery backup and data storage capacity to record all sorts of data simultaneously round the clock. All data shall be stored in a common work sheet chronologically and representation of monitored data shall be in graphics mode or in tabulation form. All instantaneous data can be shown in the Computer Screen. Provision should be available for Remote Monitoring.

viii.

The Bill of Materials associated with the equipment must clearly indicate especially the details about the PC and Printers, etc.

ix.

The Data Acquisition System should be housed in a desk made of steel sheet.

x.

SCADA shall provide following data at a 5-15 minute interval. a. Power at 66 kV ABT meter at switchyard b. Ambient temperature near array field. c. Wind Speed d. AC and DC side Power of each inverter e. Solar irradiation/isolation

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 150 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

f. Voltage of the HT Side

g. Any other parameter considered necessary by supplier based on current prudent practice. xi.

Minimum I/O Consideration as per below table. Any other parameter not mentioned in the list but required as per current prudent practice to be considered & provided.

Minimum Requirements of SCADA System for I/O Consideration Sr. No.

Equipment Details

Location

1 2 3 4 5 6

66kV Switchyard 66kV Switchyard 66kV Switchyard 66kV Switchyard 66kV Switchyard MCR

Yes Yes Yes Yes Yes Yes

MCR

Yes

8 9 10

ABT Meter Isolators C&R Power Transformer Breakers 11kV / 33 kV VCB Panel DC Battery Charger UPS Aux. Transformer Fire Alarm Panel

MCR / LCR 66kv Switchyard MCR / LCR

Yes Yes Yes

11

Inverter

LCR

Yes

12

11kV /33 kV RMU

LCR

Yes

13

Weather Monitoring Status CCTV

MCR

Yes

Yes

LCR / MCR / Plant / Switchyard Plant

Yes

Yes

Yes

Yes

7

15

String Junction Box

16

xii.

SCADA Requirements Monitoring Control / Data Specific / Status Operation Logging Remarks Yes Yes Yes

Relay Log Marshalling Box

Yes

MFM Meters with RS485 Battery Back Up Status UPS Data Log Marshalling Box

Yes

Yes

Yes

Yes

Inverter Data Log MFM Meters with RS485

Yes Yes

NVR based recording & data transmission Each String / Input Monitoring

SCADA system Panel hardware shall be with Hot-Redundant CPU, Redundant Communication Module & cables and redundant Power Supply Module with necessary non redundant I/O modules i.e. Digital Inputs, Digital Output, and Analog Inputs hardwired

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 151 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

modules. Each channel in each type of I/O modules shall be isolated. Minimum 5 % Spare each type I/Os shall be provided and the same shall be wired up to TBs. Time synchronization through Master Clock shall be provided for PLC /SCADA system. Alarm and hooter shall be provided with HMI.

xiii.

xiv.

SCADA shall provide 15 minute daily, monthly and annual average of following parameters: 

Exported Energy to grid at 66 kV

Energy of each inverter

Solar Radiation

Temperature

The SCADA server PC shall be of Industrial type, rugged & robust in nature to operate in a hostile environment. The PC shall have minimum Intel Core i5 processor having 2 x 500 GB HDD with 8 GB RAM + 2GB RAM with Graphics Card. The PC shall also have 42” LED Color monitor, DVD Drive with Writer, USB drive, Scroll Mouse and UPS for 4 hours Power back up.

xv.

SCADA system shall be integrated for each 75 MW (AC) Solar Project at Master Control Room of Plot –A (Plot-A & Plot B1) & Plot-C (Plot-C & Plot-B2). In case of separate control room for switchyard are designed and considered at Plot-B1 & Plot –B2, SCADA remote view shall be provided at each separate control room.

xvi.

The PLC/SCADA system shall work satisfactorily without air conditioning in control room without affecting performance of the system.

xvii.

Spares and service support letter for SCADA system for 15 Years from date of COD shall be taken from OEM of SCADA system and shall be submitted to GIPCL/GSECL.

xviii.

Minimum 3 (three) nos. Operator cum Engineering stations & one laptop shall be supplied for SCADA System for each 75 MW (AC) Solar Project. Laptop shall work as EWS. Laptop shall be with minimum 1 TB HDD, 4 GB RAM, Processor- i5 or better. Details of PC & Laptop configuration shall be submitted for approval.

xix.

Hard ware as well as software based Fire wall shall be considered for providing data over internet for proper data security.

xx.

The SCADA system shall also have the capability of daily/monthly/yearly reports, trends, alarms, Time based & Event based Reports, events. The minimum data storage shall be of 3 years for SCADA System. Report shall be generated as per the Owner’s requirement and also in the format i.e. Excel or PDF of text as per requirements.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 152 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

xxi.

Contractor shall provide the licensed System software, PC Operating System and System specific software, if any. Minimum 5 % Spare points / tags shall be considered for future provision.

xxii.

All Key (s), passwords & License(s) shall be handed over to GIPCL/GSECL.

xxiii.

PLC Supplier shall develop the Logics/Program, required logic modifications as per System / Plant and the Owner’s requirement at site, without any cost implication to GIPCL/GSECL.

xxiv.

The printer shall be of industrial type, rugged & robust in nature and of reputed make. The printer shall be equipped for printing, scanning, copying and fax.

xxv.

String Monitoring System: String Monitoring System designed exclusively for parallel connection of the photovoltaic field strings, allowing for protection in the case of breakdown & monitoring the entire photovoltaic field, by means of the following checks. 

Reading the string currents

Reading the total voltage of the field

Checking the fuses positioned in the system, to protect the photovoltaic panels.

Checking the state of the internal protection against over-voltages.

Should be very low power consumption.

a. Monitoring of various parameters at string level should be made possible in the main control room at site by installing the suitable string monitoring system any fault at string level could be recognizable by that system. b. A provision should be present for remote monitoring of the power plant at string detail over the web. c. The Contractor shall provide to GIPCL/GSECL the detailed specifications, and all administrative rights/ privileges/ passwords to the string monitoring system. d. In addition to the string performance, various performance and operating parameters of the inverters, transformers and various switchyard equipments including power, energy, efficiency, outages, etc. shall be monitored and logged. Further, all necessary formulas shall be developed in logic like efficiency, performance ratio, expected generation etc. e. For SJB data acquisition at PLC/SCADA system, maximum 10 SJBs shall be looped in one loop for SCADA system. f. Individual and overall screen , 500V/600V minimum 2pair 0.5 Sq.mm armoured cable shall be provided.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 153 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

g. Fiber optical cable shall be provided based on layout for SCADA system. Minimum 2 spare core with termination shall be provided. h. Fiber Optical cable shall be armoured type. Ring / Star network shall be provided for SCADA system.

xxvi.

Weather Station and Data logger a. Contractor shall provide the data over remote web-server with rights to control or modify the same through appropriate arrangements. b. Contractor shall provide necessary licensed software and hardware solution to offer monitoring of electrical parameters of grid and solar generator monitored at individual string level over remote web server. The Contractor shall provide all necessary accessories like power supply, connection cords, sensors, active SIM card with appropriate data plan etc. so as to make the system complete in all respect. c. The cost of data plan during the project and O&M shall be borne by the Contractor. At the end of the O&M, the same shall be transferred to GIPCL/GSECL at no extra cost. d. It shall also have local data logging and communication through Bluetooth / Wi Fi and Ethernet port. e. The Remote Monitoring System shall be capable of sustaining maximum – minimum temperature, rainfall, wind gusts and UV radiation. The enclosure shall be IP65 for outdoor installation / IP21 for indoor installation. f. The Remote Monitoring System shall have capability to log and send data from weather sensors. g. The data shall be available for every minimum 15 minutes interval. h. The system shall have sufficient internal memory storage to retain data for one complete year and shall have provision of expanding memory through external memory card / USB drive. i.

The system shall be able to communicate wirelessly in a close proximity

j.

The Contractor shall provide to the Owner the detailed specifications, and all administrative rights/ privileges / passwords to the string monitoring system.

k. The Contractor shall provide following measuring instruments with all necessary software & hardware compatible with the Data logging and web based monitoring system. i.

Pyrometer: For each 75 MW (AC) project, the Contractor shall provide total three nos. of pyranometers (Two nos. GHI and One no GTI / Plane Irradiance). The pyranometers shall have following specifications mentioned in Table 5-.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 154 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Table 5-17 Specification of Pyranometers

ii.

Sr. 1 2 3 4 5 6 7 8 9 10 11

Particulars Class Spectral Response Sensitivity Time response (95%) Non linearity Temperature Response Temperature Response Tilt error Zero offset thermal radiation Zero offset temperature change Operating temperature range

Specification II 0.31 to 2.8 micron Approx. 9 micro - volt/w/m2 Max 15 sec. ±0.5% ±2% Max ±2% ±0.5%. ±7 w/m2 ±2 w/m2 - 40 deg. to +80 deg.

12 13

Uncertainty(95% confidence Level) Daily-

Hourly- Max-3% Max -2%

14

Non stability

Max ±0.8%

15

Resolution

Min + / - 1 W/m2

16 17

Input Power for Instrument & Peripherals Output Signal

230 VAC (If required) Analogue form which compatible with the data

is

Temperature Sensor: The Contractor shall provide suitable nos. of RTD type temperature sensors with required weather shield as per Indian Standards, so as to individually and simultaneously measure both, ambient temperature, and module temperature. To measure module temperature, the temperature sensors shall be located on the back of representative modules and on front glass surface. Care must be taken to ensure that the temperature of the cell in front of the sensor is not substantially altered due to the presence of the sensor. Instrument shall have a range of -5°C to 60°C.

iii.

Anemometer and Wind Vane: The Contractor shall provide double cup anemometer on tubular type made up of hot dipped Galvanized Iron. Velocity range upto 65 m/s, accuracy limit of 0.1 m/s. the anemometer shall have valid calibration certificates which should be produced during one month of the installation.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 155 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

iv.

Each instrument shall be supplied with necessary cables. Calibration certificate with calibration traceability to World Radiation Reference (WRR) or World Radiation Centre (WRC) shall be furnished along with the equipment. The signal cable length shall not exceed 20m. Bidder shall provide Instrument manual in hard and soft form.

v.

The data acquisition system shall measure, continuously record power at PV module ambient temperature near array field, cell temperature, wind velocity, AC and DC (string level) side power of each inverter, power characteristics of the HT side, fault messages, alarms etc. in Indian Standard Time.

vi.

Reliable sensers for solar insolation , tempetature & other weather & electrical parameters are to be supplied with data logger unit.

vii.

All data shall be recorded chronologically date wise. The data file should be MS Excel compatible. The data logger shall have internal reliable battery backup and data storage capacity to record all sorts of data simultaneously round the clock. All data shall be stored in a common work sheet chronologically. Representation of monitored data in graphics mode or in tabulation form. All instantaneous data can be shown in the Computer Screen. viii.

Provision should be available for Remote Monitoring and Data Retrieval over web server. Moreover, Successful Bidder shall also provide minimum 3 (three) nos. Operator cum Engineering stations & one laptopwith required hardware and licensed copies of software to make it fully functional for normal operation and data logging through Bluetooth / Wi Fi / RS port from the site.

ix.

The Bill of Materials associated with the equipment must clearly indicate especially the details about the PC and other accessories.

x.

The Data Acquisition System should be housed in appropriate enclosure to sustain outdoor environment as per generation design guidelines laid for enclosures. The same shall have provision of locking the same to prevent unauthorized operation. Remote Monitoring System (RMS) shall provide following data at a 15 minute interval. 

Power, Current and Voltage at individual solar PV strings (Instantaneous)

Ambient temperature near array field, cell temperature measured at module front and back surface

Wind Speed

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 156 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Cumulative AC and DC side Power of each inverter

Cumulative AC and DC energy of each inverter

a. Solar irradiation/isolation over horizontal and in-plane of the module b. Voltage, frequency and other important electrical parameters etc. in the local grid. c. Any other parameter considered necessary by supplier based on current prudent practice d. RMS shall have feature to be integrated with the local system as well remotely via the web using either a standard modem or a GSM/WIFI modem. The Bidder shall provide compatible software and hardware so that data can be transmitted via Standard modem. e. RMS shall be provided with independent solar PV based power supply along with maintenance free battery having 3 days autonomy. f. The RMS shall be compatible to the requirements for measuring and reporting the performance-ratio of the power plant. g. The contractor shall provide all administrative rights/ privileges/ passwords of the RMS system to GSECL. h. The Bidder shall submit the data sheet with technical specifications of the RMS system in the Bid. 5.3.34 Management Information System (MIS) for each 75 MW Project: a. Web based monitoring shall be machine independent. The web based monitoring shall provide same screen as available in the plant. All reports shall also be downloaded from remote web client in PDF / Excel format. b. The Bidder shall provide web based Real Time Remote monitoring system such that the data from each 75 MW project shall be available to remote location(s) for viewing data by GIPCL/GSECL officials at GIPCL/GSECL Offices in existing PCs and also outside the offices and to other Government agencies through internet/web based link for real time monitoring of complete system. c. Complete 75 MW Plant data shall be available to remote locations. Minimum 4 Nos. of concurrent remote logins/user are envisaged for web based monitoring/view. Remote monitoring data for MIS shall be viewed at existing the Owner’s PC / mobile. Separate PC / work station for MIS System is not envisaged. All data shall be accessible through internet with password protected login. Further, facility shall be provided for data view from mobile devices also.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 157 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.3.35 Testing Instruments for Electrical & Electronic:

The Contractor shall also provide required set of onsite testing instruments/equipment viz. earth resistance tester, rheostats, insulation tester, millimetres, clamp meters, CRO, Function Generator, Transformer oil BDV kit, Relay testing kit, infra-red thermal imaging hand held temperature meter, inverter testing kit etc. 5.3.36 Electronic LED Display Board: The Contractor shall provide an electronic LED Display board that can display the Solar PV plant parameters like total generation till date, daily generation, instantaneous generation, instantaneous frequency, etc. The LED display board has to be erected at a height of 8 feet above ground level and should be large enough to be read from a distance. The LED display board is to be placed between the Control Room and the main gate, the exact location of which will be provided by the Owner / Consultant after award of the project. Pixel pitch Brightness LED configuration Pixel density Viewing angle Contrast ratio Lifetime Power consumption Processing Refresh rate Operating temperature IP rating Tile size (WxHxD) in mm Serviceability Certifications

16.0 mm 6,500 nits DIP / Equivalent 3,906/sqm 363/sqft H: 140 degrees V: -45/+15 degrees 2,000:1 80,000 hrs Typical: 220W/sqm; 20W/sqft Max: 480W/sqm; 45W/sqft 16 bit/color 4,800 Hz -20/+50 degrees Celcius; -4/+122 degrees Fahrenheit IP 65/54 1,024 x 1,024 x 212 mm / 40.3 x 40.3 x 8.3 inches Front or back CE, UL/ETL, FCC, CB/CEBEC, TUV GS, CCC, RoHs, WEEE

5.3.37 CCTV Camera System The Contractor shall provide IP Based CCTV Camera for the Monitoring of Control Room, Plant Perimeter, Boundary, Entry & Exit Gates complete in all respect including necessary Camera, NVR, Switch, Active & Passive Components, Software, minimum 32” monitor etc.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 158 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

For the capacity of 3.5 & 5 MW land parcel, minimum 16 Nos. of CCTV Camera of various Indoor / Outdoor with Night Vision Camera to install at each plot.

i.

Camera Specification (Outdoor):

1/3" CMOS HD sensor, Out Door Bullet H.264 Compression,2 mega Pixels CMOS, 3DNR,The highest resolution can be up to 1920 × 1080 Low Lux, DWDR, Support Voice talk, 1CH Audio in/1CH Audio Out, Mobile P2P Viewing, Support Protocol: TCP, UDP, IP, HTTP, FTP, SMTP, DHCP, DNS ,ARP, ICMP, POP3,

NTP and

RTSP, Support ONVIF 2.0, Lens:2.8-12mm Megapixel lens (4-9mm lens optional), IR Distance: 20-30m, POE (802.3af).

Support ROI function, Built-in Micro

SD/SDHC/SDXC card slot, Ingress Protection level: IP66, Video Bit Rate 32 Kbps –8 Mbps, Audio Compression G.711/G.722.1/G.726/MP2L2,Dual Stream, BLC, ROI STANDARD: ONVIF, PSIA, CGI, ISAPI ,Operating Conditions -30 °C –60 °C (-22 °F –140 °F). ii. Camera Specification (Indoor): 1/3" CMOS HD sensor, Indoor Dome fix Lens H.264 Compression,1.3 mega Pixels CMOS, 3DNR,The highest resolution can be up to 1280×960,Shutter Speed: 1/3 s to 1/100,000s, Min. Illumination:0.01Lux @ (F1.2, AGC ON) ,0 Lux with IR 0.028 Lux @ (F2.0, AGC ON) ,0 Lux with IR, Video Bit Rate 32 Kbps – 8 Mbps, Support Protocal: TCP, UDP, IP, HTTP, FTP, SMTP, DHCP, DNS, ARP, ICMP, POP3, NTP and RTSP, GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 159 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Support ONVIF 2.0, Lens:3.6mm 1.3Mega Pixel Lens SD, 3DNR, D-WDR, Motion Detection, Privacy Mask, 24pcs LED,20m IR distance, POE(802.3af), Support Dual stream , Impact protection : IK10, operating condition, Support ROI, BLC, Standard : ONVIF, PSIA, CGI, ISAPI, Image Settings: Rotate mode, Saturation, Brightness, Contrast adjustable by client software or web browser , H.264 Type: Baseline Profile / Main Profile. 5.3.38 Fire Alarm System The contractor shall provide Fire Alarm System for LCT, MCR & Control Room as per local CFO’s guideline.

Fire Alarm Panel : Integrated Fire Detection, Alarm and Control System with Voice Evacuation (EVAC) of UL listed Microprocessor based networkable analogue addressable Main Fire Alarm Control having required loop capacity, each loop having capacity of 159 addressable detectors and 159 addressable devices. Panel capacity can be expanded to additional loops by addition of modules or integrating multiple panels. Panel costs to include power supply, 24VDC power supply automatic battery charger, 24 volts sealed lead acid batteries sufficient for 24 hours normal working and then be capable of operating the system for 2 hours during emergency conditions. The system should be complete with user-friendly programming and configuration tools, front panel operating with a full QWERTY keypad and alphanumeric 640 character LCD display. The Panel as well as detectors and devices GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 160 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

shall be UL 9th edition Approved/Listed and in conformance with international standards such as NFPA 72 2010 edition National Fire Alarm and Signalling Code for Human Life Safety. The complete system as a solution must be supplied from the same make/OEM manufacturer components conforming to these standards. The panel shall have the capability to integrate with SCADA on open protocol. Smoke Detector: Analog Addressable Multi-Criteria Sensing Type Detector or Heat Detector as per application must be with mounting based LED, Address Switch inclusive of detector base and complete as required. All Detectors must be UL Listed & FM Approved. Sounder : UL Listed Directional Sounders with 20 hz to 20 khz operating frequency with minimum 8 distinct sound patterns to indicate corridors, Exit doors, Move upward, move down ward etc. to direct Occupants for fast & safe Evacuation as specified in NFPA 72 2007 edition complete as per all requirements of technical specifications & contracts works. Manual Call Point / Glass Break Device: UL listed, Flush or surface mounted Manual Call Point in manufacturers prescribed matching red enamel outlet box complete. All components must be of same manufacturing origin. Monitor, Control Modules & Fault Isolators: UL listed, modules complete with mounting arrangement on North American junction box as per requirements of contract works.

5.3.39 Vendor List The list of acceptable makes for equipment / system are as listed below: Sr.

Description

1

PCU / Inverter

2

PV Modules

3

HT Panel /HT Breaker

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Vendor Name

M/s SMA M/s ABB India Ltd. M/s Hitachi Hi-Rel Power Electronics Pvt Ltd. Bidder to propose other reputed make based on reference and credentials for approval of GIPCL Tier-1 manufacturer as per Bloomberg BNEF Q4 2017 report and fulfilling the other tender requirements, subject to approval of Owner Siemens L&T ABB (Sign and Seal of Bidder)

Page 161 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4

5

6

7

8

Control and relay panel

LT Switchgear component (LT switchgear panel shall be CPRI approved vendor)

Power Transformer

Inverter Transformer

Auxiliary Transformer (Dry Type)

9

Solar Cable and DC Cable

10

AC Cable (Up to 33 kV)

10

HT termination kits Optical Fiber Cable

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Schneider Jyoti CGL ABB Siemens Schneider Alstom L&T Siemens

ABB Schneider Voltamp Schneider CGL ABB BHEL ALSTOM Schneider Electrotherm Voltamp ABB CGL T&R Voltamp Kotson Danish Melcon M/s LAPP M/s Siechem M/s KEI Cables M/s UniFlex Cables M/s Cords Cables M/s Apar M/s Universal M/s KEC M/s LAPP M/s KEI Cables M/s Havells M/s Universal M/s KEC Raychem 3M Finolex

(Sign and Seal of Bidder)

Page 162 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

11

D-Link

12

Earthing Pit Materials

13

SJB

14

Lugs

15

Cable Glands

16

Ashlok Powertrac ERICO M/s Hensel Electric Pvt Ltd M/s Trinity Solar M/s Eaton M/s ABB Dowell Comet 3D Comet / 3D M/s Rockwell M/s Siemens

SCADA System

M/s Schneider

17

Weather Sensors

18

Batteries

a. Pyranometer : i) Keep & Zonen ii) Ingenieurbüro Mencke & Tegtmeyer GmbH b. Wind Sensor: ADOLF THIES Gmbh& Co c. Temperature Measurement: i) Met One Inc ii) Climatronics d. Wind Speed & direction : i) Met One Inc e. Tripod Stand : i) Met One Inc ii) Climatronics For other reputed make – GIPCL in charge engineer’s approval is required. Exide

19

UPS

20

Battery Charger

21

Lightning Arrestor (ESE type)

22

ABT Energy Meter ( subject to approval of GETCO /GUVNL)

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Hitachi HI-REL Eaton Emerson M/s Chhabi Electrical M/s. Caldyne M/s. HBL Niap power system Ltd M/s Servilink Erico Nimbus AT, Spain Ingesco Indelec SEMS EDMI

(Sign and Seal of Bidder)

Page 163 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

23

HT Isolator (Upto 66 kV Outdoor Type)

24

HT CT & PT (Upto 66 kV Oil Filled Type)

25

LA (Upto 66 kV Outdoor Type)

26

66kV Cable (Subject to approval of GETCO)

Siemens ABB CGL GR Power switchgear ABB CGL Pragati Jyoti CGL Oblum Elpro M/s Universal (Satna, MP) M/s Torrent (Ahmedabad, Gujarat) M/s KEI (New Delhi) M/s Polycab (Daman, Gujarat) BHEL Birla Sujana Towers Kalpatru Power transmission OR Any other Approved vendors of GETCO 3M ITIPL Approved vendors of GETCO Klemenn engineering corporation Approved vendors of GETCO Siemens Areva Siemens L&T

27

Disc and post insulator

28

GI structure for the switchyard

29

Insulator hardware

30

Clamps and connectors

31

Numerical Relay

32

Switch fuse unit

33

PLCC equipments

ABB

34

Lighting fixture / system

Philips / CGL/Bajaj/Havells

35

CSS (Compact Sub-station)

36

LED Lighting

37

MCCB

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

ABB CGL Siemens Alstom Schneider CGL Wipro Bajaj Panasonic Philips SIEMENS ABB (Sign and Seal of Bidder)

Page 164 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Schneider L&T ABB Schneider Siemens CGL L&T TISCO SAIL JINDAL RINL ESSAR Kirlosker KSB CGL CRI Jyoti

38

RMU (Ring Main Unit)

39

Steel Structure for MMS

40

Submersible/Sump Pump

41

CCTV Camera & Monitoring System

Sony /Honeywell/Milestone

NOTES: (1) The final make selected out of the recommended makes listed above shall be subject to the Owner’s approval during detailed Engineering. (2) Wherever the make is not specified for any other items, the contractor shall

submit

credential for vendors for relevant items / equipments, out of which Owner shall decide acceptance of vendor based on review of credentials. This shall have no price implication. Owner reserves the right to reject the proposed vendor without assigning any reason. (3) Bidder may suggest /request for approval of Additional vendor with credentials and details for review and approval of Owner. Owner may consider the request in case proposed additional vendor is reputed and meeting the tender specification requirements. Owner reserves the right to reject the proposed vendor without assigning any reason. (4) For SCADA system common make of PLC / SCADA system is envisaged for all Plots allotted to GIPCL& GSECL i.e.2x75 MW. GIPCL/GSECL will provide required coordination for matching vendor of SCADA system for 2x75 MW projects.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 165 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5.3.40 Mandatory Spares List for each 75 MW (AC) Sr. 1 2 1 2 3 4 5 6 7 8 1 2 3 4 5 1 2 3 4 5 6 7 1 1 2 3 4 5 1 2 3

Description

PV Module SPV Module Connector Set PCU Complete IGBT stacks assembly with drivers for 1 inverter Surge protection devices for 1 inverter Fuse (each type & rating) for 1 inverter Fuse Holder (each type & rating) for 1 inverter Power supply SMPS set for 1 inverter Control card – each type and rating for 1 inverter Tripping and Closing coil of ACB of AC side, for 1 inverter Cooling Fan (each Type and rating) for 1 inverter SJB Complete String Junction Box with component Surge Protection Devices each type Junction box fuses Electronic Module each type Power Supply Unit INVERTER TRANSFORMER & POWER TRANSFORMER Buchholz relay OTI & WTI complete MOG Valve (each type) Silica gel breather Bushing & Support insulator (each type) Pressure relief device Structure Complete Structure assembly for One Array / String AC / DC Distribution Boards Indicating Lamps of each type used Contactor of each type used Relay of each type used Indicating instruments of each type used Circuit Breaker of each type used Battery Charger Indicating instruments of each type used Shunt Resistor of each type used Complete Thyristor Bridge/Module of each type used

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Quantity 100 Nos. 500 Nos 1 Set 4 Sets 4 Sets 4 Sets 1 Set 2 Sets 3 Sets 2 Sets 4 Nos. 20 Nos. 100 Nos. 4 Nos. 4 Nos. 1 Set 1 Set. 1 Set. 1 No. 1 Set. 1 No. 1 Set. 1 Set 04 Nos. 02 Nos. 01 No. 01 No. 01 No. 02 Nos. 02 Nos. 04 Nos. Page 166 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

4 5 6 7 8 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Printed Circuit Cards of each type used Semi Conducting Type Fast Fuse of each type Auxiliary Fuse of each type used Auto Transformer of each type used Control transformer of each type and rating DC Inverter /UPS Circuit Breaker of each type used Complete Thyristor Bridge/Module Printed Circuit Cards – Inverter Control Card and Data Logger Card Cooling Fan HT Panel Protection relays of each type used Test plugs Auxiliary relays of each type used Circuit breaker trip and closing coils each type Breaker Position Switch each type and rating LT Panel / switchgear MCCB Current transformer each used type Coils for tripping and closing Breaker Position Switch each type and rating 66 kV Switchyard Surge arrester for 66 KV Disc Insulators string 66 kV (Each type) Conductor of each type used each type Stringing hardware Terminal Connectors on high voltage conductors and equipments each type Complete drive mechanism including motor for disconnector switches Trip coils for circuit breakers Closing coils for circuit breakers Complete set of rupture disc 66kV Current transformer of each rating 66kV Voltage transformer of each rating 66kV Post insulator 66kV Isolator contacts set (Male+Female) Maintenance earthing rod for 66kV Breaker operating mechanism SF6 bottle (To fill SF6 in one complete Circuit breaker) Contactors and relays of each type and rating used in circuit breaker and isolator control cubicle / Mechanism box Limit switch for the isolator 66kV Earth switch contact assy.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

02 Nos. 06 Nos. 05 Nos. 01 No. 01 No. 02 Nos. 02 Nos. 02 Nos. 02 Nos. 01 No. 01 No. 05 Nos. 02 Nos. 02 Nos 01 No. 01 No. 02 Nos 02 Nos 3 Nos. 2 Sets 50 mtr 01 Set 01 Set 01 No. 01 No. 01 No. 1 Sets 02 Nos. 1 Nos. 01 Set 01 Set 01 Set 01 Set 01 No. 01 set. 01 Set 01 Set (For three pole) Page 167 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

1 2 3 4

SCADA System Each type of electronic modules including CPU Any type of converter like RS 485 to Ethernet, Serial link converter, MODBUS converter etc Network Switch Any other recommended spares by OEM List shall be submitted

1 No. each type 1 No. each type 1 No each type

Notes: (1) The suggested spares are the minimum requirement of GIPCL/GSECL. The EPC Contractor shall ensure sufficient spares beyond the suggested spares list to maintain its contractual obligations. (2) Bidder shall furnished recommended spare list as a part of design/drawing approval stage. (3) Wherever % indicated in Mandatory spares list, Total installed quantity of each type shall be considered for calculation of % of spare of each type. (4) For rounding of upper side number shall be considered for quantity of item. (5) All the mandatory spares may be kept at site with record of use by Contractor during O&M. Used items shall be replenished by Contractor time to time. All mandatory spares items shall be handed over to GIPCL/GSECL after completion of O&M period. --- End of Section---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 168 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6 General Terms and Conditions 6.1

Use of Contract Documents & Information

6.1.1 The Contractor shall not, without GIPCL’s / GSECL’s prior written consent, disclose the Contract or any provision thereof or any specification, plan, drawing, pattern therewith to any person other than person employed by the Contractor in performance of the Contract. Disclosure to any such employed person shall be made in confidence and shall extend strictly for purpose of performance only. 6.1.2 The Contractor shall not, without GIPCL’s / GSECL’s prior written consent, make use of any document or information except for purpose of performing the Contract. 6.1.3 Any document other than the Contract itself shall remain the property of GIPCL/GSECL. 6.2

Patent Rights

6.2.1 The Contractor shall indemnify GIPCL/GSECL against third party claims of infringement of patent, trademark or industrial design rights arising from use of goods/design or any part thereof. 6.3

Materials and Workmanship

6.3.1 All materials shall be of the best quality and workmanship capable of satisfactory operation under the operating and climatic conditions as may be specified. Unless otherwise specified, they shall conform in all respect to the latest edition of the relevant Bureau of Indian Standard (BIS) specification wherever Indian specifications apply or British Standard (BS) or International Electro-technical Commission (IEC) or internationally accepted standard. 6.3.2 The Contractor shall supply and deliver all equipment and materials for installation at site. The Contractor shall arrange for transportation, loading and unloading and safe storage of materials at project site at his own cost and risk. 6.3.3 If the Contractor offers equipment manufactured in accordance with other international well recognized standards, he shall, in that case, supply a copy in English of the Standard Specification adopted and shall clearly mention in what respect such standard specification differs from Indian Standard Specifications. The plant, equipment, and

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 169 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

materials offered by the Contractor should comply with one consistent set of Standards only as far as possible.

6.3.4 No deviation in foreign exchange rate shall be admissible at any point of time after submission of the Bid. 6.4

Inter-changeability

6.4.1 All the parts shall be made accurately to standard gauges and specifications so as to facilitate replacement and repairs. All corresponding parts of similar apparatus shall be inter-changeable. 6.5

Packing and Marking

6.5.1 The Contractor shall be responsible for securely protecting and packing the plant and equipment as per prescribed standards in force to withstand the journey and ensuring safety of materials and also arrival of materials at destination in original condition and good for contemplated use. Packing case size and weight shall take into consideration the remoteness of the goods’ final destination and absence of heavy material handling facilities at all points in transit. 6.5.2 Packing lists of materials shall be provided in each package to facilitate checking up of the contents at the destination. 6.5.3 In order to import any items, associated with the Project, from abroad or from any other state in India, the Contractor shall have to arrange any clearance, permission, if required at his own risk, from any Government (Government of State and Government of India) or any Government (Government of State and Government of India) controlled organization for transportation of materials from manufacturing shop to delivery at any site. Necessary certificates if so required shall be issued by GSECL within reasonable time after getting written request from the Bidder along with the necessary documents substantiating necessity of such approvals. All packing material is the property of GSECL and shall be immediately deposited by the Contractor to GSECL’s Store at Project Site. 6.6

Negligence

6.6.1 If the Contractor neglects to manufacture or supply the plant and equipment with due diligence and with expeditiousness or refuses or neglects to comply with any reasonable

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 170 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

order given to it in writing by GIPCL/GSECL or contravenes any provisions of the Contract, GIPCL/GSECL may give seven (7) seven days notice in writing to the Contractor, to make good the failure, neglect or contravention complained of. If the Contractor fails to comply with the notice within reasonable time from the date of serving thereof, in the event of failure, neglect or contravention capable of being made good within that time, then in such case, if GIPCL/GSECL thinks fit, it shall be lawful for it to take the manufacture or supply of plant wholly or in part, out of the Contractor’s hand and give it to another person on Contract at a reasonable price and GIPCL/GSECL shall be entitled to retain any balance which may be otherwise due on the Contract by it to the Contractor or such part thereof as may be necessary, to the payment of the cost of manufacture or supply of such plant as aforesaid.

6.6.2 If the cost of executing the work as aforesaid shall exceed the balance due to the Contractor and the Contractor fails to make good such deficiency, GIPCL/GSECL shall take action in the manner it may consider deem fit in terms of the Contract. 6.7

Statutory Responsibility

6.7.1 The Contractor shall comply with all applicable laws, by laws, rules, and regulations and shall procure and maintain their validity all necessary Municipal, Panchayat and Government permits & licenses etc. at its own cost. 6.8

Insolvency and Breach of Contract

6.8.1 GIPCL/GSECL may at anytime by notice in writing summarily terminate the Contract without compensation to the Contractor in any of the following events: a. If the Contractor at any time, is adjudged insolvent or have a receiving order or order from administration of its state made against it or shall take any proceeding for compensation under any Insolvency Act for the time being in force or make any conveyance or assignment with its creditors or suspend payment. If the Contractor being a company is wound up voluntarily or by the order of a court or a Receiver, Liquidator or manager on behalf of the Debenture holder is appointed or circumstances have arisen which entitle the Court or debenture holder to appoint a Receiver, Liquidator or Manager.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 171 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.9

Timeline (Best Effort Schedule)

6.9.1 The Contractor shall provide full programme of the supply in detail and delivery schedule along with work schedule thereto. Strict adherence and guaranteed delivery schedule mentioned in terms and conditions shall be the essence of the Contract and delivery schedule must be maintained. 6.9.2 The work must be completed as per the Timeline below from the date of handing over of site. Best Effort Schedule Sr.

Stage

Reference from Zero Date (“D”)

1.

Issue of Letter of Intent

2.

Completion of site developmental work

D+40

3.

Commencement of civil work

D+50

4.

Approval of major drawings

D+70

5.

Completion of supply of major balance of system

D+140

6.

Completion of Civil work & erection of MMS in phased manner, as per agreed schedule

D+160

7.

Completion of supply of PV modules, in phased manner, as per agreed schedule

D+210

8.

Completion of Civil work for Inverter room and Control room, General Civil works, in phased manner, as per agreed schedule

D+240

9.

Installation and interconnection of all DC circuit

D+250

10.

Installation and interconnection of all AC circuit

D+250

11.

Interconnection and testing of entire plant

D+280

12.

Commissioning of entire plant

D+290

13.

COD with GUVNL/GEDA (full capacity)

D+300

14.

Operational Acceptance Test & Completion of Facilities (Tentative)

D+330

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

D

Page 172 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

15.

Plant Stabilisation and Operation by EPC Contractor and earn incentive for early commissioning

D+300 to D + 364

16.

Performance Guarantee Test-cum-Final Acceptance Test (Tentative) after completion of first year of operation after COD with GEDA/GUVNL

D+665

6.9.3 The Contractor shall also provide a Bar/ PERT Chart indicating completion schedule for various items involved in the work within the stipulated completion period and the Contractor should strictly adhere to that schedule. 6.9.4 The issue of LoI shall be considered as the Zero Date. 6.9.5 The Bar/ PERT Chart provided by the Contractor shall submitted to GIPCL/GSECL for approval prior to commencement of the execution of the Project. All comments and modifications provided by GIPCL/GSECL shall be incorporated and adhered to by the Contractor in the Timeline, Bar/ PERT Chart, detailed execution plan, etc. for execution of the Project. 6.9.6 Based on above timeline, Bidder/Contractor to submit detailed schedule/timeline for each Inverter Block. 6.9.7 The Commissioning of the Project shall be carried out based on GUVNL RFS referred in this tender, inline with commissioning procedure of GUVNL. GEDA/GUVNL authorized representative will witness and validate the commissioning procedure at site. Commissioning certificate shall be issued by State Nodal Agency or GUVNL after successful commissioning. 6.9.8 “Commissioning” word indicated in this tender shall mean commissioning certificate issued by State Nodal Agency (GEDA) or GUVNL after successful commissioning. 6.9.9 Partial commissioning in each project of 75 MW slot shall be allowed in the minimum 15 MW and maximum in three slots. Also partial commissioning shall be considered by GIPCL/GSECL subject to consideration and acceptance by GEDA/GUVNL.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 173 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.10 Delay in Execution or Failure to Supply

6.10.1 Any delay in completion of the work shall attract liquidated damage/ penalty for late completion as per Liquidated Damage (Clause 6.11) of this Tender. 6.10.2 If the Contractor fails to deliver the plant or fails to start the work within specified time frame after issue of LoI or fails to carry out the work as per agreed schedule or leaves the work site after partial execution of the work, GIPCL/GSECL shall have the right to get the work done through any other agency at the risk and cost of the Contractor. Further to this, GIPCL/GSECL may, without prejudice to the right of the Contractor to recover damages for breach of trust of the Contract, may impose penalties. 6.10.3 Notwithstanding anything contained in this tender document, bidders to note that Completion time of Project activities as per the prescribed timeline/schedule is the essence of the Contract. It is envisaged that EPC Contractor shall plan and achieve progress of the Project on or before the prescribed timeline/schedule without fail. If, at any time, the CONTRACTOR’s actual progress falls behind or is likely to fall behind the agreed schedule of the break-up/detailed Project activities, the CONTRACTOR shall submit to the OWNER, a revised programme with catch up schedule, taking into account the prevailing circumstances and delay in the respective activities / milestones. The CONTRACTOR shall, at the same time/forthwith notify promptly to GIPCL / GSECL of the steps being taken to expedite progress of the Project activities, so as to achieve completion of such activities within the agreed Time schedule for Completion. The Contractor shall in order to overcome the situation, forthwith mobilise required additional resources like manpower, materials, machineries etc. to achieve the prescribed timeline/schedule at his risk and cost. In case further slippage is observed in the progress of Project activities, as per agreed time schedule or failure by EPC Contractor, at any stage of the Contract, to perform the Contract diligently to fulfill his obligations as per the EPC Contract, GIPCL / GSECL reserves the right to engage any other Contractor(s)/sub-contractor(s) at any time, at the risk and cost of the EPC Contractor to ensure completion of the Project activities in line with the agreed time schedule. Further, GIPCL/GSECL will also deduct Liquidated Damages (LD) arising out of any such delay, if any, as per the terms of this tender document or recover the costs, expenses, losses, damages incurred or suffered by

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 174 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

GIPCL/GSECL as per the recourse available under this tender document or any other law for the time being in force.

6.11 Liquidated Damages for Delay and Underperformance A. Delay in Commissioning and COD with GEDA/ GUVNL 6.11.1 In case the EPC Contractor fails to achieve successful Commissioning / COD of 2 x 75 MW (AC) with GUVNL within 12 months from the date of LoI (Zero date), then GIPCL/GSECL shall levy the Liquidated Damages on the EPC Contractor. Partial commissioning in each project of 75 MW (AC) slot shall be allowed in the minimum 15 MW (AC) and preferably maximum in three slots. However, Operational Acceptance Test (OAT) shall start only when respective 75 MW (AC) capacity commissioned by the Contractor. 6.11.2 Completion time is the essence of the Contract and the same shall be firm and binding. The Bidder shall complete “COD with GEDA/GUVNL” of 2 x75 MW (AC) Solar PV Projects within 10 months on best effort basis. For calculation of Liquidated Damages (LD), Project schedule shall be considered as 365 Days i.e. project shall be completed (COD with GEDA/GUVNL, with full capacity) within 365 Days from the ”Zero Date”. 6.11.3 In case the EPC Works of solar PV project (COD with GEDA/GUVNL, with full capacity) is not completed within the stipulated time period (i.e. 365 days from zero date) and the delay is not due to Force Majeure or due to GIPCL’s / GSECL’s default then the Contractor shall pay to the GIPCL/GSECL compensation for delay subject to following: a)

Delay up to 30 days: Amount of Rs. 15,000/MW/Day shall be deducted as penalty

for the first 30 days of delay, calculated on per day basis and proportionate to the capacity not commissioned as COD with GEDA/GUVNL. b)

Delay of more than 30 days and up to 60 days: Amount of Rs. 25,000 /MW/day

shall be deducted on per day basis and proportionate to the capacity not commissioned as COD with GEDA/GUVNL. c) Delay of more than 60 days: Amount of Rs. 35,000 /MW/day shall be deducted on per day basis and proportionate to the capacity not commissioned as COD with GEDA/GUVNL. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 175 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Maximum applicable Liquidated Damages: The upper ceiling for total liquidated damages for delay shall be maximum 10% of the EPC Contract Price . 6.11.4 The said right of the GIPCL to levy damages on account of delay shall be without prejudice to and in addition to the right of the Company to get the concerned work done from a third party at the complete risk and cost of the Contractor. 6.11.5 The Contractor shall indicate duration of all the activities in activity chart in conformity with the overall schedule of the completion of project. The Contractor shall submit the activity chart in form of Bar Chart which shall be discussed and finalized and shall be a part of Contract. 6.11.6 Any strike / lockouts at works or site of the Contractor or his sub-supplier/sub-contractor shall not be considered as force majeure condition. 6.11.7 For calculation of penalty, date of issue of LOI shall be the reference date. B. Underperformance 6.11.8 At the time of the Operational Acceptance Test, any shortfall in the Performance Ratio (PR) as determined through the Test Procedure in the Appendix 16: Procedure for Performance Testing will attract imposition of Liquidated Damages after one (1) unsuccessful chance. For any shortfall in PR below 0.75 by the Bidder for the second (2) time, a penalty of 1% of the EPC Contract Price (including taxes & duties) shall be levied. In case the first the Test is unsuccessful then penalty shall not be charged but the Contractor has to make the necessary corrections to conduct the test again within the stipulated maximum 30 days, so as to demonstrate the PR equal to or more than 0.75.In the second (2nd) time, a penalty at the rate specified above shall be levied on the Contractor. The penalty shall be deducted from the pending payment and Performance Bank Guarantee. However, if Contractor feels that NEEGG may not be achieved and want to carry out further correction, the same will be allowed for the one more time i.e. 3rd time but PG Test and O&M period shall start from such later date as mentioned in Point no. A (xi) in NIT; Table Pg. 5. In case the Contractor is successful in 3rd attempt then 1% of the EPC Contract Price (including taxes & duties) deducted after unsuccessful 2nd attempt shall be returned. However, if the Contractor fails in the 3 rd

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 176 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

attempt as well then the penalty deducted at the time of 2 nd unsuccessful attempt shall

not be returned. C. Performance Guarantee Test / Final Acceptance Test 6.11.9 If the “Actual Delivered Energy” at metering point(GETCO end sub-station)is less than the Base NEEGG (corresponding to NEEGG quoted for 1st year of O&M) based on the procedure mentioned in the Appendix 15, then the penalty at rate of Rs (2.67x 1.50) per kWh shall be charged for the shortfall. The Bidder / Contractor shall make necessary correction to meet quoted NEEGG. In case contractor fails to pay penalty as above within 15 days, then the entire Performance Bank Guarantee shall be encashed by the Owner and all the remaining payments yet to be made by the Owner to the Contractor shall also be forfeited. 6.12 Penalty / Incentive for Generation during Operation & Maintenance (O&M) A. Penalty for loss of Generation during O & M 6.12.1 For each Contract Year, the Contractor shall demonstrate “Actual Delivered Energy” at the Metering Point (GETCO end sub-station) as compared to the ‘Base NEEGG’ for the particular year (calculated as per the methodology given in Appendix 16 Part C). 6.12.2 If for any Contract Year, it is found that the “Actual Delivered Energy” is less than ‘Base NEEGG’ for the particular year, the Contractor shall pay the compensation to GIPCL/GSECL equivalent to Rs. (2.67 x 1.50) per kWh of under-generation. The same shall be recovered from payment yet to be made by GIPCL/GSECL to the Contractor and/ or from the Bank Guarantees available with GIPCL/GSECL. 6.12.3 In case of any defect in the system after Commissioning, the Contractor shall repair it within forty eight (48) hours. After 48 hours, penalty shall be charged and the same shall be deducted / recovered from payments yet to be made by GIPCL/GSECL to the Contractor and / or from the Bank Guarantee submitted to GIPCL/GSECL. A penalty at the rate of Rs. (2.67 x 1.50) per kWh shall be charged by the Owner for the loss of generation due to that effect post 48 hours. The loss of generation shall be calculated with respect to the NEEGG of that particular year based on the actual radiation. 6.12.4 However, in case the Contractor fulfils the NEEGG at the end of the year then the amount deducted as a penalty for loss of generation as per this Clause shall be adjusted GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 177 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

in the Contractor’s bill or reimbursed. In case the Contractor fails to meet the NEEGG at the end of the year then above-mentioned penalty shall be adjusted from the penalty calculated at the end of the year for the shortfall in the generation so that there is no duplication of penalty for the same loss of generation. The first 48 hours shall not be considered for the penalty in case of any defect.

6.12.5 In case the Project fails to generate any power continuously for 6 months any time during the O&M period, it shall be considered as an “Event of Default”. 6.12.6 Upon occurrence of any Event of Default mentioned in Clause 6.12.4 herein above, GIPCL/GSECL shall have the right to encash the entire amount of O&M Bank Guarantee submitted by the Contractor and withheld any other pending payment. 6.12.7 The Owner reserves the right to perform random audits of weather monitoring system of the plant anytime during the entire O&M period. If any discrepancy is found between the measured parameters, the difference between the measured parameters by GIPCL/GSECL from secondary sources and the weather monitoring system installed by the Contractor at the site will be factored in calculating the adjusted NEEGG during the entire year. However, GIPCL/GSECL will have the final authority to decide on this matter. B. Incentive for Early Completion & Higher Generation during O & M 6.12.8 Incentive for Early Completion (COD with GEDA/GUVNL): Twenty (20) paisa per unit incentive shall be payable for successfully early completion of the Project subject to early acceptance of COD by GUVNL and receipt of payment to GIPCL/GSECL 6.12.9 Incentive for higher Generation during O & M: To encourage efficient Operation and Maintenance of the Solar Plant Incentive as per following shall be considered by GIPCL / GSECL. If for any Contract Year, it is found that the “Actual Delivered Energy” is higher than ‘Corrected NEEGG’ for the particular year, the Owner shall pay incentive to EPC Contractor equivalent to ten (10) Paisa per kWh of excess actual generation during the year.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 178 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.13 Defect Liability 6.13.1 The Contractor must warrant that the facilities or any part thereof shall be free from defects in the design, engineering, materials and workmanship of the Plant and Equipment supplied and of the work executed. 6.13.2 If it shall appear to the authorized representative of the Company that any supplies have been executed with unsound, imperfect or unskilled workmanship, or with materials of any inferior description, or that any materials or articles provided by the Contractor for the execution of Contract are unsound or otherwise not in accordance with the Contract, the Contractor shall on demand in writing inform the authorized representative of the Company specifying the item, materials or articles complained of, notwithstanding that the same may have been inadvertently or otherwise passed, certified and paid for. The Contractor shall forthwith rectify or remove and replace that item so specified and provide other proper and suitable materials or articles at its own charge and cost, and in the event of failure to do so within a period to be specified by the authorized representative of the Company in its demand aforesaid, the Project Manager may on expiry of notice period rectify or remove and re-execute the time or remove and replace with others, the materials or articles complained of as the case may be at the risk and cost in all respects of the Contractor. The decisions of the authorized representative of the Company as to any question arising under this Clause shall be final and conclusive. 6.13.3 If during the Defect Liability Period any defect found in the design, engineering, materials and workmanship of the Plant and Equipment supplied or of the work executed by the Contractor, the Contractor shall promptly, in consultation and agreement with GIPCL/GSECL regarding appropriate remedying of the defects, and at its cost, repair, replace or otherwise make good (as the Contractor shall, at its discretion, determine) such defect as well as any damage to the Facilities caused by such defect. 6.13.4 Furthermore, without prejudice to the generality of the foregoing, it is clarified that the Contractor shall also be responsible for the repair, replacement or making good of any defect or of any damage to the Facilities arising out of or resulting from any of the following causes: a. Improper operation or maintenance of the Facilities by the Contractor during operation and maintenance of the Facility; or GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 179 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

b. Operation of the Facilities violating specifications of the Facilities.

6.13.5 GIPCL/GSECL shall give the Contractor a notice stating the nature of any such defect together with all available evidence thereof, promptly following the discovery thereof. GIPCL/GSECL shall afford all reasonable opportunity for the Contractor to inspect any such defect. 6.13.6 GIPCL/GSECL shall provide the Contractor all necessary access to the Facilities and the Site to enable the Contractor to perform its obligations. 6.13.7 The Contractor may, with the consent of the Company, remove from the Site any Plant and Equipment or any part of the Facilities that are defective, if the nature of the defect and/ or any damage to the Facilities caused by the defect is such that repairs cannot be expeditiously carried out at the Site. 6.13.8 If the repair, replacement or making good is of such a nature that it may affect the efficiency of the Facilities or any part thereof, the Company may give to the Contractor a notice requiring that tests of the defective part of the Facilities shall be made by the Contractor immediately upon completion of such remedial work, whereupon the Contractor shall carry out such tests. 6.13.9 If such part fails the tests, the Contractor shall carry out further repair, replacement or making good (as the case may be) until that part of the Facilities passes such tests. The tests, in character, shall in any case be not inferior to what has already been agreed upon by GIPCL/GSECL and the Contractor for the original equipment/part of the Facilities. 6.13.10If the Contractor fails to commence the work necessary to remedy such defect or any damage to the Facilities caused by such defect within a reasonable time (which shall in no event be considered to be less than seven (7) days), the Company may, following notice to the Contractor, proceed to do such work, and the reasonable costs incurred by GSECL in connection therewith shall be paid to GIPCL/GSECL by the Contractor or may be deducted by the Company from any monies due to the Contractor or claimed under the Performance Guarantee, without prejudice to other rights, which GIPCL/GSECL may have against the Contractor in respect of such defects. 6.13.11If the Facilities or any part thereof cannot be used by reason of such defect and/ or making good of such defect, the Defect Liability Period of the Facilities or such part, as GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 180 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

the case may be, shall be extended by a period equal to the period during which the Facilities or such part cannot be used by the Company because of any of the aforesaid reasons. Upon correction of the defects in the Facilities or any part thereof by repair/ replacement, such repair/ replacement shall have the defect liability period of eighteen (18) months from such replacement.

6.13.12In addition, the Contractor shall also provide an extended warranty for any such component of the Facilities and for the period of time. Such obligation shall be in addition to the Defect Liability Period specified under Clause 6.13. 6.14 Termination for Default 6.14.1 The Owner may, without prejudice to any other remedy for breach of Contract, by written notice of default sent to the Contractor, terminate the Contract in whole or in part if the Contractor fails to deliver or execute any or all of the goods within the time period(s) under the Contract or any extension thereof granted by GIPCL/GSECL pursuant to the clause for Delay in Execution or Failure to Supply or, If the Contractor fails to perform any other obligations(s) under the Contract. 6.14.2 In the event the Owner terminates the Contract in whole or in part, pursuant to above, the Owner may procure, upon such terms and in such manner as it deems appropriate, goods similar to those undelivered, the Contractor shall be liable to the Owner for any excess costs for such similar goods. However, the Contractor shall continue the performance of the Contract to the extent not terminated. 6.14.3 In case the Contractor is not able to demonstrate the “Actual Delivered Energy” as per the “Base NEEGG” based on the procedure mentioned in Appendix 16 during the Performance Guarantee Test and after the penalties levied as mentioned in Clause 6.12; GIPCL/GSECL reserves the right to terminate the Contract at its discretion if there are no efforts are made from the Contractor to correct the issues regarding plant performance. 6.14.4 In case termination of the Contract due to default, the Contractor may be blacklisted by GIPCL, GSECL, GUVNL, GERMI and its associate companies, etc. for future work.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 181 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.15 Breach and Cancellation of the Contract

6.15.1 In case of non-performance in any form or change of the covenant and conditions of the Contract by the Contractor, the Owner shall have the power to annul, rescind, cancel or terminate the order and upon its notifying in writing to the Contractor that it has so done, this Contract shall absolutely determine. The decision of the Owner in this regard shall be final and binding. 6.15.2 The Owner may cancel the order or a portion thereof, and if so purchase or authorize purchase of the plant/equipment not so delivered or order Plant/ Equipment of similar description (opinion of the Owner shall be final) at the risk and cost of the Contractor. 6.16 Force Majeure 6.16.1 In the event of either party being rendered unable by Force Majeure to perform any obligation required to be performed by them under this Contract, relative obligation of the party affected by such Force Majeure shall be treated as suspended during which the Force Majeure Clause lasts. 6.16.2 The term “Force Majeure” shall have herein mean riots (other than among the Contractor’s employee), Civil commotion, War (whether declared or not), invasion, act of foreign enemies hostilities, civil war, rebellion, revolution, insurrection, military coup, damage from aircraft, nuclear fission, embargoes, quarantines, acts of god such as earthquake (above 7.0 magnitude on Richter scales), lightning, unprecedented floods, fires not caused by the Contractors negligence and other causes which the Contractor has no control and accepted as such by GIPCL/GSECL whose decision shall be final and binding. Normal rainy season and monsoons are not Force Majeure. 6.16.3 Upon occurrence of such causes and upon its termination, the party alleging that it has been rendered unable as aforesaid, thereby, shall notify the other party in writing by registered notice within 24 (twenty four) hours of the alleged beginning and ending thereof giving full particulars and satisfactory evidence in support of its claim. 6.16.4 Time for performance of the relative obligation suspended by the Force Majeure shall stand extended by the period for which such clause lasts.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 182 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.16.5 If works are suspended by Force Majeure conditions lasting for more than two (2) months, GIPCL/GSECL shall have the option of cancelling this Contract in whole or part thereof, at its discretion. 6.16.6 The Contractor shall not claim any compensation for Force Majeure conditions and shall take appropriate steps to insure men and materials utilized by it under the Contract well in advance.

6.17 Progress Report of Work 6.17.1 The Contractor shall submit a weekly progress report on execution of works conforming to bar/ PERT Chart and format provided by GIPCL/GSECL. In case of any slippage(s) or delay in execution of work reasons for such delay along with details of hindrances will be submitted by the Contractor along with modified Bar/ PERT Chart mentioning the action plan being taken to keep the due date of completion of project unchanged. If required, the Contractor shall use additional manpower to keep the due date of completion of Project unchanged. 6.17.2 The authorized representative of the Contractor shall review the progress of the Project work every fortnight on a prefixed day at project site with GIPCL/GSECL or its representative as per the network and record the minutes. 6.18 Insurance 6.18.1 During the project period, i.e. before the Commissioning of the Project, all insurance shall be taken by the contractor and related expenses shall be borne by the Contractor. The goods supplied under the Contract shall be fully insured against the loss or damage incidental to manufacture or acquisition, transportation, storage, delivery, theft, natural or other disaster, etc. in such a manner that the Owner shall not incur any financial loss, as long as the construction of the Project continues to remain under the custody of the Contractor. 6.18.2 In case of any loss or damage or pilferage or theft or fire accident or combination of the said incidents etc. under the coverage of insurance, the Contractor shall lodge the claim as per rules of insurance. Any FIR required to be lodged to local Police Station shall be the responsibility of the Contractor.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 183 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.18.3 The Contractor shall arrange to supply/ rectify/ recover the materials even if the claim is unsettled for timely completion of the Project. The final financial settlement with the insurance company shall be rested upon the Contractor. 6.18.4 In case of any delay of the Project attributable to the Contractor, the Contractor himself in consultation with the Company should take the extension of insurance. Any financial implications shall, however, be borne by the Contractor. 6.18.5 The Contractor shall arrange for providing insurance coverage to its workmen under Workmen’s Compensation Act or similar Rules and Acts as applicable during execution of work for covering risk against any mishap to its workmen. The Contractor shall also undertake a Third Party Insurance. The Owner shall not be responsible for any such loss or mishap. 6.18.6 Comprehensive insurance is to be arranged by the Contractor during the O&M period of the Contract. 6.18.7 At the end of the term of insurance undertaken by the Contractor, the Contractor shall provide all the necessary documents to the satisfaction of the Company in order to enable the Company to take up the insurance of the Plant.

6.19 Statutory Acts, Rules and Standards 6.19.1 The work shall be executed in conformity with the relevant standard of Bureau of Indian Specification (or equivalent International Standard), Electricity Rules, 2010 (as amended up to date), Indian Electricity Act, BARC/DAE rules, Explosive Act 1948, Petroleum Act 1934, National Building Code and relevant Rules in vogue at the time of execution including operation and maintenance period. 6.20 Tools and Tackles 6.20.1 The Contractor shall provide technically suitable tools and tackles for installation & erection of Plant and Machineries conforming to relevant BIS safety and technical standards for proper execution of work. The Owner, in no way, shall be responsible for supply of any tools and tackles for implementation of the work and also to carry out operation and maintenance activities.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 184 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.21 Safety Measures

6.21.1 The Contractor shall have to provide necessary and adequate safety measures including personal protective equipment and precautions to avoid any accident, which may cause damage to any equipment/ material or injury to workmen. The Owner shall not be responsible for any such accidents. 6.22 Hazardous Material 6.22.1 Any hazardous material used during construction or used as part of the plant has to be taken back by the supplier for recycling or dumping purpose after its operating/ working life, so that it may not affect the environment or any living being. The Contractor shall comply with the State Pollution Board regulation. 6.23 Stoppage of Work 6.23.1 The Owner shall not be responsible and not liable to pay any compensation due to stoppage of work as a reaction from local public due to any undue action on the part of the Contractor causing annoyance to local people. 6.24 Hindrance Register 6.24.1 The Contractor may also maintain a Hindrance Register where reasons for delay may be recorded from time to time and at the time of occurrence of the hindrance and get it duly certified by the Project Manager or his authorized representative. 6.25 Responsibility of the Contractor 6.25.1 The Contractor shall provide guarantee and be entirely responsible for the execution of the Contract in accordance with this tender including but not limited to its specification, schedules, and annexure. The Contractor shall further provide guarantee and be responsible for the quality and workmanship of all materials and completed works, correct designs and drawings, correct delivery of material, erection, testing and commissioning including operation and maintenance. 6.26 Right of the Owner to Make Change(s) in Design 6.26.1 All designs shall be approved by GIPCL/GSECL prior to the execution of such designs. 6.26.2 The Owner shall have the right to make any change in the design, which may be necessary in the opinion of GIPCL/GSECL to make the plant and materials conform to the provisions and contents of the specification without extra cost to GIPCL/GSECL.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 185 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.27 Manuals

6.27.1 The Contractor shall supply all necessary erection and commissioning manuals, O&M manuals etc. as and when required. Six sets of test results, manuals etc. shall be submitted by the Contractor on completion of the work in hard and soft copies. 6.28 Governing Language 6.28.1 The Contract shall be written in English Language. All correspondence and documents pertaining to the Contract, which are exchanged by the Owner and Contractor, shall be written in English. 6.29 Order Amendments 6.29.1 No variation in or modification of the terms of the contract shall be made except by written amendments issued by the Owner. 6.30 Assignments or Subletting of Contract 6.30.1 The Contractor shall not, without the prior consent in writing of the Owner, assign or sublet or transfer its Contract in whole or in part, its obligations to perform under the Contract or a substantial part thereof, other than raw materials, or for any part of the work of which makers are named in the Contract, provided that any such consent shall not relieve the Contractor from any obligation, duty or responsibility under the Contract. 6.31 Subcontracts 6.31.1 The Contractor shall notify the Owner in writing of all subcontracts awarded under the Contract if not already specified in his Bid. Such notification in its original Bid or later shall not relieve the Contractor from any liability or obligation under the Contract. 6.31.2 Subcontracting a work shall not, under any circumstances, relieve the Contractor from its obligations towards the Project and the Owner. 6.31.3 In case, the Contractor engages any Subcontractor to carry out a part of the work, the Subcontractor should have requisite Government License for carrying out such part of the work. 6.32 Inspection and Testing 6.32.1 The Owner or its authorized representative including appointed Consultant for the project shall have, at all times, access to the Contractor’s premises and also shall have the power to inspect and examine the materials and workmanship of project work during GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 186 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

its manufacture, shop assembly and testing. If part of the plant is required to be manufactured in the premises other than the Contractor’s, the necessary permission for inspection shall be obtained by the Contractor on behalf of GIPCL/GSECL or its duly authorized representative.

6.32.2 The Contractor shall offer following Test / Inspection to the Owner. (i) GIPCL/GSECL may depute its Engineer or representative or hire an agency for ThirdParty Inspection, for pre-dispatch inspection at the manufacturing facility of the Contractor all items under this RFP as per applicable standards, approved QAP and documents. Samples for testing shall be drawn randomly in presence of GIPCL/GSECL/ inspecting agency from the lot offered for inspection. After Test/Inspection of the Items at factory, the Contractor is to submit the inspection & test reports to GIPCL/GSECL for review. After review of the inspection & test reports, GIPCL/GSECL will give dispatch clearance in writing. The Contractor shall not dispatch any item without dispatch clearance from GIPCL/GSECL, in writing. (ii) GIPCL/GSECL may depute its Engineer or representative or third party inspection agency for inspection during manufacture and in assembled condition prior to dispatch in accordance with the standard practice/ QAP of the manufacturer and applicable Standards, at no additional cost to GIPCL/GSECL for demonstration and performing the test/inspection. The Contractor shall raise inspection call with internal test reports in advance for all items like PV Modules, MMS, cables, SJBs, Inverters, Transformers, HT & LT switchgears, DC system, Switchyard equipments, earthing system, SCADA, RMU etc. (iii) Upon delivery of the photovoltaic modules on site, they shall be sampled randomly and

tested for performance through an approved testing agency assigned by GIPCL/GSECL. The result of such testing agency shall be binding to both the parties and shall be considered final performance measurement report for the guarantee / warrantee conditions of this contract. 6.32.3 In case of underperformance or rejection of the photovoltaic modules during above inspection or during operational life time of project, GIPCL/GSECL shall notify the Contractor of such underperformance or rejection by email or in writing. (i) Consecutively, the Contractor shall immediately replace such PV modules by supplying a new PV modules of similar specification conforming to the required performance GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 187 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

criteria and warranty to GIPCL within a period of 10 days from the date of intimation by email or written notice.

(ii) Upon receipt of the new PV module by the Company, the Contractor shall arrange to collect the rejected/defective photovoltaic module from site. (iii)The cost of transportation of the PV modules from the supplier to the site of GIPCL/GSECL, and return shall be borne by the Contractor. 6.32.4 GIPCL/GSECL shall have the right to serve notice in writing to the Contractor on any grounds of objections, which he may have in respect of the work. The Contractor has to satisfy the objection, otherwise, the Owner at his liberty may reject all or any component of plant or workmanship connected with such work. 6.32.5 The Contractor shall issue request letter to GIPCL/GSECL or his authorized representative for testing of any component of the plant, which is ready for testing at least fifteen (15) days in advance from the date of actual date of testing at the premises of the Contractor or elsewhere. When the inspection and the tests have been satisfactorily completed at the Contractor’s works, GIPCL/GSECL shall issue a certificate to that effect. However, the Owner at its own discretion may waive the inspection and testing in writing under very special circumstances. In such case, the Contractor may proceed with the tests which shall be deemed to have been made in GIPCL’s / GSECL’s presence, and it shall forthwith forward six (6) sets of duly certified copies of test results and certificates to the Company for approval of the Company. The Contractor, on receipt of written acceptance from GIPCL/ GSECL, may dispatch the equipment for erection and installation. 6.32.6 For all tests to be carried out, whether in the premises of the Contractor or any Subcontractor or the supplier, the Contractor, shall provide labour, materials, electricity, fuel, water, stores, apparatus and instruments etc. free of charge as may reasonably be demanded to carry out such tests of the plant in accordance with the Contract. The Contractor shall provide all facilities to GIPCL/GSECL or its authorized representative to accomplish such testing. 6.32.7 The Owner or his authorized representative shall have the right to carry out inward inspection of the items on delivery at the Site and if the items have been found to be not in line with the approved specifications, shall have the liberty to reject the same.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 188 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.32.8 If the Owner desires, testing of any component(s) of the plant be carried out by an independent agency, the inspection fee, if any, shall be paid by the Owner. However, the Contractor shall render all necessary help to GIPCL/GSECL whenever required free of charge. 6.32.9 The Contractor has to provide the necessary testing reports to GIPCL/GSECL as and when required. 6.32.10Neither the waiving of inspection nor acceptance after inspection by GIPCL/GSECL shall, in anyway, absolve the Contractor of the responsibility of supplying the plant and equipment strictly in accordance with specification and drawings etc. 6.32.11If any item is not found conforming to standards during test / inspection, the same shall be replaced / rectified by Contractor without any cost to Owner and shall be re-offered for inspection. 6.32.12The work is subject to inspection at all times and at all places by Owner. The Contractor shall carry out all instructions given during inspection and shall ensure that the work is carried out according to the relevant codes of practice 6.32.13Decision of the Owner in regard to the quality of work and materials and performance to the specifications and drawings shall be final.

6.33 Authorized Test Centres 6.33.1 The PV modules, inverters, transformers, panels, wires, etc. deployed in the power plants shall have valid test certificates for their qualification as per above specified IEC/ BIS Standards by one of the reputed labs of the respective equipment (preferably NABL Accredited Test Centres) in India. In case of module or other equipment for which such Test facilities may not exist in India, test certificates from reputed ILAC Member Labs abroad will be acceptable. 6.34 Delivery of Equipment 6.34.1 The Contractor shall deliver the equipment of the plant and machineries in accordance with the terms of the Contract at the time(s) to the place(s) and in the manner specified in the Contract. The Contractor shall comply with instructions that may be given by the Owner from time to time regarding the transit of the plant and material.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 189 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.34.2 Notification of delivery or dispatch in regard to each and every consignment shall be made to the Owner immediately after dispatch or delivery from the manufacturing works. The Contractor shall supply to the consignee Invoice in triplicate and packing account of all stores delivered or dispatched by him. 6.34.3 In case of any occurrence of loss or damage in transit, it shall be the liability of the Contractor to initiate or pursue the claim with the Insurance Company. It should take immediate steps to repair the damaged apparatus or replacement there to.

6.35 Liabilities during Transit 6.35.1 The Contractor shall be responsible for loss, damages, or depreciation to goods or of plant, equipment, and machineries up to delivery at the Site. 6.36 Deduction from Contract Price 6.36.1 All costs, claims, damages or expenses, which the Owner may have paid for which the Contractor is liable, will be deducted by the Owner from deposited bank guarantees or from any money due or which become due to him under this Contract or any contract are being executed elsewhere with the Owner. 6.36.2 Any sum of money due and payable to the Contractor, as per the Contract Agreement, may be appropriated by the Owner and set off against any claim of the Owner, for the payment of a sum of money arising out of or under any other contract made by the Contractor with the Company. It is an agreed term of the Contract that the sum of money, withheld or obtained under this clause by the Company, will be kept withhold or retained as such by the Owner or till this claim arising out of in the same Contract is either mutually settled or determined by the arbitrator, or by competent court, as the case may be, and that the Contractor shall have no claim for interest or damages whatsoever on this account or any other account in respect of any sum of money withheld or retained under this clause and duly notified as such to the Contractor. 6.37 Terms of Payment (For Each 75 MW Project) 6.37.1 Supply, Works and 10 years O&M: The Owner shall pay the Contractor in the following manner for supply of material and at the following time for achieving the respective milestones for the Supply. The Tender is a comprehensive EPC Contract of Supply, Works and O&M, There shall be three (3) different contract signed for supply, works

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 190 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

and O&M. However a single LoI shall be provided to the Successful Bidder. The payment terms for Supply, Works and O&M is given below.

Terms of payment for Supply Sr.

1.

Payment Milestones

Amount

Advance Payment (10% of Supply Price excluding taxes & duties) against 10% of Supply Price Acceptance of LOI excluding taxes & Submission of Advance Bank Guarantee of duties equivalent amount (iii) Submission of Performance Bank Guarantee (validity of minimum 27 months) -10% of the total EPC Contract Price Completion of Erection of MMS Column Post including civil 10% of Supply Price Foundation of each 5 MW or More (AC) Block (i) (ii)

2. 3.

4. 5. 6. 7.

Supply of PV Modules on pro rata basis, for each 10 MWp (Supply of PV Modules shall be as per mutually agreed schedule on sequential basis only) payment through LC upon 45% of Supply Price receipt of PV Modules at site for Domestic Modules and at any Indian Port for imported Modules Supply of BOS on each 5 MW or More(AC) Block on Pro rata 10% of Supply Price basis except Sr. No.2 Completion of Erection & installation of each 5 MW (AC) 10% of Supply Price Block Upon achieving Commissioning / COD of the Plant with 10% of Supply Price GEDA / GUVNL Upon Completion of the Facilities and Successful Performance and Operational Acceptance Test

5% of Supply Price

Note: 1. “Supply Price” is equal to the price of Supply of all equipment portion under “EPC Supply-Contract Price” (including taxes. i.e. column G of Price Schedule-A) quoted by the Contractor in its Financial Proposal. 2. Supply payment are subject to receipt of goods at site.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 191 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

3. GIPCL/GSECL may consider Option for payment through LC (INR) for Supply of PV Module. 4. Payment against supply of PV modules shall be on sequential basis after readiness of module mounting structure as indicated in best effort schedule 5. 5 MW Block capacity is indicative, Completion of One block means Completion of Erection & Installation of Complete DC Circuit and AC Circuit up to main Control Room HT panel. 6. If the Block size is different than 5 MW, payment will be considered on pro rota basis for relevant Block size.

6.37.2 Payment Terms for the Works shall be as per the following table. The Owner shall pay the Contractor in the following manner for all the erection, testing, commissioning.

Terms of payment for Works Sr.

Milestone for Works

Amount

1.

Mobilization Advance Payment: Against mobilization at site and submission of BG of equivalent amount

10 % of Contract Value of Works

2.

Against monthly RA bills for the Works executed at site

60 % of Contract Value of Works

3.

Pro-rata upon part Commissioning

10 % of Contract Value of Works

Maximum three slots 4.

Upon Successful Commissioning of the entire Project Against PV Module Bank Guarantee (if PV Module insurance is not available)

10 % of Contract Value of Works

5.

Upon Successful OAT

10 % of Contract Value of Works

Note: “Erection, Testing and Commissioning Works Price” is equal to the price of Works (all the erection, testing and commissioning works) portion of “EPC Contract Price” (including taxes) quoted by the Contractor in its Financial Proposal.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 192 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Terms of payment for Operation and Maintenance (O&M)

Sr. 1.

Milestone for Works

Amount

On Successful Operation and Maintenance of the Solar PV

Year 1: OM-1

Power Plant on quarterly basis for each year till 5 years and

Year 2: OM-2

extendable for further period of 5 years as per discretion of GIPCL / GSECL

Year 3: OM-3 Year 4: OM-4 Year 5: OM-5 Year 6: OM-6 Year 7: OM-7 Year 8: OM-8 Year 9: OM-9 Year 10: OM-10

6.38 Payments Procedure 6.38.1 Subject to any deduction which the Owner may be authorized to make under this Contract, and or to any additions or deductions provided for in this Contract, the Contractor shall be entitled to payment as follows: a. All payments shall be made in Indian Rupees (INR), unless otherwise specified in the LoI/Contract Agreement. All payment shall be made on the basis of actual measurement for the quantified items as per schedule of works. b. The Contractor shall submit the bill for claim in three copies with all supporting documents as per the Contract condition to GIPCL / GSECL. After due verification and recommendation, GIPCL/GSECL shall process verified bills for release of payment. Payments shall be released in 30 (Thirty) days by A/c payee cheque / RTGS/ NEFT from date of submission of clear invoice.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 193 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

c. The Contractor shall give complete shipping information concerning the weight, size, content of each package including any other information the Owner, may require. (1) For offshore supplies by any Bidder, following documents shall be air-mailed to the OWNER within (7) days from the date of shipment. The advance copy of these documents shall be sent through e-mail. : i.

Insurance certificates (six copies)

ii.

Bill of lading (5 non negotiable copies)

iii.

Invoice (6 copies)

iv.

Packing list (6 copies)

v.

Test certificate (3 copies)

vi.

Certificate of Origin (six copies)

vii.

One copy of the packing list shall also be enclosed in each case.

viii.

O & M Manuals &/or Catalogues

d. The Contractor shall submit the bill / invoice for the work executed showing separately GST and any other statutory levies in the bill / invoice. e. Any discrepancy and delay in submission of the above document, which result in demurrage and other charges for the consignment (for incomplete/incorrect documentation) will be to the account of the Bidder. All the formalities for custom clearance are in Bidder’s scope. (1) For onshore supply, the following documents shall be submitted through registered post to the Owner within 3 days from the date of shipment, the advance copy of these documents shall be sent through e-mail. i.

Invoice (4 copies)

ii.

LR copies

iii.

Packing list (4 copies)

iv.

Test Certificate (3 copies)

v.

One copy of the packing list shall also be enclosed in each case.

vi.

O & M Manuals &/or Catalogues

f. All taxes and deductions shall be applicable as per prevailing income tax and other statutory rules and provisions in force. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 194 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

g. In case Contractor fails to submit the invoice with all the required documents to process payments, GIPCL reserves the right to hold the payment of the Contractor against such bills. h. The Owner may consider only supply part payment for PV Modules through Letter of Credit (LC) as per the Terms of Payment specified in this tender. Respective charges for LC opening and other bank charges shall be borne by the EPC Contractor / Owner.

6.39 Warranty/ Guarantee 6.39.1 The Plant shall perform as per the Guaranteed Performance indicated by the Bidder in its Financial Proposal. 6.39.2 PV modules used in grid connected solar power plants must be warranted for peak output power at Standard Testing Condition (STC), which shall not be less than 90% at the end of ten (10) years and not less than 80% at the end of twenty five (25) years. The first year degradation shall not be more 2.5% of the PV Module capacity and in subsequent years it shall not be more than 1% per annum. 6.39.3 Defect liability: All plant equipment and components and overall workmanship of the grid solar power plants shall be warranted for a minimum of 5 years except solar PV Modules which shall be warranted for 25 years. 6.39.4 The Contractor shall ensure that the goods supplied under the Contract are new, unused and of most recent or current models and incorporate all recent improvements in design and materials unless provided otherwise in the Contract. 6.39.5 The warranty / guarantee period shall be as follows: a. Solar PV Modules: Modules shall be warranted for a minimum period of 25 years in the Bidder’s detailed Warranty/ Guarantee certificate. Same shall be furnished with its Bid. b. Inverters: Inverters shall be warranted for the guarantee period provided by the original equipment manufacturer. Same shall be furnished with its Bid. c. Transformers, associated switchgear and others: Bidder shall furnish in detail its warranties/ guarantees for these items.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 195 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.39.6 During the period of Warranty/ Guarantee the Contractor shall remain liable to replace/ repair any defective parts, that becomes defective in the Plant, of its own manufacture or that of its Subcontractors, under the conditions provided for by the Contract under and arising solely from faulty design, materials or workmanship, provided such defective parts are not repairable at Site. After replacement the defective parts shall be returned to the Contractors works at the expense of the Contractor unless otherwise arranged.

6.39.7 At the end of Guarantee period, the Contractor’s liability shall cease. In respect of goods not covered above, GIPCL/GSECL shall be entitled to the benefit of such Guarantee given to the Contractor by the original Contractor or manufacturer of such goods. 6.39.8 During the Operation and Maintenance and Guarantee period, the Contractor shall be responsible for any defects in the work due to faulty workmanship or due to use of substandard materials in the work. Any defects in the work during the guarantee period shall therefore, be rectified by the Contractor without any extra cost to GIPCL/GSECL within a reasonable time as may be considered from the date of receipt of such intimation from GIPCL/GSECL failing which GIPCL/GSECL shall take up rectification work at the risk and cost of the Contractor. 6.39.9 Material Warranty: Material Warranty is defined as: The manufacturer should warrant the Solar Module(s) to be free from the defects and/or failures specified below for a period not less than ten (10) years from the date of sale to the GIPCL/GSECL: 

Defects and/or failures due to manufacturing defects and/or failures due to materials, including PID defect

Non-conformity to specifications due to faulty manufacturing and/or inspection processes. If the solar Module(s) fails to conform to this warranty, the manufacturer will repair or replace the solar module(s), at GIPCL’s / GSECL’s sole option.

(a)

Performance Warranty: The manufacturer should warrant the output of Solar Module(s) If, Module(s) fail(s) to exhibit such power output in prescribed time span, the Contractor will either deliver additional PV Module(s) to replace the missing power output with no change in area

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 196 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

of land used or repair or replace the PV Module(s) with no change in area of land used at GIPCL’s / GSECL’s sole option. Total land available from GIPCL/GSECL is fixed and the bidder shall design the plant so that in this case he has enough space within this land to accommodate additional capacity.

6.39.10 Insurance or Bank Guarantee A) Bank Guarantee: Bank Guarantee against PV Modules Warranty: The Successful Bidder shall provide security in form of Bank Guarantee for an amount as specified in Clause No. 3.11.6 (iv) from the start date of O&M Period. However, the Bidder can submit BG valid for 5 years and further extend it for another 5 years. The BG shall be submitted prior to the return of PBG under the subject package.

B) Insurance: The PV module power output warranty as per the technical specification shall be insured and backed up through an insurance policy by a reputed insurance company which will cover against the PV module power output warranty in case of insolvency or bankruptcy of the PV module manufacturer. The Bidder shall submit a suitable insurance from Third Party. 6.40 Arbitration 6.40.1 All matters, questions, disputes, differences and / or claims arising out of and / or concerning, and /or in connection with, and /or in consequence of, and /or relating to this contract which may arise between the parties in connection with the Contract or any matter arising out of or in relation thereto shall be reported to Gujarat Public Work Contract Dispute Arbitration Tribunal and provision of Gujarat Public Work Contract Disputes Arbitration and Tribunal Act 1996 shall be applied as updates time to time. 6.40.2 The Contractor shall ensure that the work under this Contract shall continue during arbitration proceedings and dispute and no payments due from or payment by the Owner shall be withheld on account of such proceedings except to the extent which may be in dispute. 6.40.3 The Arbitrator may, from time to time, with the consent of the parties to the contract enlarge the time for making the award. The venue of the arbitration shall be the place

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 197 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

from which the acceptance of offer is issued or such other place as the Arbitrator, in his discretion, may determine.

6.41 Court of Competent Jurisdiction 6.41.1 The Courts of Vadodara for GIPCL/GSECL shall have exclusive jurisdiction in all matters arising under the Contract. 6.42 Law and Procedure 6.42.1 The law which is to apply to the Contract and under which the Contract is to be construed shall be Indian Law. 6.42.2 The law governing the procedure and administration of any arbitration instituted under the clause for arbitration shall be the Indian law. 6.43 Construction of Contract 6.43.1 The Contract shall in all respect be construed and operated, as a Contract as defined in the Indian Contracts Act, 1872, and all the payments there under shall be made in Indian Rupees unless otherwise specified. 6.44 Notices 6.44.1 For all purpose of the Contract, including arbitration there under, the address of the Contractor mentioned in the Bid shall be the address to which all communications addressed to the Contractor shall be sent, unless the Contractor has notified a change by a separate letter containing no other communication and sent by registered post with acknowledgement due to GIPCL/GSECL. The Contractor shall be solely responsible for the consequence of an omission to notify change of address in the manner aforesaid. 6.44.2 Any communication or notice on behalf of the Owner in relation to the Contract Agreement may be issued to the Contractor by the Owner and all such communication and notice may be served on the Contractor either by registered post or under certificate of posting or by ordinary post or by hand delivery at the option of the officer. 6.44.3 Instructions or notices to the Contractor and notices from the Contractor to GIPCL/GSECL recorded in a minute signed by the authorized representatives of both GIPCL/GSECL and the Contractor. Such notice or instruction shall be valid notice of instruction for the purpose of the Contract.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 198 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6.45 Final Bill

6.45.1 The Final EPC Bill relating to the Contract shall be prepared only after the Performance Guaranteed Test of the plant has been observed as under Clause No. Appendix 16: Procedure for Performance Testing and it will include the adjustments of all claims against the Contractor by the Owner and awarded in its favour by the arbitrator up to the date of preparation of the final bill. 6.46 Degradation of Solar Modules 6.46.1 The Contractor should warrant for the output of each Solar Module(s) for at least 90% of its actual rated capacity at Standard Testing Condition after initial 10 years and 80% of its rated capacity after 25 years upon commissioning of the Plant. 6.46.2 The derating of module should not be more than 1% in any year except for the first year of operation, which should be limited to 2.5%. 6.46.3 If, Module(s) fail(s) to exhibit such power output, the Contractor will either: a. Deliver additional PV Module(s) to replace the loss of power output with no change in area of land used;

b. Repair or replace the existing PV Module(s) with no change in area of land used; c. Compensate GSECL with an amount equivalent to the loss of revenue from the date of audit to 25th years which shall be calculated based on Net Present Value of amount of loss of revenues from the date of audit to 25th years discounted at the rate of GIPCL’s / GSECL’s cost of capital. 6.46.4 The Owner will specifically do the audit of solar PV module by third-party at any point of the operation period and in case the Contractor fails to demonstrate the value as per the maximum deration allowed then, the Contractor shall compensate as per the Clause no.6.46.3. 6.47 Risk Purchase 6.47.1 If the Contractor fails, on receipt of the LoI, to take up the work within a reasonable period or leave the work Site after partial execution of the work, GIPCL/GSECL shall have the liberty to get the work done through other agency at the Contractor’s own risk and additional cost if any. If the situation, so warrants, to compel GIPCL/GSECL to

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 199 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

cancel the LoI placed on the Contractor, it shall be liable to compensate the loss or damage, which GIPCL / GSECL may sustain due to reasons of failure on Contractor’s part to execute the work in time.

6.48 Confidential Information 6.48.1 GIPCL/GSECL and the Contractor shall keep confidential and shall not, without the written consent of the other Party hereto, divulge to any third party any documents, data or other information furnished directly or indirectly by the other Party hereto in connection with the Contract, whether such information has been furnished prior to, during or following termination of the Contract. Notwithstanding the above, the Contractor may furnish to its Subcontractor(s) such documents, data and other information it receives from GIPCL/GSECL to the extent required for the Subcontractor(s) to perform its work under the Contract, in which event the Contractor shall obtain from such Subcontractor(s) an undertaking of confidentiality similar to that imposed on the Contractor. 6.48.2 Notwithstanding the generality of the foregoing Clause 6.48.1 all maps, plans, drawings, specifications, schemes and the subject matter contained therein and all other information given to the Contractor, by the Company in connection with the performance of the Contract shall be held confidential by the Contractor and shall remain the property of the Company and shall not be used or disclosed to third parties by the Contractor for any purpose other than for which they have been supplied or prepared. The Contractor may disclose to third parties, upon execution of secrecy agreements satisfactory to the Company, such part of the drawings, specifications or information if such disclosure is necessary for the performance of the Contract under this Clause of 6.48. 6.48.3 Maps, layouts and photographs of the unit/integrated plant including its surrounding region's showing vital installation for national security shall not be published or disclosed to the third parties or taken out of the country without prior written approval of the Company and upon execution of secrecy agreements satisfactory to the Company with such third parties prior to disclosure. 6.48.4 Title to secret processes, if any, developed by the Contractor on an exclusive basis and employed in the design of the unit shall remain with the Contractor. The Company shall hold in confidence such process and shall not disclose such processes to the third parties GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 200 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

without prior approval of the Contractor and execution by such third parties of secrecy agreements satisfactory to the Contractor prior to disclosure.

6.48.5 Technical specifications, drawings, flow sheets, norms, calculations, diagrams, interpretations of the test results, schematics, layouts and such other information which the Contractor has supplied to the Company under the Contract shall be passed on to the Company. The Company shall have the right to use these for construction erection, startup, commissioning, operation, maintenance, modifications and/ or expansion of the unit including for the manufacture of spare parts. 6.48.6 The obligation of a party under this Clause 6.48, however, shall not apply to that information which: a. now or hereafter enters the public domain through no fault of that Party, b. can be proven to have been possessed by that Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto, or c. Otherwise lawfully becomes available to that Party from a third party that has no obligation of Confidentiality. 6.48.7 The above provisions of this Clause 6.48shall not in any way modify any undertaking of Confidentiality given by either of the Parties hereto prior to the date of the Contract in respect of the Facilities or any part thereof. 6.48.8 The provisions of this Clause 6.48 shall survive Termination, for whatever reason, of the Contract. 6.49 Limitation of Liability (LLP) 6.49.1 The total liability of the Contractor under or in connection with this Tender and the consequent Contract shall not exceed the full EPC Contract Price inclusive of taxes and duties. 6.49.2 This sub-Clause shall not limit the liability in case of fraud, deliberate default/ negligence, reckless misconduct or illegal or unlawful acts by the Contractor.

--- End of Section --GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 201 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7 Special Terms and Condition 7.1

Definition

7.1.1 The General Terms and Conditions as well as the Special Terms and Conditions of the Tender are complementary to each other, and wherever there is a conflict, the Special Terms and Conditions shall prevail. 7.2

Objective of the Project

7.2.1 The main objective of this project is “Design, Engineering, Procurement & Supply, Construction, Commissioning And Comprehensive Operation & Maintenance of 2x75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant using Photovoltaic Technology of with associated Ten (10) years operation & maintenance of the same on turnkey basis at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat. 7.3

Compliance with GUVNL/GETCO/GEDA Guidelines

7.3.1 The Bidders and Contractor shall make themselves fully aware of and comply with the norms and guidelines provided by GUVNL/GETCO/GEDA if any, towards the Project. 7.3.2 The Contractor shall ensure that the Project shall comply with all the norms and guidelines of GUVNL/GETCO/GEDA if any, and subsequent clarifications or amendments issued from time to time. The Contractor is required to refer the compliance documents of GUVNL/GETCO/GEDA if any, for necessary compliances of GUVNL/GETCO/GEDA requirements. 7.3.3 In case of any conflict between the compliance of GUVNL/GETCO/GEDA and this Tender or any aspect of the Project, the Contractor shall immediately notify GIPCL/GSECL for clarity. 7.4

Project Site

7.4.1 Details of the Project Site will be as per the Annexure 1. 7.5

Scope of Service

7.5.1 The item of work to be performed on all equipment and accessories shall include but not limited to the following: a. Transportation, unloading, receiving and storage at site.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 202 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

b. Arranging to repair and/or re-order all damaged or short-supply items.

c. Final check-up of equipment and commissioning and putting the system into successful operation, feeding power to the local internal grid. 7.6

Training of GIPCL’s /GSECL’s Personnel

7.6.1 The Bidder shall provide training on Plant operations and maintenance to three (3) teams of 5-10 personnel each (Engineers and Technician/ Operators) of GIPCL/GSECL as and when requested by GIPCL/GSECL. 7.7

Mode of Execution

7.7.1 All the work shall be executed on EPC basis in strict conformity with the provisions of the Contract documents explanatory detailed drawings, specifications and instructions by the Engineer-in-Charge whether mentioned in the contract or not. The contractor shall be responsible for ensuring that works are executed in the most substantial, proper and workman like manner using the quality materials and labour throughout the job Completion in strict accordance with the specifications and to the entire satisfaction of the Engineer-in-Charge. Any discrepancy/ambiguity found during erection and commissioning at site, decision of GIPCL/GSECL will be final. 7.7.2 The entire work shall be executed on turnkey basis. Any minor item(s) not included in the schedule but required for completion of the work shall have to be carried out/ supplied without any extra cost. Such works, not listed in the schedule of works but elaborately described to perform or to facilitate particular operation(s) required for completion of the project shall be deemed to have been included in the scope of this work and the Contractor shall supply, install the same without any extra cost. 7.8

Programme of Work

7.8.1 The Contractor shall submit the programme of work within 15 days from the date of receipt of Letter of Intent. The programme shall include a Bar Chart indicating there in the starting position and completion date of each of the major items of work. 7.9

Starting of Work

7.9.1 The Contractor shall be required to start the work within 15 (fifteen) days from the date of issue of Letter of Intent and shall thereof, report to GIPCL/GSECL accordingly.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 203 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7.10 Completion Schedule

7.10.1 The time of completion and Commissioning of the Plant is Three Hundred Sixty Five Days (365) from the date of issue of Letter of Intent. The O&M Contract Period is initially for ten (10) years, which can be extended for the remaining years on sole discretion of GIPCL/GSECL at the mutually agreed rates. 7.10.2 The Contractor shall inform GIPCL/GSECL at least thirty (30) days advanced preliminary written notice and at least fifteen (15) days advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System. 7.10.3 The Contractor shall prepare the completion schedule accordingly and inconformity with provisions of technical specifications and carry out the work as per this schedule subject to “Force Majeure” conditions. The Contractor shall mobilize resources keeping in view, the above scheduled completion period. 7.10.4 The Contractor shall provide the power evacuation schedule as and when required or asked by any Central or State Government agency(s). 7.11 Site Inspection & Basis of Bid 7.11.1 The volume and quantity of work indicated in schedule of works may vary. The Contractor should visit the Site before quoting rate for civil works. After taking in to consideration all aspects of the site, condition of soil etc., the Contractor should quote for civil works. No extra claim will be entertained at post bidding stage. The foundation design of module structure and the building shall have to be approved by GIPCL/GSECL. In case of any defects arising in the building during guarantee period, the Contractor shall have to rectify the same at its own cost. 7.12 Price Escalation 7.12.1 The rate(s) quoted against the work shall remain firm during the entire Contract period. 7.13 Taxes and Duties 7.13.1 The price quoted shall be inclusive of all applicable taxes, duties, levies as applicable (as per the format of the Financial Proposal), which shall be paid on production of documentary evidences for the same. 7.13.2 Bidders shall quote the rates as well as all taxes and duties based on the concessional exemption that can be availed by the Bidder. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 204 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7.13.3 Statutory variations in the tax shall be permitted as under: (A)

Statutory variations during original contractual completion period : (i) If any increase takes place in taxes and duties due to statutory variation, then GIPCL/GSECL shall admit the same on production of documentary evidences. (ii) If any decrease takes place in taxes and duties due to statutory variation, the same shall be passed on to GIPCL / GSECL or GIPCL / GSECL shall admit the decreased rate of taxes and duties while making the payment.

(B)

Statutory variations beyond original contractual completion period : (i) If reasons for extension of contractual completion period is attributable solely to GIPCL / GSECL, the provisions of (A) (i) above shall apply. (ii) If reasons for extension of contractual completion period is attributable to Bidder, then: (a) If any increase takes place in taxes and duties due to statutory variation, then GIPCL / GSECL shall not admit the same; however GIPCL /GSECL shall admit the taxes and duties at the rate prevailing during payment of last invoice raised during original contract completion period. (b) If any decrease takes place in taxes and duties due to statutory variation, the same shall be passed on to GIPCL /GSECL or GIPCL /GSECL shall admit the decreased rate of taxes and duties while making the payment.

7.13.4 Variation on account of exchange rate will not be payable. No statutory variation shall be payable by GIPCL /GSECL on the input items. i.e. raw materials etc. 7.13.5 No statutory variation shall be admitted if the excise duty becomes payable because of exceeding of the prescribed limits for turnover of the Bidder. 7.14 Procurement of Materials 7.14.1 The Contractor shall procure all necessary material required for the project work and arrange to store them properly. Test certificate in accordance with the specifications are to be furnished by the Contractor to GIPCL /GSECL for approval in respect of the materials procured by the Contractor.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 205 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7.15 Samples

7.15.1 Apart from adhering to special provision made in the specification regarding submission of samples, the Contractor shall within fifteen (15) days of its receipt of Letter of Intent, provide to GIPCL /GSECL samples along with detailed literature of all materials it proposes to use irrespective of the fact that specific make/ material might have been stipulated. If certain items proposed to be used are of such nature that samples cannot be presented or prepared at Site, detailed literature / test certificate of the same shall be provided instead. GIPCL /GSECL shall check the samples and give his comments and/or approval to the same. 7.16 Notice of Operation 7.16.1 The Contractor shall not carry out important operation without the consent in writing of GIPCL /GSECL or his representative. For carrying out such important activity, the Contractor shall intimate to GIPCL /GSECL at least seventy two (72) hours before starting of the job. 7.17 Rejection of Materials 7.17.1 GIPCL’s /GSECL’s decision in regard to the quality of the material and workmanship will be final. The Contractors at its own cost and risk without any compensation shall immediately remove any material rejected by the Project Manager or Engineer-inCharge from the Site of work. 7.18 Power and Water Supply during Construction 7.18.1 The Contractor shall arrange for the temporary Power Supply at the site for construction purpose at its own cost. 7.18.2 Cost of water shall be as per prevailing rate and to be borne by the Contractor. 7.18.3 Cost of electricity required during construction shall be payable by the Contractor. For construction, temporary connection from Distribution Company shall be arranged by the Contractor as per applicable tariff. 7.18.4 GIPCL /GSECL shall not provide facility for storage of material, and accommodation for labours at site. The Contractor shall make his own arrangement for the same.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 206 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7.19 Labour Engagement

7.19.1 The Contractor shall be responsible to provide all wages and allied benefits to its labours engaged for execution of the project work and also to carry out Operation and Maintenance service. The Contractor shall remain liable to the authorities concerned for compliance of the respective existing rules and regulations of the government for this purpose and shall remain liable for any contravention thereof. 7.19.2 Strict adherence of various applicable labour laws like the Factories Act, Minimum Wages Act, ESI Act, Payment of Wages Act, the Workman’s Compensation Act, EPF Act, Contractor labour (Regulation & Abolition) Act,1970 and all other statutory requirements as amended from time to time to the entire satisfaction of Central/State Govt. Authorities, shall be the responsibility of the Contractor and he shall have to make good loss, if any, suffered by GIPCL /GSECL on account of default in this regard by the Contractor. 7.19.3 The contractor is encouraged to use local manpower as per the local statutory (labour) requirement, if any. 7.19.4 The successful Bidder shall obtain license under Contract Labour (Regulation &Abolition) Act 1970, read with rules framed there under and furnish the same to the Company within 15 days of the issue of Detailed order of Contract failing which the detailed order of contract shall be cancelled/terminated without any further notice and its EMD and/ or performance guarantee shall be forfeited. 7.19.5 65% of the jobs that will be created due to the projected in the supervisory and managerial cadres and 80% of the jobs that will be created in other cadres due to the project shall be filled in by employing the local persons. The expression “local person” shall mean a person domicile in Gujarat state for a minimum period of 15 years prior to applying for employment to the Contractor. 7.20 Handing Over –Taking Over 7.20.1 Each 75 MW (AC) project shall be taken over by GIPCL & GSECL upon successful completion of all tasks to be performed at Site(s) on equipment supplied, installed, erected and Commissioned by the Contractor in accordance with provision of this Tender. During handing over complete Project work, the Contractor shall submit the following for considering final payment: GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 207 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

a. All as- Built Drawings;

b. Detailed Engineering Document with detailed specification, schematic drawing, circuit drawing and test results, manuals for all deliverable items, Operation, Maintenance & Safety Instruction Manual and other information about the project; c. Bill of material; and d. Inventory of spares at projects Site. e. Copies of all warranties/guarantees. 7.20.2 Immediately after taking over of complete Plant, the same will be handed over to the Contractor for Operation & Maintenance for a period as mentioned in the Tender. 7.20.3 Handing over will be done only after Completion of Facilities and successful Operational Acceptance Test 7.20.4 Prior to the handing over, GIPCL /GSECL shall conduct a plant audit by self or the third party as per GIPCL’s /GSECL’s discretion, and any defects identified during such audits or inspection shall be rectified by the Contractor at its own cost prior to the completion of the O&M period. 7.21 Termination on the death of Contractor 7.21.1 Without prejudice to any of the rights or remedies under this contract, if the Contractor dies, the Engineer-in-Charge on behalf of GIPCL / GSECL shall have the option of terminating the Contract without compensation to the contractor. 7.22 Retired Government servants taking to Contract 7.22.1 No engineer of gazette rank or other gazette officer employed in engineering or administrative duties in the Engineering Department of the Company is allowed to work as contractor for a period of two years of his retirement from Company's service without the previous permission of the Company. This contract is liable to be cancelled if either the contractor or any of his employees is found at any time to be a person who had not obtained the permission of the Company as aforesaid before submission of the tender or engagement in the contractor's service as the case may be. 7.23 EPF 7.23.1 The contractor will deduct and deposit EPF of his labour staff/worker as applicable from time to time in his own EPF A/c code and then produce a photocopy of documentary evidence of EPF Challan with each R.A. Bill for the concerned period. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 208 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7.24 Miscellaneous

7.24.1 The project manager appointed by EPC contractor shall not be replaced without the prior written approval of GIPCL / GSECL. 7.24.2 Any project manager or member of the Contractor at Site shall be replaced within a period of forty eight (48) hours of intimation by GIPCL / GSECL without assigning any reason thereof. 7.24.3 The Contractor shall take care of all statutory, local clearance, approvals, etc. 7.24.4 All warranties on the equipment shall be in the name of GIPCL / GSECL with reference to the Clause No. 6.39. 7.24.5 The Contractor shall be responsible for claiming and retaining any subsidy and shall quote only final price and responsibility of Project registration/ applications etc. shall lie with the Bidder only. In no case, GIPCL / GSECL is responsible to provide any additional amount other than the EPC Contract Price & O&M Contract Price. 7.24.6 The Contractor shall provide arrangement for water drainage, which shall be appropriately arranged for dispersion/ evacuation as per the local statutory norms without causing any local inconvenience or hindrance. 7.24.7 The design philosophy and related specifications mentioned in this Tender are to be treated as baseline specifications. The Contractor may further improve the design of the Plant through minor modifications and execute the same contingent on GIPCL’s / GSECL’s approval of the new design or specification. 7.24.8 Based on reviewing the Project, if the progress is below expectation as judged based on GIPCL’s /GSECL’s discretion, then GIPCL /GSECL shall reduce the Scope of the Contractor in part or full and assign the same to other contractor(s) at the risk and cost of the existing Contractor. 7.24.9 The Contractor shall continue to provide all the monitoring services, licenses, software, access to all information (real-time or stored) that were been used during the O&M Contract period by the Contractor to GIPCL /GSECL at the time of hand over at no extra cost to GIPCL /GSECL for the rest of the life of the Plant.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 209 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

7.24.10The Contractor shall construct a dedicated site office including tables, chairs, functional power outlets, light, fan air conditioner, etc. for at least eight (8) people to host GIPCL’s /GSECL’s employees or authorized representatives at the time of construction of the Plant. 7.24.11Provision for installing any additional monitoring equipment to facilitate on-line transfer of data shall be provided by the Contractor. 7.24.12GIPCL /GSECL shall provided necessary support to the Contractor for the high-sea sales of the PV modules.

--- End of Section ---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 210 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 1: Format for Covering Letter

To, Shri N.K.Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

Sub: Submission of the RFP Document No. GIPCL/Solar/EPC/2017/2x75 MW (AC) Solar PV/Rev.1.0 dated 18th December, 2017 Dear Sir, We, the undersigned, have considered and complied with the "Instructions to Bidders" and have accepted the terms stipulated in the RFP documents. The scope of work to be offered by the Bidder shall include but not be limited to Engineering, Procurement, Manufacturing, Construction, Installation, Testing, Commissioning, Operation and Maintenance of a 2 x 75 MW (150 MW) (AC) Solar Photovoltaic Grid Connected Power Plant on turnkey basis at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan; in the State of Gujarat. The Successful Bidder shall be required to ensure the continuous running of plant without any interruption for a period

of

One

year.

All

the

above

shall

be

as

per

RFP

Document

No.

GIPCL/Solar/EPC/2017/2x75 MW (AC) Solar PV/Rev.1.0 dated 18th December, 2017. Also we have familiarized ourselves with the, land surface and subsurface, metrological, climatological and environmental conditions which may exist in the installations area. In full cognizance and compliance with these aforesaid conditions and the regulations of local government authorities, we the undersigned do hereby offer for the Engineering, Procurement, Manufacturing, Construction, Installation, Testing, Commissioning, Operation and Maintenance of a 2 x 75 MW (AC) grid-interactive solar photovoltaic power plant using PV technology on a turnkey basis at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan.; in the State of Gujarat for which we have Bid. The work covered under the Bid shall be completed to

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 211 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

the entire satisfaction of yourselves or your representative in conformity with the RFP documents at the prices accompanying this Bid. It is a term of our Bid that the Project shall be handed over installed, interconnected, tested, commissioned and modified and shall achieve Commissioning not later than 365 (Three Hundred Sixty Five) days from the date of LOI. This shall be the essence of the Contract between us. We further agree and stipulate as follows: 1.

Until the final Contract Documents are prepared and executed the RFP documents with any modifications, additions, deletions agreed with the Company(s) and your written acceptance thereof, shall constitute a binding Contract between us, upon terms contained in aforesaid documents and the Financial Proposal accompanying the Bid.

2.

That the Company will not supply any material. In all respects we shall be fully selfsufficient in the performance of the work.

3.

I/ We understand that you are not bound to accept the lowest of the Bid you may receive.

4.

I/ We shall make available to the Company any additional information it may find necessary or require to supplement or authenticate the qualification statement.

5.

I/ We acknowledge the right of the Company to reject our Bid without assigning any reason or otherwise and hereby waive, to the fullest extent permitted by applicable law, our right to challenge the same on any account whatsoever.

6.

I/ We understand that you may cancel the bidding process at any time and that you are neither bound to accept any Application that you may receive nor to invite the Applicants to Bid for the Project, without incurring any liability to the Applicants.

7.

I/ We further certify that in regard to matters relating to security and integrity of the country, we or any of our Associates have not been charge-sheeted by any agency of the Government or convicted by a Court of Law.

8.

I/ We further certify that no investigation by a regulatory authority is pending either against us or against our Associates or against our CEO or any of our directors/ managers/ employees.

9.

I/ We undertake that in case due to any change in facts or circumstances during the bidding process, we are attracted by the provisions of disqualification in terms of the provisions of this RFP; we shall intimate the Company of the same immediately.

10. We understand that the selected Bidder shall either be an existing Company incorporated under the Indian Companies Act, 1956 or Companies Act 2013.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 212 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

11. I/ We hereby irrevocably waive any right or remedy which we may have at any stage at law or howsoever otherwise arising to challenge or question any decision taken by the Company in connection with the selection of Applicants, selection of the Bidder, or in connection with the selection/ bidding process itself, in respect of the above mentioned Project and the terms and implementation thereof. 12. I/ We agree and undertake to abide by all the terms and conditions of the RFP document. 13. We agree to keep the bidding valid for acceptance for a period of 120 (One Hundred and Twenty) days from the due date of this tender (hereinafter referred to as validity period) and the Bid shall not be withdrawn on or after the opening of bidding till the expiration of the validity period or any extension thereof. 14. We also undertake not to vary/modify the Bid during the validity period or any extension thereof. 15. We represent that we have fully satisfied ourselves as to the nature and location of the Project having in mind the general and local conditions and other factors incidental to the performance of the works and the costs thereof. 16. We further represent that from our own investigation of the Site of the Project we have fully satisfied ourselves as to the character, quality and quantity of surface and other conditions to be encountered in the performance of the works and we understand and represent that any failure to acquaint ourselves in respect of these matters and the other factors and conditions as set forth shall not relieve us from any responsibility for estimating properly the difficulty and cost of successfully performing the works. 17. We also acknowledge and accept that you shall not pay for any discontinuance or low performance rate resulting from malfunction of / or inadequacy of our equipment, instruments or personnel. 18. We agree to return to you all reports and technical data provided for our use in preparing this Bid and in the subsequent conduct of the works. We undertake that we will not use the same for any other work/purpose. 19. We further represent that we have familiarized ourselves with all the terms and provisions of the various parts of the bidding documents and that in making our Bid, we do not rely upon any representation made by any agent or employee of yourselves in respect of the terms of the bidding documents or the nature of the performance of the works. 20. We submit this Bid with the full understanding that our Bid fully complies with all the terms and conditions of the RFP documents including Bid evaluation criteria and that no deviation/exception to the RFP documents have been taken by us. We also agree that in

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 213 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

case we have taken any exceptions/ deviations to the RFP documents, the Company will be free to reject our offer on account of such exceptions/deviations.

Dated this _________________ day of ________________ 20____ (Year) Signature: ______________________________________________

In the capacity of: _______________________________________ Duly authorized to sign Tenders for

and on behalf of (Name & Address):

_____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________

Witness: _______________________________________________________________________

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 214 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 2: Details of Bidder To, Shri N. K. Singh

Addl. General Manager (SLPP), M/s. Gujarat Industries Power Co. Ltd., PO: Petrochemicals, Dist. Vadodara-391 346 Gujarat, India.

Sub: RFP Document No. GIPCL/Solar/EPC/2017/2x75 MW (AC) Solar PV/Rev.1.0 for Development of 2 x 75 MW (150 MW) (AC) Solar Power Projects in Gujarat Solar Park, Charanka, on EPC Basis. 1. (a)

Name of the Bidder:

(b)

Country of incorporation:

(c)

Address of the corporate headquarters and its branch office(s), if any, in India:

(d)

Date of incorporation and/ or commencement of business:

(e)

GST Number (Copy Attached: Yes/No):

(f)

Income Tax Permanent Account No (Copy of PAN Attached: Yes /No):

2. Brief description of company including details of its main lines of business and proposed role and responsibilities in this Project: 3. Details of individual(s) who will serve as the point of contact/ communication for company: (a) Name: (b) Designation: (c) Company: (d) Address: (e) Telephone Number: (f) E-Mail Address: (g) Fax Number: 4. Particulars of the Authorised Signatory of the Bidder: (a) (b) (c) (d) (e)

Name: Designation: Address: Phone Number: Fax Number:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 215 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

5. Solar EPC Contracts execution capacity:

EPC Contracts executed in MW in Gujarat Current Year

Second Last Year

Last Year

EPC Contracts executed in MW in India Current Year

Last Year

Second Last Year

6. Plant Details: a) b)

Location Description

-----------------------------------------------------------------------------------

7. Details of EPC Solar Project work executed during last 3 years Sr. No.

Project details

Capacity /Size of the Plant (MW)

Year of Completion

No. of Orders in hand

8. Details of testing facilities available at works: a) List of testing equipment. b) Quality Plan for manufacturing and Tests carried out on items offered c) Details of the test organization available. 9. Describe Quality Control Organization, if any, and give the organization chart. a) Are goods offered subject to batch test, random sampling, or full 100% test for Quality check? b) Are tests carried out by factory employees or by a separate testing agency? c) Are independent quality Control Organization checks made and certificates issued? 10. Bidder to submit details of qualified manpower for design, engineering, procurement, supply, project execution expertise and experience for development of solar PV power plant. 11. Bidder to submit the company profile with organ gram, manpower details, Bidders manpower for execution of GIPCL&GSECL project.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 216 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 3: Format of Details of Similar Technical Experience INSTRUCTIONS:

A. The Bidder shall indicate similar EPC experience of grid-connected solar photovoltaic projects herein. B. The Bidder shall duly attach the Letter of Award (LOA) from the Client, Commissioning Certificate, and Certificate of Satisfactory Completion of Work from the Client. C. Projects without sufficient documentary evidence of execution, commissioning and completion as per the discretion of GIPCL / GSECL shall not be considered towards technical evaluation of the Bidder. [A] TECHNICAL INFORMATION The Bidders shall submit the following documentary evidence in support of the above criteria: a. The Bidder shall have an experience of design, supply, installation, commissioning and operation or plant installation of cumulative installed capacity of 100 MW or above in India from 1 April 2013 as on the Deadline for Submission of Bid, Out of the 100 MW, cumulative 50 MW solar PV power plants shall have been commissioned and in operation in India Sr. No.

Project details

Capacity /Size of the Plant (MW)

Year of No. of Orders Completion in hand

b. Out of the 100 MW, there must at least one solar PV power plant of 40 MW Capacity. Sr. No.

Project details

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Capacity /Size of the Plant (MW)

(Sign and Seal of Bidder)

Year of No. of Orders Completion in hand

Page 217 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

[B] FINANCIAL INFORMATION FINANCIAL DATA FOR LAST THREE AUDITED FINANCIAL YEAR Sr. No.

Description

1 2 3 4 5 6 7 8 9

Current Assets Current Liabilities Working Capital (1-2) Annual Turnover Paid up share capital Free Reserves and Surplus Net Worth of Bidder Funds Profits Before Taxes Return on Equity

FY 2014-15

FY 2015-16

FY 2016-17

Attached are copies of the last three audited balance sheets, including gall related notes, and income statements as indicated above, complying with the following: i. All such documents reflecting the financial situation of the Bidder. ii. Historic financial statements must be audited by a certified accountant and must be complete, including all notes to the financial statements. iii. Historic financial statements must correspond to accounting periods already completed and audited (no statement for partial periods shall be accepted). iv. Filling up of all information is mandatory. Not providing any information or not in line with audited reports accompanied shall make Bid liable for rejection.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 218 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 4: Format of Disclosure of PV Technology Proposed

Proposed AC Capacity for each Plot (in MW)

Proposed DC Capacity for each Plot (in MWp)

Plot -A

Plot-B1

Plot-B2

Plot-C

Total Capacity (MW)

Plot -A

Plot-B1

Plot-B2

Plot-C

Total Capacity (MWp)

:

:

PV MODULE Type

:

Manufacturer

:

Model Number

:

Module Capacity

:

No. of Cells per Module

:

No. of Modules

:

Poly-crystalline Silicon

.............................. W

PV INVERTER Type

:

Central Inverter

:

Plot -A

Plot-B1

Plot-B2

Plot-C

Plot-B2

Plot-C

Configuration in one Block and Number of Blocks/Inverter rooms

Manufacturer

:

Model Number

:

Inverter Capacity at 50 Deg C temperature

: :

.............................. kW Plot –A

Plot-B1

Number of Inverters

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 219 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

MODULE TRACKING Type

:

Select One:  Fixed  1-Axis Manual Seasonal  Other, Please specify.......................... Plot –A

Plot-B1

Plot-B2

Plot-C

Inverter Room Construction Type

Plot –A

Plot-C

Main Control Room Contraction type

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 220 of 297

Appendix5: Format for Project Execution Plan I. Division of Scope of Work Discipline/

Basic

Equipment

Engineering

Design/ Detailed

Procurement

Engineering

Supply

Project Management

Construction/ Fabrication/

Commissioning

Installation

NOTES: 1. Bidder shall clearly indicate the agency which will carry our each activity and the location of activity. 2. In case any activity is proposed with back-up consultant, Bidder shall clearly indicate role of back-up consultant. 3. Bidder to identify major equipment / items and discipline. II. DETAILED PROJECT SCHEDULE Sr.

Activity

Start Date

1.

Issue of LoI

Zero Date

End Date

2. 3. NOTES: 1. The Bidder shall ensure that the entire work is completed within 300days of issue of LoI. 2. All Start Dates and End Dates to be indicated with respect to the Zero Date, e.g. +3 Days. 3. The Bidder may use as many lines as required to satisfactorily provide the detailed project schedule. SIGNATURE OF BIDDER

----------------------------------------------------------

NAME

----------------------------------------------------------

DESIGNATION

----------------------------------------------------------

SEAL DATE

----------------------------------------------------------

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 6: Bid Evaluation Criteria (BEC) for 2 x 75 MW (AC) The Evaluated Bid Value (EBV) shall be calculated using the following parameters: Parameters Quoted by the Bidder: i. Quoted EPC Contract Price, ii. Quoted Annual Net Electrical Energy Generation Guarantee (NEEGG) at the metering point of the Plant for each year during the O&M period (of 10 years), iii. Quoted O&M Contract Price for each year during the O&M period (of 10 years), Parameters assumed constant for evaluation of each Bidder: iv. Discount Factor of 10.69% annually. v. Fixed Land Cost: Rs. 114Cr. The Evaluated Bid Value (EBV) shall be calculated using the abovementioned parameters as follows: Step 1

: Quoted EPC Contract Price at the zero th (0th) year

Step 2

: Net Present Value (NPV) of 10 years of O&M Cost quoted by the Bidder

Step 3

ADD

: Summation of quoted NEEGG for 10 years

Step 4 Step 5

: Summation of EPC Contract Price and NPV of O&M for 10 years

DIVIDE

(Sum of EPC Contract Price and NPV of each year O&M Contract Price for 10 years and Fixed Land Cost) by (Summation of quoted NEEGG for 10 years) i.e. (Step3/Step4)

The Evaluated Bid Value (EBV) shall be the Net Present Value (NPV) as calculated above. Evaluated Bid Value (EBV) = [(EPC Contract Price ) + (NPV of each year O&M Contract Price of 10 years of) + (Land Cost x No. of MW) ] ∑NEEGG of 10 years GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 222 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

The Bidder with the lowest EBV in Rs. / kWh shall be the Successful Bidder. EXAMPLE: The following example will further clarify the methodology of comparison: Note: Figures quoted by Bidder are in Box . For 150 MW Derived/ Evaluated Figures

Figures Quoted by Bidder 1 EPC Price Year

0 1

: Rs.

465

Crore

NEEGG

O&M Cost

(in kWh)

(Rs.)

NA

NA

285,000,000

2

282,150,000

3

279,328,500

4

276,535,215

5

273,769,863

6

271,032,164

7

268,321,843

8

265,638,624

23,250,000 24,412,500 25,633,125 26,914,781 28,260,520 29,673,546 31,157,224 32,715,085

9 262,982,238 10

260,352,416

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

34,350,839

NPV of each year O&M Contract Price for the Project (in Rs.)

Rs. 18,54,65,955

36,068,381

(Sign and Seal of Bidder)

Page 223 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Total

272,51,10,862

29,24,36,001

EBV (in Rs/ kWh) without Land Cost

2.1927

For 150 MW Derived/ Evaluated Figures

Figures Quoted by Bidder 2 486.0

Crore

NEEGG

O&M Cost

(MU)

(Rs.)

NA

NA

1

315,000,000

19,440,000

2

311,850,000

20,412,000

3

308,731,500

21,432,600

4

305,644,185

22,504,230

5

302,587,743

23,629,442

6

299,561,866

24,810,914

7

296,566,247

26,051,459

8

293,600,585

27,354,032

EPC Price Year

: Rs.

9

28,721,734 290,664,579

10

287,757,933

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

154,99,96,04

30,157,821

Total 3,011,964,637

NPV of each year O&M Contract Price for the Project (in Rs.)

24,45,14,231

EBV (in Rs/ kWh) without Land Cost

(Sign and Seal of Bidder)

2.0435

Page 224 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Result: EBV of Bidder 1 = [(465,00,00,000+18,54,65,955+ 150x 7600000] / 272,51,10,862 = Rs/kWh 2.1927 EBV of Bidder 2 = [(486,00,00,000+ 15,49,99,604+ 150x 7600000] / 301,19,64,637 = Rs/kWh 2.0435   

EBV in Rs/kWh of Bidder 1 is Rs. 2.1927 per kWh. EBV in Rs/kWh of Bidder 2 is Rs 2.0435 per kWh. EBV of Bidder 1 is higher than Bidder 2.

Bidder with lower EBV in Rs./kWh shall be L-1 and Bidder with higher EBV will be L-2. Hence, in the above Bidder 2 would be preferred as the Successful Bidder (L-1) compared to Bidder 1. NOTE: This is only example. Complete project of 4 plots would be given to one single Bidder. There is an e-Reverse Auction after opening of the Financial Bid where the Bidder has to give discount as per the procedure of the e-Reverse Auction.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 225 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 7: Submission of Technical Document A) Technical Documents to be submitted along with the technical bid (Soft copy as well as Hard copy) 1. 2. 3. 4. 5. 6.

Plant single line diagram DC Capacity AC Capacity Inverter Block size Configuration MMS (fixed or tilting) PV syst Report (As per quoted 1styear NEEGG)

Details of Major Equipments / Items (To be submitted with Bid) Sr. No.

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.

Description

Make

Model

Capacity / Rating

PV Modules String Junction Boxes (SJBs) DC Cables PCUs / Inverters Inverter Transformer AC Cables HT Panel / Switchgear LT Panel / Switchgear Control and Relay Panel SCADA System Weather Monitoring System Power Transformer 66 KV Switchyard at developer end

B) Technical Documents to be submitted after award of Contract: 1. Stadd Pro software file soft copy for Civil Foundation and Structure for verification of Civil & Structure design with third party. 2. Plant Layout 3. Control room layout drawing 4. Inverter room layout drawing 5. Civil MMS foundation drawing 6. Cross section drawing of road 7. Cross section drawing of fencing 8. MMS drawing along with weight 9. Detailed schematic drawings of control and protection circuit for Inverter, LT panel etc.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 226 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

10. Bill of Material shall include item description, type, weight, quantity, make, part / model number, specification etc. for all equipments / items supplied for the project 11. Internal and external General arrangement layout for inverter, etc. 12. Installation manual for all equipments supplied under this RFP 13. Operation and maintenance manual for all equipments supplied under this RFP 14. Earthing drawings for all equipments supplied under this RFP 15. Parameter settings of inverter 16. Technical datasheets, GA Drawings ,system design documents/philosophy for all equipments supplied under this RFP 17. List of sub-vendors for all the Bill of Material items related to materials detailed drawings of foundations. 18. MQP,QAP and testing procedure for all equipments supplied under this RFP 19. Detailed activity-time chart for entire project implementation indicating Start Date and End Date for each activity. 20. Any other documents required for project not mentioned above 21. Detailed manpower deployment schedule. All documents / drawings shall be submitted in PDF as well as editable format like AutoCAD, excel, word etc, as per requirement by GIPCL/GSECL. i)

PV Module

Documents to be submitted after award of Contract in Soft copy and Hard Copy: 1. As Built GA drawing of PV module indicating detailed dimensions, location of Junction box, DC cable length, details of mounting holes, etc. 2. Datasheets for electrical and mechanical properties indicating all the parameters specified in the detailed Scope of Work. 3. Performance data at STC as well as NOTC. 4. Graphs indicating: a. Efficiency v/s. Temperature at incident irrad. For 200W/m2, 400 W/m2, 600W/m2, 800W/m2, 1000W/m2. b. Efficiency v/s. Incident radiation at STC condition. c. I-V curves at various temperatures like STC, 6 º C, 25 º C, 35 º C, 46 º C as well as at various incident radiation for 200W/m2, 400 W/m2, 600W/m2, 800W/m2, 1000W/m2. d. Temperature Vs Power at incident radiation. For 200W/m2, 400 W/m2, 600W/m2, 800W/m2, 1000W/m2. 5. IEC certificates and other certificate as applicable. 6. Certificate of PV Cell and PV Cell QC documents from original cell manufacture applicable to PV Modules supplied under this contract. 7. Installation Manual

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 227 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

ii)

8. List of Sr. No. / RFID as per details mentioned in tender specification in Scope of Work for PV Modules. 9. Warrantee & Guarantee Certificate 10. O & M Manual PCU: Technical Documents to be submitted

The following support documents shall be submitted as part of its Scope of Work: 1. Datasheets for electrical and mechanical properties indicating all the parameters specified in the Scope of Work. 2. Performance data at STC 3. Graphs indicating: a. Efficiency and AC output v/s. temperature b. Efficiency v/s. AC output incident radiation at STC and NOTC c. Efficiency and output curves at various incident radiation d. Pout AC v/s. Pin DC e. Efficiency profile v/s. Input power 4. IEC certificates 5. Compliance certificate as per GETCO/GUVNL/GEDA/MNRE/DISCOM requirements 6. Warranty documents 7. Installation manual 8. SLD of inverter showing switches, breakers, no of inputs, configuration etc. Further following details to be filled by the Bidder after award of contract: A.

Minimum guaranteed performance parameters

1 2 3

Manufacture Make of PV Cell with country of origin Model

4 5 6 7 8 9

Type (Type of Technology) Annual manufacturing capacity Annual Manufacturing/importing capacity for cell supplier. Annual Booked capacity complete Annual booked capacity for offered model Last year MW sell of the modules of Above offered model Quantity of Modules 1. For more than 300 Wp Power rating under standard testing conditions(STC) i.e. AM 1.5, 1000 W/m2OR 1500W/m2, 25OC of cell temperature Power rating under PTC( PVUSA (Photovoltaic Utility scale application)Test condition) Tolerance in power rating

10 11 12 13

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Information to be filled in by the Bidder

Page 228 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

14 15 16 17 18 19 20 B. 1 2 3 4 5 6 7 8 9 C. 1 2 3 4 5 6 7 8 9 D. 1 2 3 4 5 E. 1 2 3 4 5

Rated Power per Square meter (watts) of module Module Efficiency at STC Temperature co-efficient of power (%/OC) Permitted module temperature under continuous duty Module efficiency under irradiance of 200 W/m2, 25 OC and AM 1.5 Power rating at Normal Cell Operating Temperature (OC) Series Fuse Rating (amps) General Electrical Characteristics under STC Voc (Open circuit voltage at STC) Isc (Short circuit current at STC) Vmp (Voltage at maximum power point at STC) Imp (Current at maximum power point at STC) Individual cell voltage, current ,power & efficiency No of Bus bar in module Open-Circuit Voltage Temperature Coefficient (mV per degree C) Short-Circuit Current Temperature Coefficient (mA per degree C) Fill factor(Shall be ≥0.75) Guaranteed overall design specifications General module configuration Maximum system voltage Maximum reverse current Structural strength for sustaining wind/snow load Permitted module temperature on continuous duty Front glass Module frame material Weather module frame is anodized? (YES/NO) Encapsulants/sealants Junction box No. Of bypass diodes Diode ratings Moisture trap IP Protection Voltage drop in diode Module connecting cable Type of conductor Size of the conductor Electrical ratings Environment characteristics Length

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 229 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

6 F. 1 2 3 4 5 G 1 2 3 4 5 6 7 8 9 10 11 12 H 1 2 3 4 5

Electrical ratings Cable connector Type Electrical ratings Compatibility Contact resistance IP Protection Physical parameter of module Length in mm Width in mm Depth in mm Module area in sq. Meter Rough module area in sq. Meter Sensitive area (cell) in sq. Meter Cell size in mm Total number of Cells in module Cells in series Cells in parallel Cells in series per bypass diode Weight in Kg Commercial Material/product Warranty(years) First year degradation(Max % to be quoted) Standard degradation per year after first year (%) Power warranty (years) Insurance if any for modules for complete life time

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 230 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 8: Details of Qualified Technical Staff

Sr.

Name

No.

Relevant

Additional

Total Years

Qualification

Certifications

of Relevant

Remarks

Experience

1. 2. 3. 4. 5. 6.

Note: Kindly submit copies of resumes and appropriate certifications with this sheet. Additional sheets may be used to provide accurate information.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 231 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 9: Declaration of Compliance Date: To, Shri N. K. Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

Sub: Declaration of Compliance for the Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid Interactive Power Plant using Photovoltaic at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan.; in the State of Gujarat on EPC basis. Dear Sir, This is to certify that I, _______________________________________________________, am the duly authorized signatory appointed on behalf of my organization to submit this Bid. The authorization letter is attached herewith. I agree to all the terms and conditions set forth in this RFP Document. If awarded the job, the job work shall also conform to the terms and conditions, as well as specifications indicated in the RFP documents and as finally indicated by the Evaluation Committee. I further certify that all the information provided in this document is accurate to the best of my knowledge. Signature: _______________________________

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

Designation:__________________________

(Sign and Seal of Bidder)

Page 232 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Name: _________________________________

Organization: _________________________

Address: ________________________________

Phone: ________________________________

Email: __________________________________

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 233 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 10: No Deviation Certificate Date: To Shri N. K. Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

Sub: No Deviation Certificate regarding Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid Interactive Power Plant using Photovoltaic at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan; in the State of Gujarat. Dear Sir,

We,

__________________________________________________________________

(Bidder’s name), confirm our acceptance to all terms and conditions mentioned in the RFP Document, and all subsequent clarifications, in totality and withdraw all deviations raised by us, if any. ________________________________________________ SEAL AND SIGNATURE OF BIDDER

Date: ________________________________________

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 234 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 11: Declaration on Bidder's relation to Directors Date: To, Shri N. K. Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India Sub: Declaration of relationship with Directors/any other employee/associates. Dear Sir, This has reference to our proposed Contract regarding Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid Interactive Power Plant using Photovoltaic at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan.; in the State of Gujarat to be entered into Agreement with Gujarat Industries Power Company Limited / Gujarat State Electricity Corporation. For the purpose of Section 297/299 of the Companies Act, 1956 we certify that to the best of my/our knowledge; i)

I am not a relative of any Director of GIPCL / GSECL;

ii)

We are not a firm in which a Director of GIPCL / GSECL or its relative is a partner;

iii)

I am not a partner in a firm in which a Director of GIPCL /GSECL, or its relative is a partner;

iv)

We are not a private company in which a Director of GIPCL /GSECL is a member or director;

v)

We are not a company in which Directors of GIPCL /GSECL hold more than 2% of the paid-up share capital of our company or vice-versa. ______________________________________ Authorised Signatory of the Contracting Party Place: Date:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 235 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 12: Format of Power of Attorney as Authorized Signatory (On a non-judicial stamp paper of appropriate value)

Know all men by these presents, We … (name of the firm and address of the registered office) do hereby irrevocably constitute, nominate, appoint and authorise Mr. /

Ms

(Name), son/daughter/wife of ……………………………… and presently residing at ………………………………….., who is presently employed with us and holding the position of ………………………….., as our true and lawful attorney (hereinafter referred to as the “Attorney”) to do in our name and on our behalf, all such acts, deeds and things as are necessary or required in connection with or incidental to submission of our Bid for the Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid Interactive Power Plant using Photovoltaic at Solar Park, Village Charanka, Taluka Santalpur, District Patan; in the State of Gujarat, pursuant to the RFP document no. ______________________ issued by Gujarat Industries Power Company

Limited

(“GIPCL”)

/

Gujarat

State

Electricity

Corporation

Limited

(“GSECL”),including but not limited to signing and submission of all applications, Bids and other documents and writings, participate in Bidders’ and other conferences and providing information / responses to the Company, representing us in all matters before the Company, signing and execution of all contracts including the Contract Agreement and undertakings consequent to acceptance of our Bid, and generally dealing with the Company in all matters in connection with or relating to or arising out of our Bid for the said Project and/or upon award thereof to us and/or till the entering into of the Contract Agreement with GIPCL/GSECL. AND we hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds and things done or caused to be done by our said Attorney pursuant to and in exercise of the powers conferred by this Power of Attorney and that all acts, deeds and things done by our said Attorney in exercise of the powers hereby conferred shall and shall always be deemed to have been done by us. IN WITNESS WHEREOF WE, ………………………….., THE ABOVE NAMED PRINCIPAL HAVE

EXECUTED

THIS

POWER

OF

ATTORNEY

ON

THIS

……………………… DAY OF…………………….., 20.…..

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 236 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

For……………………………..

(Signature, name, designation and address) Witnesses:

1. 2.

Accepted

Notarised

(Signature, name, designation and address of the Attorney) Notes: 1. The mode of execution of the Power of Attorney should be in accordance with the procedure, if any, laid down by the applicable law and the charter documents of the executant(s) and when it is so required, the same should be under common seal affixed in accordance with the required procedure. 2. Wherever required, the Bidder should submit for verification the extract of the charter documents and documents such as a board or shareholders resolution/ power of attorney in favour of the person executing this Power of Attorney for the delegation of power hereunder on behalf of the Bidder. 3. For a Power of Attorney executed and issued overseas, the document will also have to be legalised by the Indian Embassy and notarised in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention, 1961 are not required to be legalised by the Indian Embassy if it carries a conforming Apostle certificate. 4. This format for Power of Attorney is for reference and in case a Bidder has a different format approved by their management then the same can submitted.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 237 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 13: Format of Summary of Audited Financial Statements To Shri N. K. Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

Sub: Summary of Financial Statement Ref:

Request for Proposal for Bid for Design, Engineering, Supply & Procurement,

Construction, Commissioning And Comprehensive Operation & Maintenance of 2 x 75 MW (AC) Grid-Connected Solar Photovoltaic Power Plant at Gujarat Solar Park, Charanka, Gujarat Dear Sir,

This is to certify that .................. [Insert name of Bidder] (The “Bidder”) having its Registered Office at.......................................... [Insert Registered Address of the Bidder] with PAN No. ...................... [Insert PAN No. of the Bidder] is in the business of....................................... [Insert briefly the nature of the business], has recorded the following turnovers and net worth: Financial Year

Turnover

Net Worth

For Official Use Only

(in INR)

(in INR)

Audited Statement Attached?

2016-17

Yes / / No

2015-16

Yes / No

2014-15

Yes / No

2013-14

Yes / No

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 238 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

All figures indicated herein are arrived from the Audit Reports of the Bidder duly submitted to the Income Tax Department.

Sincerely yours,

...................................................... [Official seal of the Chartered Accountant]

Date:

[Insert Name of the Chartered Accountant] [Insert address and contact information of the Chartered Accountant]

[Insert Date]

Place: [Insert Place] All figures indicated herein are calculated as per the guidelines mentioned in the Tender. NOTES:

A. If the Bidder is seeking financial qualification based on the financial standing of the Parent Company, then a similar certificate summarizing the financial statement of the Parent Company shall be attached by the Bidder as a part of the Bid. B. All audited statements to be attached by the Bidder as a part of the Bid. ---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 239 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 14: Format of Authorization by Parent Company [On the Official Letterhead of the Parent Company]

[Reference No.] From: [Name of Parent Company] [Address of Parent Company] [Date]

To Shri N. K. Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

Sub: Authorization of use of financial capability by Parent Company Ref:

Request for Proposal for Bid for Design, Engineering, Supply & Procurement,

Construction, Commissioning And Comprehensive Operation & Maintenance of 2 x 75 MW (AC) Grid-Connected Solar Photovoltaic Power Plant at Gujarat Solar Park, Charanka, Gujarat

Dear Sir,

A. With reference to RFP No………., we confirm that we hold........... [Insert percentage of share held in words] percent ([Insert percentage of share held in figures] %) share in M/s. ................... [Insert Name of the Bidder].

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 240 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

B. We confirm that M/s. ................... [Insert Name of the Bidder] is authorized by us to use our financial capability for meeting the financial criteria as specified in the Tender, meeting all the provisions including but not limited to terms and conditions of the Tender and undertaking the Scope of Work as defined in the Tender. C. We further confirm that we shall by jointly and severely be held responsible for the performance of M/s. ................... [Insert Name of the Bidder] as per the various provisions including but not limited to the terms and conditions in undertaking the Scope of Work as defined in the Tender. D. Our financial summary is attached as a part of the Bid submitted by................... [Insert Name of the Bidder] as per the appropriate format indicated in the Tender.

For and on behalf of................... [Insert Name of Parent Company]

[Signature and Stamp of any Whole-Time Director] Name: [Insert name of the Whole-Time Director] Place: [Insert Place] Date:

[Insert Date]

[NOTE:

A. The Authorization of use of financial capability by Parent Company shall be supported by a specific Board Resolution of the Parent Company satisfactorily conveying the same.] ---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 241 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Appendix 15: Format of Financial Proposal To Shri N. K. Singh Addl. General Manager (SLPP) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

Sub: Financial Proposal for Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat. Dear Sir,

I,________________________________________________________________________, present the Financial Proposal for the “Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic GridConnected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat” on EPC basis through the Tender Document No. “Tender No. GIPCL/Solar/EPC/2017/2x75 MW (AC) Solar PV/Rev.1.0”confirming that: i.

I agree to all the terms and conditions set forth in this Tender Document. If awarded the Project, the implementation of the Project shall also conform to the terms and conditions, as well as specifications indicated in the Tender Document and as finally indicated by the Evaluation Committee.

ii.

Rates quoted in this Bid is for destination prices inclusive of all taxes, levies, duties, packing, forwarding, freight, insurance, loading, unloading, supply, installation, commissioning, and any/all charges for successful Engineering, Supply & Installation,

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 242 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Construction, Comprehensive Operation and Maintenance of “Project” at the Site. The break-up of taxes considered are also furnished in price bid. iii.

Rates quoted in this Bid are inclusive of taxes and duties. The statutory variation in taxes shall be admissible in accordance with the Clause no. 7.13 Taxes and duties of Tender Document. Under no circumstances shall escalation in the prices of this Tender Document shall be entertained.

iv.

The details quoted herein stand valid for at least 120 days from the date of opening of the Price Bid.

SCHEDULE OF PRICE

All Schedules of Prices to be submitted online only Submission Due Date: (As per Bid Submission Instruction of RFP)

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 243 of 297

Table 15A: SCHEDULE OF PRICE –A (BREAK-UP OF PRICE FOR SUPPLY OF EQUIPMENTS)

Sr.

Price for 75

Freight &

Custom

Other Taxes

MW (AC)

Transportation

Duties

(Without taxes

(if

& duties)

applicable)

GST

Loading of

Final Price For 75

Total Final Price

& Duties

Antidumping

MW (AC) SPV

For 2 x 75 MW

(if applicable)

Duty for Solar

Plant

(AC) SPV Plant

(G) =

(H) = (2 x G)

PV Modules (Lump sum)**

Item

No.

(A)

(B)

(C)

(D)

(E)

(F)

(A+B+C+D+E+F) (In Rs.) 1

Supply of PV Modules

2

Supply of Inverters

3

Supply of MMS

4

Supply of Civil items

5

66 kV Underground Cable from PLOT-A, PLOT-B1, PLOT-B2 and PLOT-C

6

Supply of Balance of System includes all equipment, materials, accessories etc. (excluding Sr.no.1 to 5)

7

Total (Rs.) 7 = (1+2+3+4+5+6)

(In Rs.)

(In Rs.)

(In Rs.)

(In Rs.)

(In Rs.)

(In Rs.)

(In Rs.)

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017. 8

Solar Photovoltaic Grid-Connected Power

“Supply Price" quoted by the Bidder [in Words as per column (7H)]

Note: ** Bidders have option to load Anti-Dumping Duty (ADD) in price bid for solar PV modules only, in case anti-dumping duty is mentioned same shall be included in total EPC price for bid evaluation purpose. Payment of Anti-Dumping Duty: a)

If antidumping duty is imposed and becomes applicable before supply of PV Modules which shall be completed within maximum 7

months from the date of LOI in such case, GIPCL/GSECL shall reimburse Anti-dumping duty on actual basis based on supporting documents/payment receipt by contractors or anti-dumping duty mentioned at “F” whichever is lower. If it is not mentioned in Colum (F), it will be considered as zero. b)

In case contractor fails to supply PV Modules within 7 months from the date of LOI, reimbursement of Antidumping Duty shall not be

payable.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 245 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75MW (AC) Plant at Gujarat Solar Park, Village Charanka, Taluka Santalpur, District Patan, Gujarat; 18th December,2017.

Solar Photovoltaic Grid-Connected Power

Table 15A: SCHEDULE OF PRICE –B (BREAK-UP OF COST FOR CONSTRUCTION, ERECTION, TESTING, COMMISSIONING & COD with GEDA/GUVNL)

Sr. No.

Price / 75 MW (AC) (without taxes & duties)

GST

Other taxes & duties (if any)

(A)

(B)

(C)

(In Rs.)

(In Rs.)

(In Rs.)

Final Price For 75 MW (AC) SPV Plant

Total Final Price For 2 x 75 MW (AC) SPV Plant

(D)=(A+B+C)

(E) = ( 2 x D)

(In Rs.)

(In Rs.)

Item

1

General works including construction, erection, testing, commissioning, COD with GEDA/GUVNL etc. of entire plant as per details specified in the Tender documents, on EPC Basis.

2

“Works Price” quoted by the Bidder: (in Words) (=TOTAL Final Price as per Column (1E)

Note: 1. EPC cost with taxes and duties shall be considered for evaluation of bid. Thereafter e-Reverse Auction shall be done. 2. No variation due to change in forex rate shall be admissible. 3. Payment shall be made in Indian National Rupees (INR) only. Bidder(s) has to quote their rate in INR only. 4. Arithmetical errors will be rectified on the following basis: If there is a discrepancy between words and figures, the amount written in words will prevail. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December, 2017.

(Sign and Seal of Bidder)

Page 246 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat.

Table 15B: Price Quote for O&M Contract (For 2 x 75 MW (AC) Projects)

(BREAK-UP OF COST FOR O & M AND NEEGG FOR 2 X 75 MW (AC) )

Sr. No.

Head

Annual Rate for Comprehensive O&M (each year “O&M Contract Price”) (A)

Taxes & Duties (B)

O&M charges including taxes (C=A+B)

Discou

NPV of

nting

O&M

factor

charge

NEEGG

for

s

(D)

NPV @10.69

(F=CxE)

% (E)

(In Rs.) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11 12

13

(In Rs.)

O & M for First Year. O & M for Second Year. O & M for Third Year. O & M for Fourth Year. O & M for Fifth Year. O & M for Sixth Year. O & M for Seventh Year. O & M for Eighth Year. O & M for Ninth Year. O & M for Tenth Year. TOTAL (In Figures) TOTAL Rate for Comprehensive O&M including all taxes “ Total O&M Contract Price” (In Words) –(As per Column 11C)

(In Rs.)

(In kWh)

(In Rs.) 1 0.9034 0.8162 0.7374 0.6661 0.6018 0.5437 0.4912 0.4437 0.4009

TOTAL NEEGG (In Words) – ( As per Column 11D)

# All applicable taxes including service tax and any surcharge or cess thereon are included in the quoted number. Signature:______________________________ Name: ________________________________

Designation: _______________________

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Address: _______________________________ __________________________________ ______________________________________

Seal of Company / Organization:

______________________________________

Phone: ____________________________

Email: _____________________________________________________________________

Note: 1. The Rate for Comprehensive O&M including all taxes for subsequent year shall not be more than 5% of the previous year. E.g. The Rate for Comprehensive O&M including all taxes of 3rd Year shall not be more than 5% of the 2nd Year. 2. O&M Contract after 10th year shall be mutually decided by the Contractor and GIPCL/GSECL.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 248 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix 16: Procedure for Performance Testing

Part A: Solar PV power plant Net power generation 1. The Contractor shall quote the ‘Net Electrical Energy Generation Guarantee” for annual basis considering the Reference Global Average Radiation indicated in this Tender. 2.

The Contractor shall demonstrate “Actual Delivered Energy” at metering point (GETCO end sub-station) as compared to the ‘Base NEEGG’ for every year from the date of starting of O&M Period.

3. The quoted NEEGG as in Table no. 15 B in Appendix 15 for any year shall be permitted with maximum 1 % degradation factor in previous year generation. 4. The quoted NEEGG will be used for the calculating CUF. 5. The Bidder shall clearly mention the technology used i.e. fixed/tilt or seasonal tracker (please specify) as per Table given in Appendix 4. Part B: Operational Acceptance Test Procedure Performance Ratio (PR) - Test Procedure 1. Performance Ratio as determined through the PR Test Procedure specified here should not be less than 0.75 for Operational Acceptance Test. 2. The Performance Ratio Test to prove the guaranteed performance parameters of the power plant shall be conducted at site by the Contractor in presence of the Owner. The Contractor's Engineer shall make the plant ready to conduct such tests. The Operational Acceptance Test shall be commenced, within a period of one (1) month after successful Commissioning and, there will be continuous monitoring of the performance for 30 days. Any extension of time beyond the above one (1) month shall be mutually agreed upon. These tests shall be binding on both the parties to the Contract to determine compliance of the equipment with the guaranteed performance parameters. This monitoring will be performed on the site under the supervision of the Owner/ Owner's engineer. 3. The test will consist of guaranteeing the correct operation of the plant over 30 days, by the way of the efficiency rate (performance ratio) based on the reading of the energy produced and delivered to the grid and the average incident solar radiation. During this period of 30 days, any 5 (five) instances of 15 (fifteen) minutes shall be taken to calculate the instantaneous Performance Ratio of 15 minutes block as per the formula given below in

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 249 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Point No. 5. If the PR of these fives instances is above 75%, then Operational Acceptance Test (OAT) shall be considered successful.

4. PR shall be demonstrated against the installed DC Capacity. 5. The Efficiency or performance ratio (PR) of the PV Plant is calculated as follows (according to IEC 61724) Performance Ratio (PR) = YA / YR Where; YA = Final (actual measured) PV system yield in kilo-watt hours at the point of measurement during the testing period, and YR = Reference yield calculated as the product of the insolation on the plane of the collector (i.e. PV modules) in kWh/ m2 during the testing period and the installed DC capacity of the plant in kW. = [Insolation on the plane of the collector (i.e. PV modules) in kWh/ m2 during the testing period] x Installed DC Capacity = (kWh/m2) x Installed DC Capacity Monitoring System for PR Verification The following instrumentation will be used to determine the Solar Plant Performance: 

Power Meter at the delivery point.

Power Meter for each inverter for reference only.

One nos. calibrated pyranometer to determine irradiance on the plane of array (with a target measurement uncertainty of ± 2).

One nos. calibrated pyranometer to determine irradiance on horizontal plane (with a target measurement uncertainty of ± 2)

Two nos. thermocouples to measure module temperature with a measurement uncertainty of ±1 °C.

Shielded ventilated thermocouple with a measurement accuracy of ±1°C.

An anemometer mounted on a 10m mast to measure wind speed (without additional shadowing on modules).

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 250 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Data measurement shall be witnessed in the format mutually agreed before the start of PR test by the employer and the contractor jointly for the said period.

The Contractor shall show the specified PR for Operational Acceptance.

Part C: The procedure for Performance Guarantee Test (PGT) - cum- Final Acceptance Test- shall be as follows: 1. A weather station with a calibrated pyranometer shall be installed by the Contractor at the location mutually agreed by the Contractor and GIPCL/GSECL. The test report for the calibration shall be submitted by the Contractor for approval by GIPCL/GSECL. The calibration should be traceable to a national/international laboratory. The output of this pyranometer for shall be logged in the SCADA system. 2. In case the pyranometer is found to be working erratically then immediately the Contractor shall take necessary steps to rectify and/or recalibrate the instrument to the satisfaction of GIPCL/GSECL. However, for the dispute period for which such error has occurred and until the instrument is recalibrated to the satisfaction of GIPCL/GSECL, data from any one of the following list of sources as decided by GIPCL/GSECL will be used: i.

A separate pyranometer installed by the Owner near the site, if available

ii.

Average of two closest solar power projects, as identified by GIPCL/GSECL

iii. Nearest MNRE weather station 3. “Actual Delivered Energy” from the plant supplied by the Contractor shall be noted for every month and summed up for entire year. For this purpose, the net delivered energy at the metering point shall be taken into account. 4. The measured value of energy at step (3) shall be compared with ‘Base NEEGG’ and hence with ‘Base CUF’ value. “Base NEEGG/ CUF” for a month is calculated by using the NEEGG quoted in the offer by the Contractor adjusted with a correction factor to take into account the actual average global solar radiation measured by the calibrated pyranometer for that year. 5. Further, if the plant is not able to achieve the calculated Base NEEGG/CUF during PGT and O&M period and there is a shortfall in energy generation, then the Contractor shall be penalized as per relevant Clause of the Tender. 6. The Contractor shall share with GIPCL/GSECL all the radiation, generation, etc. parameters details and all other factors necessary for GIPCL/GSECL to corroborate the

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 251 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

estimate. GSECL has the right to cross verify data submitted by the Contractor by all possible means/sources.

Following factors may be noted for computing the Base NEEGG/ CUF and PR Test: 7. Effect due to variation in annual insolation shall only be considered for computing the Base NEEGG/ CUF. 8. Effect due to variation of meteorological parameters e.g. ambient temperature, wind speed, humidity etc. shall not be considered. 9. Generation loss due to grid outage (or power evacuation system which is not in the scope of the Contractor): The measured global solar radiation of the period of the outage of the power evacuation system shall be excluded to calculate average global solar radiation for the period of PGT and O&M. Solar Radiation: Ideally, actual measurement of solar radiation at the site is desirable for estimating the projected power output since solar energy is the raw material for power generation. It may be noted that the annual average solar radiation measurement even for 1-2 years is not sufficient. World over, an average radiation value for at least 8-10 years is used for solar power project designing since climatic variations are quite wide year-to-year. Under such a situation, the prevailing practice world over is to develop software which uses satellite measured solar radiation and matches it with the actual ground measured data for the particular site where actual data has been obtained for many years. There are radiation data from reputed agencies like NASA available. The derived values are tabulated below: Month January February March April May June July August September October November December Annual

GHI GHI (kWh/m2/month) 130 135 176 191 207 185 157 149 156 151 127 122 1,886

Source: NASA GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 252 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

The above radiation data shall be used by the Bidder to calculate NEEGG. This radiation data is for evaluation purpose. However, for every year actual radiation shall be considered to calculate the NEEGG by the Bidder. Illustration: If the GHI of a year is more or less then the reference GHI then NEEGG will be calculated as follows: NEEGG = (Actual GHI x NEEGG guaranteed by contractor on reference GHI)/ (Reference GHI) NEEGG guaranteed by Contractor = 30,22,20,000 KWh Reference GHI= 1886 KWh/m2 per annum For Example: Case A) for higher irradiation: If Actual GHI = 1900 kWh/m2 per annum then NEEGG will be: NEEGG = (1900 x 30,22,20,000)/ 1886 NEEGG = 30,44,63,415 KWh/ Annum Case B) for lower irradiation: If Actual GHI = 1850 kWh/m2 per annum then NEEGG will be: NEEGG = (1850 x 30,22,20,000)/ 1886 NEEGG = 29,64,51,220 KWh/ Annum

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 253 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix 17: List of Banks (for Bank Guarantee)

Bank Guarantee from the following Banks will be acceptable for GIPCL SCHEDULED PUBLIC SECTOR BANKS (INDIAN)

1. State Bank of India. 2. State Bank of Bikaner and Jaipur 3. State Bank of Hyderabad 4. State Bank of Mysore. 5. State Bank of Patiala. 6. State Bank of Travancore. 7. Allahabad Bank 8. Andhra Bank 9. Bank of Baroda 10. Bank of India 11. Bank of Maharashtra 12. Canara Bank 13. Central Bank of India 14. Corporation Bank 15. Dena Bank 16. Indian Bank 17. Oriental Bank of Commerce 18. Punjab National Bank 19. Punjab and Sind Bank 20. Syndicate Bank 21. Union Bank of India 22. UCO Bank 23. Vijaya Bank. 24. IDBI Bank

SCHEDULED FOREIGN BANKS

1. 2. 3. 4. 5. 6. 7. 8.

American Express Bank Ltd. Bank of American NT&SA Bank of Tokyo Ltd. BNP Paribas Barclays Bank Plc Citi Bank NA. Deutsche Bank A.G. Hongkong & Shanghai Banking Corpn. 9. Standard Chartered Bank 10. JP Morgan Chase Bank NA

SCHEDULED PRIVATESECTOR BANKS (INDIAN)

1. 2. 3. 4. 5. 6. 7.

ING Vysya Bank Axis Bank Ltd. ICICI Bank HDFC Bank Yes Bank Indus Ind bank Kotak Mahindra Bank

 The Bank Guarantee submitted should have the clear one time validity in all respect and up to the completion period. If by any reason the Contract Period is extended, the Bidder shall undertake to renew the Bank Guarantee at least one month before the expiry of the validity failing which GIPCL will be at liberty to encash the same.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 254 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Bank Guarantee from the following Banks will be acceptable for GSECL Sr.No List of Banks (1) All Nationalized Banks including the Public Sector Bank-IDBI Ltd. (2) Private Sector Banks (AXIS Bank , ICICI Bank and HDFC Bank) (3) Banks 1 Kotak Mahindra Bank 2 YES Bank 3 Indusland Bank 4 RBL Bank (The Ratnakar Bank Ltd.) 5 Karur Vysya Bank 6 DCB Bank 7 FEDERAL Bank 8 Dena Gujarat Gramin Bank 9 The Kalupur Commercial Co-operative Bank Ltd. 10 Rajkot Nagarik Shakari Bank Ltd. 11 The Ahmedabad Mercantile Co-operative Bank Ltd. 12 The Mehsana Urban Co-operative Bank Ltd. 13 Nutan Nagrik Sahakari Bank Ltd. 14 Saurashtra Gramin Bank 15 Baroda Gujarat Gramin Bank

 The Bank Guarantee submitted should have the clear one time validity in all respect and up to the completion period. If by any reason the Contract Period is extended, the Bidder shall undertake to renew the Bank Guarantee at least one month before the expiry of the validity failing which GSECL will be at liberty to encash the same.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 255 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix18 (a): Format of Bank Guarantee for EMD

[To be on non-judicial stamp paper of Rupees One Hundred Only (INR 100/-) or appropriate value as per Stamp Act relevant to place of execution, duly signed on each page. Foreign entities submitting Bid are required to follow the applicable law in their country] Reference No. ……………. Bank Guarantee No. …………….

Dated: …………….

EMD BANK GUARANTEE FORMAT FOR TENDER /RFP No._____________ (BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.100) WHEREAS M/s. ____________________________________________ (Name and Address of the Firm) having their registered Office at _________________________________________________ (Address of the Firm’s registered Office) (hereinafter called the Tenderer) wish to participate in the Tender No.__________________________ for ______________________________________ of (supply / Erection / Supply & Erection / Work) of __________________________________ (Name of the material / equipment / work) for _________________________ Gujarat Industries Power Company Limited and WHEREAS a Bank Guarantee for (hereinafter called the “Beneficiary”) Rs. _____________ (Amount of EMD) valid till ____________ (mention here date of validity of this Guarantee) which is required to be submitted by the Tenderer along with the Tender. We, ________________________________________________________ (Name of the Bank and address of the Branch giving the Bank Guarantee) having our registered Office at _____________________ (Address of Bank’s registered Office) hereby gives this Bank Guarantee No. _________________ dated ____________ and hereby agree unequivocally and unconditionally to pay immediately on demand in writing from the Gujarat Industries Power Company Limited or any Officer authorized by it in this behalf any amount not exceeding Rs.____________ (amount of EMD) (Rupees ______________ ________________________________________) (in words) to the said Gujarat Industries Power Company Limited on behalf of the Tenderer. We, ____________________________________________ (Name of the Bank) also agree that withdrawal of the Tender or part thereof by the Tenderer within its validity or non-submission of Security Deposit by the Tenderer within one month from the date of Tender or a part thereof has been accepted by the Gujarat Industries Power Company Limited would constitute a default on the part of the Tenderer and that this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in case of any occurrence of a default on the part of the Tenderer and that the encashed amount is liable to be forfeited by the Beneficiary. This agreement shall be valid and binding on this Bank upto and inclusive of ____________________ (mention here the date of validity of Bank Guarantee) and shall not be terminated by notice or by Guarantor change in the constitution of the Bank or the Firm of Tenderer or by any reason whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or variations or alterations made, given, conceded with or without our knowledge or consent by or between the Tenderer and the Gujarat Industries Power Company Limited.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 256 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

“Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GIPCL). Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.”

NOT WITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted to Rs. _________________ (amount of EMD) (Rupees ________________________________________________ (in words). Our Guarantee shall remain in force till _____________ (date of validity of the Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before ___________ (date should be 1 month after the above validity period of BG), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under. Place: Date: (Please mention here complete Postal Address of Bank with Branch Code, Signature of the Bank’s authorized Signatory Telephone and Fax Nos) with official seal. ________________________________________________________________ INSTRUCTIONS FOR FURNISHING BANK GUARANTEE 1. The Bank Guarantee by Bidders will be given on non-judicial stamp paper as per stamp duty applicable at the place where the Tender has emanated. The non-judicial stamp paper should be in name of the issuing bank. 2. The Bank Guarantee by Bidder will be given from Nationalized/Scheduled bank as per Appendix 17 only. 3. This bank guarantee/ all further communication relating to the bank guarantee should be forwarded to Gujarat Industries Power Company Limited, PO:Petrochemicals-391346, Dist.: Vadodara, Gujarat only. 4. The full address along with the Telex/Fax No. and email address of the issuing bank to be mentioned.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 257 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix 18 (b): Format of Bank Guarantee for Security Deposit/ Performance Bank Guarantee [To be on non-judicial stamp paper of Rupees One Hundred Only (INR 100/-) or appropriate value as per Stamp Act relevant to place of execution, duly signed on each page. Foreign entities submitting Bid are required to follow the applicable law in their country] Reference No. ……………. Bank Guarantee No. …………….

Dated: …………….

(On stamp paper of Rs.100/-) FORMAT

OF

BANK

GUARANTEE

FOR

SECURITY

DEPOSIT/

PERFORMANCE.

We, Bank of _________________________________________here by agree unequivocally and unconditionally to pay immediately on demand in writing from the Gujarat Industries Power Company Limited /Gujarat State Electricity Corporation Limited or any Officer authorized by it in this behalf any amount up to and not exceeding Rs._________ (inwords) Rupees to the _________________________________________________________ said Gujarat Industries Power Company Limited / Gujarat State Electricity Corporation Limited. on behalf of M/s. ____________________________ _______who have entered into a contract for the supply/works specified below: L.O.A. No. _______________________dated This agreement shall be valid and binding on this Bank upto and inclusive of ___________________and shall not be terminable by notice or by change in the constitution of the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or variations or alterations made, given conceded or agreed, with or without our knowledge or consent, by or between parties to the said within written contract. “Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GIPCL /GSECL). Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.” “NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is restricted to Rs.__________ (Rupees ________only). Our guarantee shall remain in force until __ (Date of validity of the Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before_____ (Date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under; Place: Date:

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 258 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Please Mention here Complete Postal Address of the Bank with Branch Code, Telephone and Fax Nos.

Signature of the Bank’s Authorised two Signatories with Official Round Seal.

INSTRUCTIONS FOR FURNISHING PERFORMANCE BANK GUARANTEE 

The Bank Guarantee by Bidders will be given on non-judicial stamp paper as per stamp duty applicable at the place where the Tender has emanated. The non-judicial stamp paper should be in name of the issuing bank.

The Bank Guarantee by Bidder will be given from bank as per Appendix 17 only.

This Bank Guarantee/ all further communication relating to the bank guarantee should be forwarded to Gujarat Industries Power Company Limited, PO:Petrochemicals-391346, Dist.: Vadodara, Gujarat only / Gujarat State Electricity Corporation Limited, Vidyut Bhawan Race Course, Vadodara, Gujarat only.

The full address along with the Telex/Fax No. and email address of the issuing bank to be mentioned.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 259 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix18 (c): Format of Bank Guarantee for Performance for O&M

[To be on non-judicial stamp paper of Rupees One Hundred Only (INR 100/-) or appropriate value as per Stamp Act relevant to place of execution, duly signed on each page. Foreign entities submitting Bid are required to follow the applicable law in their country]

Reference No. ……………. Bank Guarantee No. …………….

Dated: …………….

To: Gujarat Industries Power Company Limited PO:Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

/

Gujarat State Electricity Corporation Limited (“GSECL”) Vidyut Bhwan, Race Course Vadodarar-390 007, Gujarat

Dear Sir, WHEREAS ……………. [Insert name of the Contractor] with address ……………. [Insert address of the Contractor] having its registered office at ……………. [Insert address of the Contractor] (here in after, the “Bidder”) wishes to participate in RFP document No. GIPCL/Solar/EPC/2017/2x75 MW (AC) Solar PV/Rev.1.0 issued by Gujarat Industries Power Company Limited (“GIPCL”) / Gujarat State Electricity Corporation Limited (“GSECL”) (hereinafter, the “Beneficiary”) for Operation and Management of Performance of Solar Power Project.

And WHEREAS a Bank Guarantee for Rupees […………………] valid till ……………. [Insert date for 5 years from the date of commissioning / Completion of Facility] is required to be submitted by the Contractor as per the terms and conditions of the RFP.

We,……………. [Insert name of the Bank and address of the Branch giving the Bank Guarantee] having our registered office at ……………. [Insert address of the registered office of the Bank] hereby give this Bank Guarantee No. ……………. [Insert Bank Guarantee number] dated GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 260 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

……………. [Insert the date of the Bank Guarantee], and hereby agree unequivocally and unconditionally to pay immediately on demand in writing from the Beneficiary any officer authorized by it in this behalf any amount not exceeding Rupees [……………………] to the said Beneficiary on behalf of the Bidder.

We ……………. [Insert name of the Bank] also agree that withdrawal of the Bid or part thereof by the Bidder within its validity or non-submission of further O&M Performance Bank Guarantee by the Bidder within the stipulated time of the Letter of Intent to the Bidder or any violation to the relevant terms stipulated in the RFP would constitute a default on the part of the Bidder and that this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in case of any occurrence of a default on the part of the Bidder and that the encashed amount is liable to be forfeited by the Beneficiary.

This agreement shall be valid and binding on this Bank up to and inclusive of ……………. [Insert the date of validity of the Bank]and shall not be terminable by notice or by Guarantor change in the constitution of the Bank or the firm of the Bidder Or by any reason whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or variations or alternations made, given, conceded with or without our knowledge or consent by or between the Bidder and the Beneficiary.

NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is restricted to Rupees ………………………..(Insert the Amount). Our Guarantee shall remain in force till ……………. [Insert date]. Unless demands or claims under this Bank Guarantee are made to us in writing on or before ……………. [Insert date], all rights of the Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under. [Insert the address of the Bank with complete postal branch code, telephone and fax numbers, and official round seal of the Bank]

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

[Insert signature of the Bank’s Authorized Signatory]

(Sign and Seal of Bidder)

Page 261 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Attested: ……………………………. [Signature] (Notary Public)

Place: ………………………….

Date: …………………………….

INSTRUCTIONS FOR FURNISHING BANK GUARANTEE 

The Bank Guarantee by Bidders will be given on non-judicial stamp paper as per stamp

duty applicable at the place where the Tender has emanated. The non-judicial stamp paper should be in name of the issuing bank. 

The Bank Guarantee by the Bidder shall be given from bank only given in Appendix 17.

This Bank Guarantee/ all further communication relating to the bank guarantee should be

forwarded to Gujarat Industries Power Company Limited, PO:Petrochemicals-391346, Dist.: Vadodara, Gujarat /The Chief Engineer, Gandhinagar Thermal Power Station, Gujarat State Electricity Corporation Limited, Gandhinagar, Gujarat 

The full address along with the Telex/Fax No. and email address of the issuing bank to be

mentioned.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 262 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix 19: Contract Agreement (to be entered separately with GIPCL /GSECL for their respective projects)

This agreement is made at VADODARA the -----------------day of ----------------in the Christian year Two thousand -------- between ----------------------------------------------------------(herein after referred to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant to the contract include its successors or permitted assigns) of the one part and the Gujarat Industries Power Company Ltd. Having their Head Office at PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat (hereinafter called “The GIPCL” which expression shall unless excluded by or repugnant to the context include its successors or assigns) of the other part. OR

This agreement is made at VADODARA the -----------------day of ----------------in the Christian year Two thousand -------- between ----------------------------------------------------------(herein after referred to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant to the contract include its successors or permitted assigns) of the one part and the Gujarat State Electricity Corporation Ltd. Having their Head Office at Sardar Patel Vidyut Bhavan, Race Course, VADODARA – 390 007 (hereinafter called “The GSECL” which expression shall unless excluded by or repugnant to the context include its successors or assigns) of the other part.

WHEREAS the aforesaid GIPCL/GSECL has accepted the Tender of the aforesaid contractors for -------------------------------------------------------------------------------------------------- as per GIPCL’s /GSECL’s Order No.---------------------------------------------hereinafter called “the Works” and more particularly described enumerated or referred to in the specification, terms and conditions prescribed in the Order letter, covering letter and other letters and schedule of price which for the purpose of identification have been signed by Shri ---------------------------- on behalf of the Contractors and by --------------------------on behalf of the GIPCL/GSECL a list whereof is made out in the Schedule hereunder written and all of which said documents are deemed to form part of this contract and included in the expression “ theWorks” wherever herein used, upon the terms and subject to the conditions hereinafter mentioned. AND WHEREAS THE GSECL has accepted the Tender of the contractors for the construction of the said works for the sum of Rs.-----------------------(Rupees:----------------------------------------------------------) upon the terms and subject to the conditions herein mentioned. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 263 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

NOW THIS AGREEMENT WITNESSES AND IT

IS

HEREBY AGREED AND

DECLARED THAT: (a) The contractors shall do and perform all works and things in this contract mentioned and described or which are implied therein or therefrom respectively or are reasonably necessary for the completion of the works as mentioned and at the times, in the manner and subject to the terms, conditions and stipulations contained in this contract, and in consideration of the due provision, executions, construction and completion of the works agreed to by the contractors as aforesaid, the GIPCL/GSECL doth hereby covenant with the contractor to pay all the sums of money as and when they become due and payable to the contractors under the provisions of the contract. Such payments to be made at such times and in such manner as is provided by the contract. (b) The conditions and covenants stipulated herein before in this contract are subject to and without prejudice to the rights of the GIPCL/GSECL to enforce penalty for delays and / or any other rights whatsoever including the right to reject and cancel on default or breach by the contractors of the

conditions and the covenants as stipulated in the general conditions,

specifications, forms, or Tender schedule, drawing, etc., attached with GIPCL’s /GSECL’s Order No.------------------------------------------------. The contract value, extent of supply delivery dates, specifications, and other relevant matters may be altered by mutual agreement and if so altered shall not be deemed or construed to mean or apply to affect or alter other terms and conditions of the contract and the general conditions and the contract so altered or revised shall be and shall always be deemed to have been subject to and without prejudice to said stipulation. SCHEDULE List of documents forming part of the contract: 1. 2. 3 4. 5. 6 7. 8. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 264 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

In witness whereof the parties hereto have set their hands and seals this day and month year first above written. 3. Signed, Sealed and delivered by:

(Signature with Name, Designation & official seal)

for and on behalf of M/s.__________________ In the presence of name, Full Address & Signatures. : i).

ii). 4. Signed, Sealed and Delivered by:

(Signature with Name, Designation & official seal) For and on behalf of Gujarat Industries Power Company Ltd., PO:Petrochemicals-391346,Dist: Vadodara, Gujarat

OR For and on behalf of Gujarat State Electricity Corporation Ltd., Vidyut Bhavan, Race Course, VADODARA – 390 007

In the presence of Name, Full Address & Signature: i) --------------------------------------------------------------------------------------------------

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 265 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix 20: Format for Pre-Bid Queries Sr.

Chapter No.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

Clause No.

Page No.

(Sign and Seal of Bidder)

Tender Term

Bidder’s Query

Page 266 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Appendix 21: Format for Undertaking

Bidders Name: __________________ Sr No.

Name of- Customer / Project Owner

Capacity of Project in MW (AC)

Scheduled Completion period for Commissioning as per Contract in (Months)

Actual Completion period taken for Commissioning in (Months )

Guaranteed CUF

Cumulative Actual CUF till date.

1 2 3 4 5 6

Remarks: 1. Bidders shall provide data of at least 6 largest Solar PV Project successfully completed and operational. 2. Bidders shall submit supporting documents like copy of LOI/ WO /Commissioning certificates etc in support of schedule completion period and actual completion period.

Undertaking: We hereby give undertaking that above data and information provided is true in all respect and can be verified independently by GIPCL/GSECL directly from the customers. Further we provide undertaking that no project of 40 MW and above is delayed beyond 6 months from scheduled date of Commissioning.

Date: _________ ____________________________ Place: ________

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Authorized Signatory with seal)

(Sign and Seal of Bidder)

Page 267 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure-A1: Details of Site

1. Site Location: 1.1. The proposed power project shall be located at village Charanka, Taluka- Santalpur, District Patan in the State of Gujarat. 1.2. The site is located at Latitude 23°54’, 20.24”N and Longitude 71°11’54.29”E. 1.3. The nearest urban area from the site is Radhanpur which is located approximately at a distance of 72 kms. 2. Access to Site: The access to the Site is indicated in the schematic provided. 2.1. The site is accessible via NH 15 and other major roads through three single lane approach roads. These are: 2.1.1. The site is best approached from NH 15 (between KM Stone No 186 & 187) through an existing Asphalt road having a carriage way width of about 3.5 M wide (Single lane), covering a length of about 15.5 km. The road passes through the villages of Bakutra and Dhokavada. 2.1.2. Another approach road is a major district road running from Madhutra, Vava, Sakhotra before joining Charanka. Length of the road is 20 km and width of the carriage way is about 3.5m which is asphalted. This alignment generally runs in an undulating and rolling terrain. Part of the road gets inundated during monsoon, making the site inaccessible. 2.1.3. SH No 127 – This SH runs in the north direction covering a length of about 10km up to Jamvada junction beyond which it is a Major District Road to Charanka Village via Fangli village. Total length of the road is 26 km. Part of the road gets inundated during monsoon, making the project site inaccessible. 2.2. Palanpur – Disa – Gandhidham – Kandla Port trust section of the Western railway is running parallel to NH 15 and the nearest rail head is located at Santalpur, which is 16.5 km from the site. 2.3. The nearest international airport from the site is at Ahmedabad, which is at a distance of about 200 km from the site. 2.4. The nearest international airport from the site is at Ahmedabad, which is at a distance of about 200 km from the site

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 268 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

3. Land

3.1. The land for the proposed Project has been acquired. 3.2. The land compromising the Project Site is available for use for this Project. 3.3. The preliminary topographical survey and soil survey has to be carried out by the agency i.e. EPC contractor. The site for proposed project is uneven and requires considerable cutting and filling before starting the construction work. The scope of works shall also include making necessary approaches and measures to minimize soiling and dusting. 3.4. The technical report of geotechnical investigation (Soil Test report) of the site is attached as Annexure A-4 for initial guidance of the Bidder. However the agency has to carry out soil investigation through Govt. Approved laboratory for designing of the civil foundations, structures, control room building, invertor building etc.

3.5. Details of Land for the Project 3.5.1. There are three plots at Gujarat Solar Park where the solar PV power plant is been proposed i.e. Plot A, Plot B (Plot B1 & Plot B2) and Plot C.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 269 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Name

Area (in Acre) Max. MW (AC)

Plot A

188.0

Plot B1

132.0

Plot B2

100.0

Plot C

221.6

Company (SPD)

75 MW

GIPCL

75 MW

GSECL

4. Geology: 4.1. The study area is a part of North Gujarat alluvial plain and geologically it falls within the vast marshy, saline tract of Holocene sedimentation. The area is formed of tidal mudflats and series of off- shore sandbars. Geologically the area is covered with saline tract of brownish grey silt, clay, sand, and murram at depth. In the Patan district nearly 90% of soil is sandy. The alluvial soils are found in the talukas of Santalpur and Radhanpur. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 270 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

4.2. At the site, rocky outcrops have been witnessed in the south and south west direction whereas alluvial thickness increases towards the North.

5. Drainage: 5.1. The site does not have any perennial drainage system. 5.2. One seasonal nalah is traversing the site in north-south direction sloping towards the Little Rann of Kutch. This nalah culminates into a reservoir which is located at the boundary of little Rann of Kutch. This nalah is used only during the monsoon season to drain the excess water of the catchment area. 6. Local Weather Conditions: 6.1. Weather is predominantly dry and arid. 6.2. The general weather characteristics obtained from the Deesa station of IMD, which is about 30km from the site, are as follows:

6.3. The site receives maximum rainfall between July to August. During these two months, continuous heavy downpour happens over a period of 8 to 9 days. In certain days, more than 200 mm of rainfall occurs within 24 hours. 6.4. Limited period of torrential rainfall together with low-lying nature of the topography cause water logging during monsoon period. 7. Water Supply: 7.1. Surface Water: 7.1.1. Nearest source of water is Kutch Branch Canal at Jhajham, which is 10 km away from the identified site.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 271 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

7.1.2. It has been proposed that the Canal will provide water to the site from Patan which is located at chainage of 35 km (Charanka Distributary) along the Kutch Branch Canal.

7.2. Rainwater: 7.2.1. At the given site, rainfall is one of the major sources of water which is primarily used for cultivation. 7.2.2. At present, the rain water is harnessed by construction of temporary check dams. 7.3. Ground Water: 7.3.1. Ground water level ranges between 05 to 10 m. 7.3.2. During soil investigation, groundwater was encountered at a depth of 1.50 m depth. 7.3.3. Ground water in the region is very deep, however due to water logging in the monsoon season and due to hard pan below top soil, perched water table was observed, which is likely to fall below 10 m in summer. 7.3.4. Total dissolve salts of water ranges between 10,000 to 12,000 PPM which mostly depends upon intensity of rainfall. 7.3.5. Apparent Resistivity values of area show a variation below 5 Ohm, which indicates high level of ground water salinity at shallow depth. Due to the high degree of ground water salinity in the area, ground water structures have not been constructed by the farmers.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 272 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure-A2: Advance Payment Guarantee

(To be submitted by Bidder on a Non-Judicial Stamp Paper of Appropriate Value) Date: To, Gujarat Industries Power Company Limited PO:Petrochemicals-391346, Dist.: Vadodara, Gujarat, India

/

Gujarat State Electricity Corporation Limited (“GSECL”) Vidyut Bhwan, Race Course Vadodarar-390 007, Gujarat

Subject: Bank Guarantee No. ____________________

Whereas ____________________, a incorporated under ____________________ having its registered office at ____________________ (hereinafter referred to as the “Contractor ” which expression shall, unless repugnant to the context or meaning thereof, include its successors and permitted assigns) have entered into Agreement for the engineering, procurement ,construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Power Plant at Gujarat Solar Park, Charanka, Gujarat, India, dated ____________________ with Gujarat Industries Power Company Limited (GIPCL) / Gujarat State Electricity Corporation Limited (GSECL), having its registered office at (Insert address of respective company Whereas, under the Agreement a payment of 10 % (ten percent) of the EPC Contract Value is payable in advance to the Contractor, as a security for which the Contractor is required to furnish to GIPCL / GSECL an irrevocable, unconditional, first demand bank guarantee issued for a sum equal to 10% (ten percent) of the EPC Contract Value. And whereas, ____________________ (Insert Bank name) having its registered office at ____________________ and a branch office at ____________________, India, hereinafter referred to as the “Bank” (which expression shall, unless repugnant to context or meaning, be deemed to mean and include its successors), being a Nationalised bank of India and acceptable to GIPCL/ GSECL, has at the request of the Contractor agreed to issue this advance re payment bank guarantee in favour of GIPCL/GSECL. Now therefore this Bank Guarantee witnessed as follows: 1. The Bank hereby undertakes the pecuniary responsibility of the Contractor to GIPCL/GSECL for the repayment of the Work Advance by the Contractor to GIPCL/GSECL and hereby issues GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 273 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

in favour of GIPCL/GSECL this irrevocable and unconditional work advance payment bank guarantee (hereinafter referred to as the “Guarantee”) on behalf of the Contractor in the amount of ____________________ Indian Rupees (insert an amount equal to ten percent (10 %) of the EPC Contract Value). 2. The Bank for the purpose hereof unconditionally and irrevocably undertakes to pay to GIPCL/GSECL without any demur, reservation, cavil, protest or recourse, immediately on receipt of first written demand from GIPCL/GSECL, any sum or sums (by way of one or more claims) not exceeding in the aggregate the amount of ____________________ (insert an amount equal to ten percent (10 %) of the EPC Contract Value) without GIPCL/GSECL needing to prove or to show to the Bank grounds or reasons for such demand for the sum specified therein and notwithstanding any dispute or difference between GIPCL/GSECL and the Contractor in respect of the performance of the Agreement or moneys payable by Contractor to GIPCL/GSECL or any matter whatsoever related thereto. 3. The Bank acknowledges that any such demand by GIPCL/GSECL of the amounts payable by the Bank to GIPCL/GSECL shall be final, binding and conclusive evidence in respect of the amount payable by the Contractor to GIPCL/GSECL. 4. The Bank hereby waives the necessity for GIPCL/GSECL from demanding the aforesaid amount or any part thereof from the Contractor and also waives any right that the Bank may have of first requiring GIPCL to pursue its legal remedies against the Contractor, before presenting any written demand to the Bank for payment under this Guarantee. 5. The Bank further unconditionally agrees with GIPCL/GSECL that GIPCL/GSECL shall be at liberty, without the Bank’s consent and without affecting in any manner the Bank’s obligation under this Guarantee, from time to time, to: a. Vary and / or modify any of the terms and conditions of the Agreement. b. Extend and / or postpone the time for performance of the obligations of the Contractor under the Agreement. c. Forbear or enforce any of the rights exercisable by GIPCL/GSECL against the Contractor under the terms and conditions of the Agreement. and the Bank shall not be relieved from its liability by reason of any such act or omission on the part of GIPCL or any indulgence by GIPCL/GSECL to the Contractor or other thing whatsoever which under the law relating to sureties, but for this provision, would have the effect of relieving the Bank of its obligations under this Guarantee 6. The Bank’s obligations under this Guarantee shall not be reduced by reason of any partial performance of the Agreement. The Bank’s obligations shall not be reduced by any failure by GIPCL/GSECL to timely pay or perform any of its obligations under the Agreement.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 274 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

7. Any payment made hereunder shall be made free and clear of and without for, or on account of, any present or future taxes, levies, imposts, duties, charges, fees, commissions, deductions or withholdings of any nature whatsoever and by whomsoever imposed, and where any withholding on a payment is required by law, the Bank shall comply with such withholding obligations and shall pay such additional amount in respect of such payment such that GIPCL/GSECL receives the full amount due hereunder as if no such withholding had occurred. 8. This Guarantee shall be a continuing bank guarantee and shall not be discharged by the change in constitution of any member of the Contractor and the Guarantee shall not be affected or discharged by the liquidation, winding up, bankruptcy, re organisation, dissolution or insolvency of any member of the Contractor or any other circumstances whatsoever. 9. This guarantee shall be in addition to and not in substitution or in derogation of any other security held by GIPCL/GSECL to secure the performance of the obligations of the Contractor under the Agreement. 10. The Bank agrees that GIPCL/GSECL at its option shall be entitled to enforce this Guarantee against the surety, as a principal debtor in the first instance without proceeding at the first instance against the Contractor. 11. Without prejudice to any continuing liability to perform obligations under this Guarantee which have arisen prior thereto, the Bank shall be released from any further obligations arising hereunder after ____________________ (insert the scheduled date of completion) unless this Guarantee is otherwise extended on account of failure to recover the entire Work Advance from the Contractor by the said date. 12. GIPCL/GSECL may assign this Guarantee to any person and in such case GIPCL/GSECL shall inform the Bank in writing. This Guarantee shall not be assigned or transferred by the Bank. 13. This Guarantee shall be construed and interpreted in accordance with and governed by the laws of India, and subject to Clause 13 above, the courts at Ahmedabad, Gujarat, India shall have jurisdiction over all matters arising out of or relating to this Guarantee. 14. The Bank has the power to issue this Guarantee in favour of GIPCL/GSECL. The aggregate liability of the Bank under this Guarantee shall not under any circumstance exceed ____________________ Indian Rupees (insert an amount equal to ten percent (10%) of the EPC Contract Value). 15. Notwithstanding anything contained herein, this Guarantee shall be valid up to __/__/____. A written claim or demand shall be served upon us on or before the said date, after which this Guarantee shall become null and void.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 275 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

16. No action, event or condition, which by any Applicable Law should operate to discharge the Bank from liability hereunder, shall have any effect and the Bank hereby waives any right it may have to apply such law, so that in all respects its liability hereunder shall be irrevocable and, except as stated herein, unconditional in all respects. 18. Capitalised terms not otherwise defined herein shall have their respective meanings given such terms set forth in the Agreement. In witness whereof, the bank, through its authorized officer, has set its hand and stamp on this ____________________ day of ____________________ 20__.

SEAL AND SIGNATURE OF BANK REPRESENTATIVE

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 276 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure-A3: Plot Details at Charanka Solar Park, Gujarat Refer Attachment 1; Attachment 2; Attachment 3

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 277 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure-A4: Precast Boundary Wall (Fencing)

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 278 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure-A5: Soil Investigation Report

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 279 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 280 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 281 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 282 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 283 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 284 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 285 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 286 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure-A6: Water Test Report

Before treatment

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 287 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 288 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 289 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

After treatment GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 290 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 291 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 292 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure A7: Operation and Maintenance

Operation and Maintenance (O & M) Operation & Maintenance period shall be as mentioned in NIT. The start of O&M and first year operation shall be considered after successful completion of operational acceptance test or 60 days from date of commissioning of 75 MW (AC) whichever is earlier. Further all the guarantees related to NEEGG / Incentive shall also be applicable. Guideline for Operation and Maintenance (O&M) after O&M: O&M Contract shall cover complete Solar PV Power plant and power evacuation system up to inter connection point (66 kV GETCO end S/S) as specified elsewhere in the Contract. Contractor to achieve guaranteed Generation in respective O&M year. Further, it is the responsibility of the Contractor to liaison with the following authorities: (a) Liaison with State/Central Government. (b) Liaison with State Power Utilities. (c) Liaison with State Renewable Agency. (d) Any other department / agency as may be required. (e) GIPCL/GSECL shall provide required documents. O&M OF PLANT Comprehensive operation & maintenance of the Solar PV plant including supply of spare parts, consumables, repairs/replacement of any defective equipment etc. shall be performed by the Contractor for a period of 05 years (warranty period) + 05 Years. During O&M period, employer personnel shall have unrestricted entry to the solar plant and Control Room any time. GIPCL/GSECL may depute its personals to associate with O&M activities. The Contractor shall assist them in developing expertise through their day to day O&M activities and all records of maintenance must be maintained by the contractor which can be accessed by employer on demand. These recordings are to be handed over to employer after the O&M period of contract. During O & M period, all the annual charges related to GETCO and SLDC shall be in the Scope of Contractor. During the O&M period, the Contactor shall be responsible for any defect in the work due to faulty workmanship or due to use of sub-standard material in the work. Any defects in the work during the warrantee period shall there be rectified/replaced by the contractor without any extra cost to the employer within a reasonable time as may be considered from the date of receipt of

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 293 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

such intimation from employer failing which employer shall take up rectification work at the risk and cost of contractor. The Contractor shall be responsible for supply of all spare parts, repairs / replacement of any defective equipment(s) including civil works at his own cost as required from time to time during the O&M period. During O & M period the Contractor shall be responsible for all the activities required for the successful running, optimum energy generation etc. This shall include but not necessarily be limited to following: 1. Deputation of adequate number of O&M, engineering and supporting personal, security etc. 2. Compliance of rules and regulations defined in GUVNL tender [RFS No. GUVNL / Competitive / 500 MW / Solar dated 15.06.2017] and PPA including subsequent clarifications or amendments issued from time to time] for manpower. 3. O&M Contractor shall have to fill at least 65% of post in supervisory and managerial cadres and 80% of posts in other cadres by the local persons. The expression “Local person “ shall mean a person domiciled in Gujarat state for minimum 15 years shall be considered as local person. 4. Operation part consists of deputing necessary manpower necessary to operate the Solar Photovoltaic Power Plant at the optimum capacity. Operation procedures such as preparation to start, routine operations with safety precautions, monitoring of Solar Power Plant etc. shall be carried out as per the manufacturer’s instructions to have trouble free operation of the complete system. 5. Daily work of the operators in the Solar Photovoltaic Power Plant involves cleaning of Modules, logging the voltage, current, power factor, power and energy output of the solar Power Plant. The operator shall also note down failures, interruption in supply and tripping of different relays, reason for such tripping, duration of such interruption etc. 6. The Contractor shall demonstrate guaranteed generation as quoted in respective O&M year. In case the contractor fails to achieve the guaranteed generation, then penalties shall be recovered as defined in this Tender. 7. Water cleaning of SPV modules. The Contractor shall wash the modules minimum twice in a month and maintain this schedule in its records for the cleaning cycle. 8. Housekeeping of complete power plant. 9. Reporting the energy generation data to GIPCL/GSECL. 10. Monitoring, controlling, troubleshooting, maintaining of records, registers etc. 11. Recording/logging of all the operational parameters (e.g. voltage, current, power factor, energy output, temperature etc.) and preparation of daily/weekly/monthly reports etc. including submission of periodical consolidate plant performance reports to the Owner / GIPCL/GSECL. 12. Conducting periodical checking, testing, over hauling and preventive action of all equipment in systematic method including regular cleaning of PV modules of the solar PV plant as per OEM guidelines. 13. The contractor shall carry out the periodical/plant maintenance as given in the manufacturer’s service manual and requirement.

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 294 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

14. Cleaning including cutting/removing of bushes/vegetation etc. of the complete plant on regular basis and as and when required. 15. Particular care shall be taken for outdoor equipment to prevent corrosion. Cleaning of the junction boxes, cable joints, insulators etc. shall also be carried out at every month interval. 16. Resistance of the earthing system as well as individual earthing is to be measured and recorded every month. If the earth resistance is more than 3 ohm, suitable action is to be taken to bring down the same. 17. According to the recommendations stock of special tools and tackles shall be maintained for Modules, PCU’s and other major electrical equipment. 18. Breakdown / Corrective Maintenance: Whenever a fault has occurred, the contractor has to attend to rectify the fault & the fault must be rectified at the earliest time from the time of occurrence of fault. 19. A maintenance record is to be maintained by the contractor to record the regular maintenance work carried out as well as any breakdown maintenance along with the date of maintenance reasons for the breakdowns steps have taken to attend the breakdown duration of the breakdown etc. 20. The Schedules will be drawn such that some of the jobs other than breakdown, which may require comparatively long stoppage of the Power Plant, shall be carried out preferably during the non-sun period. 21. The Contractor shall ensure that all safety measures are taken at the site to avoid accidents to his employees or his co-contractor’s employees as per prevailing safety rules. 22. In order to ensure longevity, safety of the core equipment and optimum performance of the system the contractor should use only genuine spares of high quality standards. 23. Supply of all spares, consumables and fixing / installation of the same including proper storage of tool, tackles & spares. 24. The Contractor shall at his own expense provide all amenities to his workmen as per applicable laws and rules. 25. The Contractor shall immediately report the accidents, if any, to the Engineer In charge & to all the concerned authorities as per prevailing laws of the state. 26. The Contractor shall comply with the provision of all relevant Acts of Central or State Governments including payment of Wages Act 1936, Minimum Wages Act 1948, Employer's Liability Act 1938, Workmen's Compensation Act 1923, Industrial Dispute Act 1947, Maturity Benefit Act 1961, Employees State Insurance Act 1948, Contract Labour (Regulations & Abolishment) Act 1970 or any modification thereof or any other law relating whereto and rules made there under from time to time. 27. Coordinating, on behalf of GSECL, and obtaining renewal of statutory licenses, clearances and approvals from state departments such as State Electricity Supply & Transmission Boards/CEIG/GEDA etc. 28. Contractor shall keep updating the spares inventory at the site every time there is consumption of spare items towards replacement. 29. Coordinating with sub-station upon grid failures, line problems etc. and implementing the needful steps to restore the plant to normal operation 30. Theft incidents: immediate reporting to GIPCL/GSECL, filing FIRs with police stations on behalf of GSECL, coordination for site inspection by insurance companies and clearance of insurance claims, logging of events (date, time) and maintaining records GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 295 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

31. Proper housekeeping shall be maintained during O&M period by the Contractor. 32. Required security personnel shall be deployed for Plant security, round the clock. 33. Gujarat Solar Park -Annual O&M Charges including water charges to GPCL will be paid by GIPCL/GSECL. All other charges / cost are in the scope of Bidder / EPC Contractor. All the civil defects, rectification, repairing, replacement related to civil works shall be in the scope of contractor during the O&M period. The Contactor shall be responsible for rectification of any defect in the civil work and maintain the structure/buildings in good condition with proper maintenance. The Contractor shall be responsible for the maintenance of each civil works carried out as mentioned below. 1. Buildings Control room premises, Underground water tank includes: I. Water tightness of roof and walls. II. Painting to the structure either PEB/ RCC Framed structure at regular interval (not more than five years). III. Plumbing & Sanitation related defects/replacement. IV. Chalking / overflow of septic tank and soak pit. V. Replacement / repairing of water tank if major/minor leakage observed. VI. Leakage of water to be attended by suitable crack filler. VII. Repairing/replacement of doors, windows, ventilators & rolling shutter. 2.

3. 4.

Road WBM or Bitumen: I. Crack repairing of the road surface. II. Pot-holes over the top road surface to be rectify. III. Maintenance of shoulders for the rain cuts or damage due to some external reasons. IV. Re-carpeting of the road surface at every five years interval. Storm water Drainage: I. Before and after the monsoon season the storm water drainage shall be maintained & cleaned for smoother flow of storm water. Main Entry gate & Fencing: I. Maintain the elegance of entry gate with painting as & when required. II. Repairing & painting of fencing as & when required.

The above list is not exhaustive but indicative only. Although most of the structures are covered here in, any other system (Civil, Structural and Architectural) required for successful operation and maintenance of the works shall form a part of this contract and shall be deemed to be included in the scope of works. The scope of Bidder/EPC Contractor is including supply of all required materials, mobilization of labour, and arrangement of required tools tackles and equipment to carry out all above civil maintenance works. HANDING OVER THE FACILITIES After expiry of O&M period, the Contractor shall hand over the Facilities to Employer in good operating condition along with requisite tools & tackles and spares etc. The Contractor shall demonstrate functional operations of all the major & critical Plant & Equipment. The spare if consumed during O&M period then same shall be replenished at the time of handing over of facilities. GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 296 of 297

Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 2 x 75 MW (AC) Solar Photovoltaic Grid-Connected Power Plant at Gujarat Solar Park, Village Charanka, Taluka : Santalpur, District : Patan, Gujarat. Dated 18th December, 2017

Annexure A8: GUVNL Tender & PPA

Refer Attachment: 4 “GUVNL tender (RFS No. GUVNL / Competitive / 500 MW / Solar dated 15.06.2017 including amendments] (for reference for the relevant points indicated in this EPC Tender)”

--- End of Document---

GIPCL/ Solar/ EPC/ 2017/2x75 MW (AC) Solar PV/ Rev. 1.0 dated 18th December 2017.

(Sign and Seal of Bidder)

Page 297 of 297

1 RFP 2 X 75 MW Gipcl Gsecl at Charanka - PDFCOFFEE.COM (2025)
Top Articles
Latest Posts
Recommended Articles
Article information

Author: Gregorio Kreiger

Last Updated:

Views: 6269

Rating: 4.7 / 5 (57 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Gregorio Kreiger

Birthday: 1994-12-18

Address: 89212 Tracey Ramp, Sunside, MT 08453-0951

Phone: +9014805370218

Job: Customer Designer

Hobby: Mountain biking, Orienteering, Hiking, Sewing, Backpacking, Mushroom hunting, Backpacking

Introduction: My name is Gregorio Kreiger, I am a tender, brainy, enthusiastic, combative, agreeable, gentle, gentle person who loves writing and wants to share my knowledge and understanding with you.